Worksheet

Revised schedule planning sheet

A single page in four blocks. Block one logs the revision: part number, drawing revision, old and new quantity, date received. Block two checks material: bill of materials line, stock, open purchase order, promised date, shortage. Block three loads machines by shift with cycle time, die change and maintenance slot. Block four sets the rejection allowance and gross quantity, then the dispatch slot.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Turning a revised OEM schedule into a plan for a Pantnagar supplier”, www.gullysystem.com/blog/turning-a-revised-oem-schedule-into-a-plan-for-a-pantnagar-supplier