Machine mobilisation release sheet
One sheet lists each machine on its own row, with five blocks across: permits, operator, transport, condition and insurance. Each block has a tick box, an owner, a date and a document number. The last column holds the release signature, the departure hour meter reading and the arrival reading.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Pre Mobilisation Checklist for Moving Machines to a New Site”, www.gullysystem.com/blog/pre-mobilisation-checklist-for-moving-machines-to-a-new-site