Reports for Electrical Contractor Owners and Site Managers
These reports are read from the quotations, material issues, attendance and bills that the team already enters. Each answers one question that an electrical contractor asks about a site, a client or the store.
Where project figures come from
An electrical firm keeps its records in several places. Quotations sit with the estimator, issues with the store, attendance with the supervisor and bills with the office, and the reports draw these together by site and by client.
The reports
Who acts on them
The owner reads site cost and client balances, and the estimator works from the quotation list. The store keeper reads stock below reorder, and the supervisor reads labour cost for the site. Each report can be limited by role. A supervisor sees only the site assigned.
What the figures reflect
Whatever has not been entered cannot appear in a report. If a supervisor has not entered a measurement, the running bill report shows the gap. More reports can be built from what the system already records. They are scoped with the firm during set-up.
Reading the reports as an owner
A report is only useful if it leads to a call or a decision. These are the habits that work.
Questions to put to any reporting tool
- Does each figure open to the entries behind it?
- Can a report be cut by site, client, month and technician?
- Are lost quotations and their reasons reported?
- Can the accountant get the same figures in a file?
- Does a missing entry show as a gap rather than a zero?
Reports that help a supervisor
Supervisors get a smaller set, built from their own sites.
Reports read across an owner’s working week
Reports are read at set moments, not all at once. The owner, the site manager and the accounts clerk each open them for their own question. Here is how a working week uses them, from Monday’s planning to Friday’s review. Each reader needs only one or two.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
Electrical quotations open, won and lost
Which assumptions stop being valid when the quotation changes?
For “Electrical quotations open, won and lost”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Material issued and stock below reorder
What happens to movements entered while a count is being checked?
For “Material issued and stock below reorder”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.
Background reading: ERPNext: stock reconciliation
Frequently asked questions
Are the reports live?
Yes. They change as the supervisor, the store and the office make entries. No month-end collection is needed.
Can a report be limited to one site?
Yes. Every report can be filtered by site, client or date range.
Can contractor reports be exported?
Yes. They can be downloaded for the accountant or printed for a meeting.
Is profit by site calculated?
It shows billing against recorded cost. How overheads are shared across sites is the firm’s decision, made with its accountant.
Which report should a small firm start with?
Site cost against billing. It answers the owner’s first worry, whether a job is making or losing money. Add client balances next.
Why does a report show a gap for one site?
Something was not entered, such as a measurement or a material issue. The report shows the gap on purpose so someone can fill it.
Can I see the number of quotations I win?
Yes. Quotations are listed as won, lost or open, by client and by month. The lost ones carry the reason you chose.
Do reports include subcontractor payments?
Yes. Payments to gangs and subcontractors sit in site cost beside material and own labour. The owner can see all three for a job.
How this feature fits the system.
Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotations and estimates
Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.
Estimate/Quotation ManagementSite jobs and work orders
Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.
Work Order ManagementMaterial issue and site stock
Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.
Stock Tracking and AlertsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements