Skip to main content
GullySystem

Material Issue and Site Stock for Electrical Contractors

Cable, conduit, MCBs, panels and fittings are issued from the store against a named site. Returns and balances are recorded, so material cost for each electrical job can be read.

The store and the item list

An electrical store holds small items alongside drum cable and large panels. Each is set up with the unit it is bought in and the unit it is issued in.

Items and units

Wire is bought in coils and issued in metres. Conduit is bought by the length, and switches and MCBs are counted in numbers.

Make and size

Cable size, core count, MCB rating and the make of a fitting are kept on the item. Two sizes of one cable never share a balance.

Reorder level

A level is set for each item the store must not run out of. Anything under it lands on the purchaser’s list.

Issue, return and transfer

Every movement out of the store has a site name against it. Nothing leaves on a verbal request.

Issue to a site

The store keeper issues material on the supervisor’s request, with the quantity, date and the technician who took it.

Return of unused material

A cut length of cable or a box of unused switches comes back to the store. The job’s material cost reduces by that amount.

Transfer between sites

Material moved from a finished site to a running one is recorded as a transfer. That cost moves with it.

Wastage and the small items

Estimators add an allowance for cut ends, bends and looping, and the figure is best taken from your past jobs. Keep it as its own line, apart from the measured quantity. Terminations, lugs, ferrules and conduit fittings are the items left out most. Their cost seeps into a job unseen. Agree a norm for each material before work begins. A dispute over missing cable is far easier when both sides signed the same norm.

Material cost against the job

Material cost is added up for each site. The total is read against the quantity planned in the quotation. Where a site has used more cable than its points justify, the difference is visible while the job is still running.

How to read a site that overran

  • Compare cable issued with the metres the measured points need
  • Look for returns that were never entered
  • Check transfers to a neighbouring site
  • Ask whether the route was longer than the drawing showed

Counting the store

A physical count compares the shelf with the book. Count the busy items on a short cycle and the slow ones on a long one. Enter each count and read the differences list. A drum of cable that is short by a few metres may be a missed return. A big gap on a panel or a meter is worth a talk with the store keeper the same day.

What stock records do not cover

Purchasing from a supplier is a separate step, handled in purchase records. Wastage allowances, the rate at which unused cable is valued and how a supplier’s credit note is treated are decided with the contractor and the accountant.

A day at the store counter and on site

Cable, conduit and fittings change hands several times a day. The storekeeper, the supervisor and the technician each leave a trace in the record. This is how one day runs, from the first issue at the counter to the evening return. Nothing moves unrecorded.

Issuing in the morning

A technician asks for cable, MCBs and clips for a named site. The storekeeper enters each item and quantity against that site. Store balance drops at once. The next request sees real stock, not yesterday’s number.

Returning leftovers at the end

A technician brings back an unused drum and a box of fittings. Stock comes home. The storekeeper records the return against the same site, so the material cost for that job reflects what was truly consumed.

Transferring between sites

A supervisor moves conduit from a finished site to a new one nearby. The transfer is entered as a move, not as a loss followed by a fresh purchase of the same material. Both sites show the right cost.

Counting at the day’s close

Before locking up, the storekeeper compares the shelf with the screen for the fast-moving items. A mismatch is explained before anyone leaves the store for the night, and the cause is noted. Small differences are caught early.

Store rules to settle before the first issue

The owner, the storekeeper and the supervisors agree a few of them before stock is entered. They keep the count honest. They also keep the cost of each site readable.

Who may issue and receive stock

Anyone else asks them. This keeps each entry tied to a person who can explain it later, when a count does not agree with the shelf.

How items are coded and named

Settle one name and one unit for each item, such as cable by the metre and MCBs by piece. Duplicates confuse the count. A clean list is quicker for the storekeeper at the counter, especially at the morning rush.

What counts as wastage

Decide which cut-offs and breakages are written off against a site and which need a stated reason. Small items like clips and tape may be charged in bulk to a job each month. Write the rule once.

How existing stock is brought in

Do a physical count before go-live and enter the figures item by item. The system starts from that count. Later differences then point to real movement, not to old errors that nobody in the office could explain.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

What stock records do not cover

What happens to movements entered while a count is being checked?

For “What stock records do not cover”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.

Background reading: ERPNext: stock reconciliation

FAQ

Frequently asked questions

Can cable be issued in metres from a drum?

Yes. The drum is received as a whole and issued by length, and the balance on the drum is kept.

Can a technician take material without the store keeper?

Not unless you permit it. Firms that want one person responsible let only the store keeper record an issue.

Does it show material cost for a site?

Yes. Everything issued, less returns, is priced and added up for each site.

Is there a stock count?

Yes. A physical count can be entered, and the difference from the book balance is listed for the owner to review.

How do I allow for cable wastage?

Keep a separate allowance line and base it on your own past sites. Agree the norm for each material before the job starts.

Can I see which items sit below reorder level?

Yes. A list shows each short item with its balance, so the purchaser orders before a site stops.

What if material is issued to the wrong site?

Transfer it to the right one. Both sites show the movement, and the cost shifts with the material.

Where it fits

How this feature fits the system.

Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotations and estimates

Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.

Estimate/Quotation Management

Site jobs and work orders

Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.

Work Order Management

Material issue and site stock

Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements