What to ask for when choosing software for aerospace and aviation manufacturers.
A checklist built from how aerospace and aviation manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Quotation from drawing and specification
- Orders, flow-downs and delivery dates
- Routing, work orders and scheduling
- Material, heat and lot traceability
- Inspection, first article and nonconformance
- Outside processing and special processes
- Gauge calibration and shipping records
- Customer flow-down clause register
- Calibration due list for gauges
- Counterfeit and supplier approval list
Roles that need their own access
Who logs in, and what each person may see or change.
- For owners and plant heads
- For planners and estimators
- For machinists and operators
- For inspectors and the quality manager
- For stores and purchasing
Reports to ask for
Ask to see each one with your own sample data.
- Quotations by outcome: open, won, lost
- Work orders by machining centre and status
- Billet, plate and forgings issued to each job
- Lots out with vendors and their promised return
- Nonconformance reports by cause and state
- Gauges and probes coming due for calibration
- Shipments and billing by customer
Systems it may need to connect to
Note which ones you already run.
- SMS
- WhatsApp or other messaging
- Accounting software export
- Barcode scanners
- Document storage
Questions for any vendor
Put these to every supplier you are comparing.
- Is it for machining, assembly or both?
- Can we trace a serial number to its material?
- How are drawing revisions controlled?
- Can it handle first article inspection?
- Does it follow aerospace quality standards?
- Can parts go out to vendors for special processes?
- Can our open orders and heat-numbered stock be loaded?
- Who owns the data?
- What does it cost?
- How long before the machining cells run on it?
- What should the quality manager and planner have ready?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Revisions live in several places
- Traceability is rebuilt after the fact
- Outside processes lose track of the part
- Nonconformances are closed on paper
- Gauges and tooling fall out of date
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Routing, work orders and scheduling
Is the plan based on demand that is still open?
Review “Routing, work orders and scheduling” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Quotation from drawing and specification
Which assumptions stop being valid when the quotation changes?
For “Quotation from drawing and specification”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Prefer to talk it through? See the aerospace and aviation manufacturers page.
