How to find the right PLC programme version when a machine stops

Ganesh HSStrategy and Technology, GullySystem
Practical advice · 5 min read

In this guide 6 sections
The short answer

Keep one controlled store where each PLC programme backup is filed under project, machine serial number and visit date, and note which revision was left running after every visit. Then a stopped machine means opening one matching file, and the engineer never searches laptops, USB sticks and old email attachments at midnight.

The call comes in and nobody knows which file is current

A packaging line stops at night, the customer’s technician reads out a serial, and your engineer finds four files named final, final2 and final_new. None of them carries a date, an author or a note about the controller it was loaded into, so the names tell the engineer nothing.

Which file runs in the controller right now, after three site visits by two engineers and one edit by the customer’s own maintenance team? Nobody can say. So the engineer drives two hours to site just to upload from the PLC and compare it by hand against whichever copy looks newest.

That drive repeats whenever the file trail is unclear, whether the customer runs a bottling plant or a textile mill, because nobody can prove which revision is live. The fix is dull but works.

Where backups actually live

Count where files sit today, from the van laptop to the memory stick taped inside a control cabinet door, because each holds a copy either current or stale. You cannot tell which.

Engineers keep private copies on their own laptops because they do not trust the shared folder, and years of overwritten files and half-finished uploads usually explain why. Clean the folder first. The habit follows the trust.

List every location for one customer, because the real latest version often sits on the laptop of an engineer who has left the firm.

  • Engineer laptops and personal drives
  • USB sticks left in the service van
  • Email attachments sent to the customer
  • A shared folder with unclear names
  • Copies inside the HMI or SCADA project

Tie every revision to a project, serial and visit

A file name alone is no record. Pair each backup with a small entry naming the project, the machine serial, the PLC model, the engineering software version used to open it and the date.

Add what changed and why in words a different engineer could follow without phoning the author, because the person who wrote the change is unreachable when the fault arrives. Added a conveyor interlock after a jam. Changed a timer on the sealing station. One line, written then, is enough.

Then log each site visit against the same machine and note which revision was left running, since that single line answers the midnight question. Writing it takes thirty seconds.

  • Project and machine serial number
  • PLC model and engineering software version
  • Revision label and what changed
  • Who made the change and on which visit
  • Checksum or upload date from the controller

Compare the controller with the file before you change anything

At site, upload the running programme first and compare it with the stored one, because a match proves you hold the right file. Otherwise someone changed the machine unannounced.

Save the uploaded copy as a new entry marked found on site, and never overwrite your stored revision, because both are evidence and the gap between them matters.

Make your change from the matched file, using the engineering software version that last saved it, since a newer release may refuse to download back to an older controller. Upload again after the fix. Log it before you drive off.

Make the habit stick with a short routine

Rules fail when they take long. Keep the routine to four steps, namely upload on arrival, compare, change, then upload and log on departure, and print them on a laminated card for the service bag.

Keep the review light. Pick three machines at random and check that the stored file matches what is running, since any mismatch shows exactly where the habit is slipping.

Five machines are enough to begin. Choose the five you service most often, build their records first, and add the rest of the fleet as each visit puts you in front of the cabinet.

PLC programme revision log

Each backup gets one line in a log with columns for customer, project, machine serial, PLC model, software version, revision label, change note, engineer, visit date and file location. Beneath the table sit the arrival steps of upload, compare, change, re-upload and sign, and a footer box records the revision left running at the end of the visit.

Open a blank worksheet to print

Questions owners ask

Why do PLC backups get lost?

Engineers save to laptops and USB sticks for speed, file names drift, and nobody records what was left running, so the real latest file becomes hard to find.

Should we back up the HMI as well?

Yes. Store HMI and SCADA projects with the same serial and visit note as the PLC file, because a mismatch between them causes faults that look like programme errors.

How often should backups be taken?

Take one at every site visit, before and after any change, and at commissioning, because the running programme most often drifts from the stored copy at those moments.

Can version control tools like Git help?

They can for text based programme exports. Many PLC projects are binary files, so a structured log with controlled storage is the safer starting point until your team trusts a versioning habit.