Skip to main content
GullySystem
← Back to the guide

Worksheet

Maintenance maturity comparison

A side-by-side table of scheduled, condition-based and predictive maintenance. Four columns cover the trigger, the data needed, the running cost and the route from today. Use it to place each asset on the curve.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemTriggerData neededRunning costRoute from today

Cross out or rewrite any heading that does not fit your business. From the guide “How IoT Can Support Predictive Maintenance”, www.gullysystem.com/blog/how-iot-can-support-predictive-maintenance