Worksheet
Mould history card
A single-page card per mould. The header holds mould number, part number, type, cavity count and drawing revision, while a ruled table below it has columns for date, press and closing shot count. Further columns record the event (run, clean or repair), cavity condition rating, work done, hours down and initials, and the foot lists the storage rack, shelf and bay.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Date | Press | Closing shot count |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Rubber mould maintenance log: what to record for each mould”, www.gullysystem.com/blog/rubber-mould-maintenance-log-what-to-record-for-each-mould