Worksheet
Revised schedule planning sheet
A single page in four blocks. Block one logs the revision: part number, drawing revision, old and new quantity, date received. Block two checks material: bill of materials line, stock, open purchase order, promised date, shortage. Block three loads machines by shift with cycle time, die change and maintenance slot. Block four sets the rejection allowance and gross quantity, then the dispatch slot.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Turning a revised OEM schedule into a plan for a Pantnagar supplier”, www.gullysystem.com/blog/turning-a-revised-oem-schedule-into-a-plan-for-a-pantnagar-supplier