Worksheet
PLC panel FAT record sheet
Page one of this two page sheet holds the job header, drawing revision, and instrument list with calibration dates, plus space for the customer’s witness name. Page two is a table of check, expected result, actual result, pass or fail and initials, grouped as visual, earth, insulation, I/O, safety and communications. Signatures close the sheet.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Factory acceptance test checklist for PLC control panels”, www.gullysystem.com/blog/factory-acceptance-test-checklist-for-plc-control-panels