Skip to main content
GullySystem
← Back to the guide

Worksheet

Fabrication and assembly needs map

A two column worksheet. The left column lists fabrication records: drawing revision, cut list, weld sign-off, remnants and scrap reasons, and the right lists kit status, serial number, torque, pressure test and inspection. A middle row marks each handover field.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Fabrication shop vs assembly line software needs in farm machinery”, www.gullysystem.com/blog/fabrication-shop-vs-assembly-line-software-needs-in-farm-machinery