Worksheet
Hydraulic in-process inspection plan
Single-page table, a row for each checkpoint from tube receipt to pressure test. Columns give the characteristic, drawing limit, gauge used, sample size, frequency, reaction on failure and a box for the reading. A footer holds the test pressure, hold time, lot number and inspector’s signature.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “In-process inspection plan for hydraulic cylinders and fittings”, www.gullysystem.com/blog/in-process-inspection-plan-for-hydraulic-cylinders-and-fittings