Skip to main content
GullySystem
← Back to the guide

Worksheet

Machine mobilisation release sheet

One sheet lists each machine on its own row, with five blocks across: permits, operator, transport, condition and insurance. Each block has a tick box, an owner, a date and a document number. The last column holds the release signature, the departure hour meter reading and the arrival reading.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Pre Mobilisation Checklist for Moving Machines to a New Site”, www.gullysystem.com/blog/pre-mobilisation-checklist-for-moving-machines-to-a-new-site