Skip to main content
GullySystem
← Back to the guide

Worksheet

Part serial inspection checklist

A single-page checklist per part serial. Rows: material certificate, heat treatment, coupon tests, NDT reports, dimensional report, weld records, coating record, bolt data and marking photo. Columns: record present, report number, reviewer initials and date. A footer holds the customer release signature.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemRecord presentReport numberReviewer initialsDate

Cross out or rewrite any heading that does not fit your business. From the guide “Inspection records a wind turbine component should carry”, www.gullysystem.com/blog/inspection-records-a-wind-turbine-component-should-carry