Worksheet
Part serial inspection checklist
A single-page checklist per part serial. Rows: material certificate, heat treatment, coupon tests, NDT reports, dimensional report, weld records, coating record, bolt data and marking photo. Columns: record present, report number, reviewer initials and date. A footer holds the customer release signature.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Record present | Report number | Reviewer initials | Date |
|---|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Inspection records a wind turbine component should carry”, www.gullysystem.com/blog/inspection-records-a-wind-turbine-component-should-carry