Worksheet
Processor job-work tracker
A one-page tracker gives each lot at a processor a line, with columns for processor, lot, quality, rolls sent, metres out, width out, process asked and shrinkage allowed. Further columns record date sent, promised date, rolls back, metres back, seconds, shortage and days at processor, so one glance shows the age of every open lot. A footer totals shortage by processor.
Name: ______________________ Business: ______________________ Date: ______________
Scroll the table sideways to see every column.
| Item | Who owns it | Where it is kept today | What is missing |
|---|---|---|---|
Cross out or rewrite any heading that does not fit your business. From the guide “Why fabric sent out for processing comes back short or late”, www.gullysystem.com/blog/why-fabric-sent-out-for-processing-comes-back-short-or-late