Worksheet
Maintenance maturity comparison
A side-by-side table of scheduled, condition-based and predictive maintenance. Four columns cover the trigger, the data needed, the running cost and the route from today. Use it to place each asset on the curve.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Trigger | Data needed | Running cost | Route from today |
|---|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “How IoT Can Support Predictive Maintenance”, www.gullysystem.com/blog/how-iot-can-support-predictive-maintenance