Skip to main content
GullySystem
← Back to the guide

Worksheet

Site measure and handover checklist

A two-part sheet. Part one lists each measure with columns for drawing value, site value, difference and the signature of the client’s representative on every page. Part two is a snag log with number, location, photo reference, defect, owner, target date and closing photo, one row for each fault.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Site measurement and fit out checklist for furniture projects”, www.gullysystem.com/blog/site-measurement-and-fit-out-checklist-for-furniture-projects