Reports for Electrical Contractor Owners and Site Managers

These reports are read from the quotations, material issues, attendance and bills that the team already enters. Each answers one question that an electrical contractor asks about a site, a client or the store.

Where project figures come from

An electrical firm keeps its records in several places. Quotations sit with the estimator, issues with the store, attendance with the supervisor and bills with the office, and the reports draw these together by site and by client.

The reports

Electrical quotations open, won and lost

Each quotation by client, value, version and status, with the reason given for any that was lost, drawn from the quotation and enquiry records of the estimating team.

Site cost against billing

Material, own labour and subcontracted labour for each job, set beside what has been billed, showing whether a site is running above its quoted cost.

Material issued and stock below reorder

Cable, conduit and fittings issued to each site, and the items the store must buy, taken from the issue and stock records kept by the store keeper.

Attendance and labour cost by site

Days worked by each technician at each site, priced at their own rates, with overtime shown separately for the owner and the accounts desk.

Running bills raised and pending

Bills prepared, sent, certified and still awaiting the client, with the measured quantity behind each.

Client balances, advances and retention

What each client owes, what has been received in advance and what is held back until completion.

Service contracts and visits due

Contracts that renew soon, visits missed and fault calls open, by technician.

Who acts on them

The owner reads site cost and client balances, and the estimator works from the quotation list. The store keeper reads stock below reorder, and the supervisor reads labour cost for the site. Each report can be limited by role. A supervisor sees only the site assigned.

What the figures reflect

Whatever has not been entered cannot appear in a report. If a supervisor has not entered a measurement, the running bill report shows the gap. More reports can be built from what the system already records. They are scoped with the firm during set-up.

Reading the reports as an owner

A report is only useful if it leads to a call or a decision. These are the habits that work.

Start with the sites running hot

Open site cost against billing first. A site that has spent most of its quoted cost with little billed needs a visit this week.

Check cash before the month closes

Client balances and pending running bills show who must be chased. Retention held back is listed apart so it is not mistaken for overdue money.

Keep the store honest

Stock below reorder, set beside material issued, shows whether the store is buying ahead or reacting late.

Questions to put to any reporting tool

  • Does each figure open to the entries behind it?
  • Can a report be cut by site, client, month and technician?
  • Are lost quotations and their reasons reported?
  • Can the accountant get the same figures in a file?
  • Does a missing entry show as a gap rather than a zero?

Reports that help a supervisor

Supervisors get a smaller set, built from their own sites.

Work done against plan

Area by area, planned points against points wired. A lagging floor is obvious.

Attendance for the week

Days marked for each worker, so a missed entry can be fixed before wages are made up.

Open snags

Faults pointed out by the client, with the person responsible and the day each was raised.

Reports read across an owner’s working week

Reports are read at set moments, not all at once. The owner, the site manager and the accounts clerk each open them for their own question. Here is how a working week uses them, from Monday’s planning to Friday’s review. Each reader needs only one or two.

Planning on Monday

On that screen, the owner opens the open quotations and the active sites. Quotes waiting for a reply stand out. The week’s follow-up calls are chosen from that list, not from memory, and a quote left idle is noticed early.

Checking stores midweek

The manager reads material issued against each site. A job using more cable than planned is visible at once. Action is taken before the store runs short, so a site is not left waiting for a drum.

Reviewing attendance and labour

The manager reads labour booked to each site. A site with crowded hands and little progress is spotted. Staff are moved to where the work is waiting, instead of idling on a job that is blocked by others.

Reading bills and balances on Friday

The accounts clerk opens the bills raised and the amounts outstanding by client. Late payers are visible by name. Follow-up calls are scheduled for the coming week, starting with the largest balance and the oldest invoice.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Electrical quotations open, won and lost

Which assumptions stop being valid when the quotation changes?

For “Electrical quotations open, won and lost”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Material issued and stock below reorder

What happens to movements entered while a count is being checked?

For “Material issued and stock below reorder”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.

Background reading: ERPNext: stock reconciliation

FAQ

Frequently asked questions

Are the reports live?

Yes. They change as the supervisor, the store and the office make entries. No month-end collection is needed.

Can a report be limited to one site?

Yes. Every report can be filtered by site, client or date range.

Can contractor reports be exported?

Yes. They can be downloaded for the accountant or printed for a meeting.

Is profit by site calculated?

It shows billing against recorded cost. How overheads are shared across sites is the firm’s decision, made with its accountant.

Which report should a small firm start with?

Site cost against billing. It answers the owner’s first worry, whether a job is making or losing money. Add client balances next.

Why does a report show a gap for one site?

Something was not entered, such as a measurement or a material issue. The report shows the gap on purpose so someone can fill it.

Can I see the number of quotations I win?

Yes. Quotations are listed as won, lost or open, by client and by month. The lost ones carry the reason you chose.

Do reports include subcontractor payments?

Yes. Payments to gangs and subcontractors sit in site cost beside material and own labour. The owner can see all three for a job.

Where it fits

How this feature fits the system.

Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and estimates

Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.

Estimate/Quotation Management

Site jobs and work orders

Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.

Work Order Management

Material issue and site stock

Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.