Material Issue and Site Stock for Electrical Contractors
Cable, conduit, MCBs, panels and fittings are issued from the store against a named site. Returns and balances are recorded, so material cost for each electrical job can be read.
The store and the item list
An electrical store holds small items alongside drum cable and large panels. Each is set up with the unit it is bought in and the unit it is issued in.
Issue, return and transfer
Every movement out of the store has a site name against it. Nothing leaves on a verbal request.
Wastage and the small items
Estimators add an allowance for cut ends, bends and looping, and the figure is best taken from your past jobs. Keep it as its own line, apart from the measured quantity. Terminations, lugs, ferrules and conduit fittings are the items left out most. Their cost seeps into a job unseen. Agree a norm for each material before work begins. A dispute over missing cable is far easier when both sides signed the same norm.
Material cost against the job
Material cost is added up for each site. The total is read against the quantity planned in the quotation. Where a site has used more cable than its points justify, the difference is visible while the job is still running.
How to read a site that overran
- Compare cable issued with the metres the measured points need
- Look for returns that were never entered
- Check transfers to a neighbouring site
- Ask whether the route was longer than the drawing showed
Counting the store
A physical count compares the shelf with the book. Count the busy items on a short cycle and the slow ones on a long one. Enter each count and read the differences list. A drum of cable that is short by a few metres may be a missed return. A big gap on a panel or a meter is worth a talk with the store keeper the same day.
What stock records do not cover
Purchasing from a supplier is a separate step, handled in purchase records. Wastage allowances, the rate at which unused cable is valued and how a supplier’s credit note is treated are decided with the contractor and the accountant.
A day at the store counter and on site
Cable, conduit and fittings change hands several times a day. The storekeeper, the supervisor and the technician each leave a trace in the record. This is how one day runs, from the first issue at the counter to the evening return. Nothing moves unrecorded.
Store rules to settle before the first issue
The owner, the storekeeper and the supervisors agree a few of them before stock is entered. They keep the count honest. They also keep the cost of each site readable.
Agree the evidence before signing off this part.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
What stock records do not cover
What happens to movements entered while a count is being checked?
For “What stock records do not cover”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.
Background reading: ERPNext: stock reconciliation
Frequently asked questions
Can cable be issued in metres from a drum?
Yes. The drum is received as a whole and issued by length, and the balance on the drum is kept.
Can a technician take material without the store keeper?
Not unless you permit it. Firms that want one person responsible let only the store keeper record an issue.
Does it show material cost for a site?
Yes. Everything issued, less returns, is priced and added up for each site.
Is there a stock count?
Yes. A physical count can be entered, and the difference from the book balance is listed for the owner to review.
How do I allow for cable wastage?
Keep a separate allowance line and base it on your own past sites. Agree the norm for each material before the job starts.
Can I see which items sit below reorder level?
Yes. A list shows each short item with its balance, so the purchaser orders before a site stops.
What if material is issued to the wrong site?
Transfer it to the right one. Both sites show the movement, and the cost shifts with the material.
How this feature fits the system.
Electrical Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotations and estimates
Quotations are built from the firm’s rate list by point, item or area, and a client’s BOQ is priced line by line with approvals recorded.
Estimate/Quotation ManagementSite jobs and work orders
Each accepted quotation runs as a site job with floors, work stages, a team, a supervisor and a snag list.
Work Order ManagementMaterial issue and site stock
Cable, conduit, MCBs, panels and fittings are issued against a named site, and unused material returns to the store.
Stock Tracking and AlertsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements