Worksheet
Drawing release and recall sheet
The sheet splits into three parts. Part one records part number, new revision letter, release date, releasing engineer and reason for change. Part two gives each open work order a decision: scrap, rework, use as is or deviation. Part three logs printout locations with a recalled-by name and date.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “How to control drawing revisions across the shop floor”, www.gullysystem.com/blog/how-to-control-drawing-revisions-across-the-shop-floor