Skip to main content
GullySystem
← Back to the guide

Worksheet

Moulding rejection log template

One row per production run. Columns hold date, shift, machine, mould, cavity, resin grade and lot, regrind ratio, standard and actual cycle time, shots since maintenance, defect code and quantity. A second block lists each mould repair, polish and vent cleaning with its date, the shot count at that point and the name of the toolroom fitter.

Name: ______________________   Business: ______________________   Date: ______________

Scroll the table sideways to see every column.

ItemWho owns itWhere it is kept todayWhat is missing

Cross out or rewrite any heading that does not fit your business. From the guide “Why moulding rejections keep returning: what job cards miss”, www.gullysystem.com/blog/why-moulding-rejections-keep-returning-what-job-cards-miss