Skip to main content
GullySystem
← Back to the guide

Worksheet

Inspection record comparison sheet

A single-page comparison with two columns, sheets and linked record, and rows for revision control, search time, trend, instrument link, audit trail and set up effort. Each row has room for a score. The bottom block holds a timed lot retrieval test, with fields for start time, end time, the number of readings found and any gaps found.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Inspection data in sheets vs a linked inspection record”, www.gullysystem.com/blog/inspection-data-in-sheets-vs-a-linked-inspection-record