Skip to main content
GullySystem

Manufacturing · Software for aerospace and aviation manufacturersKeep every part, drawing revision, first article and certificate of conformance on one record.

Aerospace and aviation manufacturers make machined brackets, fittings, fasteners, cabin interiors and ground support equipment against customer drawings and specifications. The software links each order to its mill certificates, routing, inspections and shipping papers. Any part traces back to its bar, its spindle and its operator, with the quality record held beside the job.

At a glance

A part for an aircraft is never only a part. It is a drawing at a named revision and a heat of 7075 plate or Ti-6Al-4V bar with a mill certificate. Add the operations, the inspection record and a certificate of conformance that travels with the shipment.

Manufacturing software for these shops keeps all of that together. Nothing is rebuilt afterwards. Everyone from planner to quality manager reads the same job record. A question about one serial number is settled on screen, with no search through cabinets of certificates.

How the work runs today

A buyer sends a purchase order with a drawing, a revision letter, a material specification and a list of flow-down clauses. The estimator prices the part from bar weight, spindle hours, special processes and inspection. Once the order is accepted, the planner builds a routing: sawing, milling, deburring, stress relief, anodising or chromate conversion, fluorescent penetrant inspection, final inspection and packing. Some steps happen at approved outside vendors. The part leaves the building and must return with its paperwork.

On the floor, each operator books time against an operation and records what was made. The inspector checks bores, hole positions and thread classes against the drawing, notes first article results and raises a nonconformance report when a dimension falls out of limits. Stores holds material by heat or lot number. Nothing moves without a record. Before anything ships, the quality manager goes through the complete record, signs the certificate of conformance and only then releases the order. Calibration dates for thread plug gauges, micrometers and torque wrenches are watched quietly in the background, because one expired gauge puts every reading it touched in doubt.

Where it breaks

What goes wrong for aerospace and aviation manufacturers without a proper system.

Revisions live in several places

The drawing on the shop floor, the one in the quote and the one in the buyer’s latest email can differ by a single letter. An inspector measures a bore against the wrong sheet. Rework follows.

Traceability is rebuilt after the fact

Mill certificates sit in a cabinet, spindle logs sit on the controller and inspection sheets sit on clipboards. Joining them for one customer query costs a day of searching through three places.

Outside processes lose track of the part

Parts sent for heat treatment, anodising or penetrant testing return with a certificate that may or may not match the delivery note. The status of each lot is held in a planner’s head, and the lot sits idle on a rack.

Nonconformances are closed on paper

A rejection is noted, a corrective action is promised and the follow-up is left to memory. The same burr or the same out-of-round bore returns on the next order from that buyer.

Gauges and tooling fall out of date

Calibration due dates sit in a spreadsheet that one person updates. A job is checked with a bore gauge that fell due last month, and every reading from it is suspect.

What changes

What aerospace and aviation manufacturers gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

One job record for planner and quality manager

The planner and the quality manager read the same job: order, revision letter, routing, certificates and flow-down clauses. A question about one serial number is settled on screen. Nobody searches cabinets. Conflicting versions of a requirement stop circulating between the office and the shop floor.

A changed revision reopens the quote

When the buyer’s latest email moves a drawing by one letter, the quotation and the floor copy are both flagged. The estimator reprices from the new geometry. The inspector measures a bore against the right sheet. Rework from a stale drawing drops out of the week.

Bar to shipment on a single trace

Each part links to its mill certificate, its heat of 7075 or Ti-6Al-4V, the spindle, the operator and the inspection record. The certificate of conformance is built from the job. Customer audits are answered by opening one file per order. Nothing is rebuilt afterwards. Nothing is lost between departments.

Outside processes that come back with paper

Anodising, stress relief and fluorescent penetrant inspection at approved vendors are logged as operations with a due date. A part that leaves the building is expected back with its certificate. Packing waits until the paper arrives. The quality manager sees what is still out. The vendor’s due date is on the screen.

Flow-down clauses carried to the shop

Special requirements in the purchase order appear on the routing for planners and inspectors. Nobody discovers a required test at final inspection. The buyer’s clauses are tracked line by line from release to shipping. Each one shows who confirmed it and on which date. Customer audits close without a search.

What the software does

What we would build for aerospace and aviation manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Quotation from drawing and specification

Price a part from bar weight, spindle hours, special processes and inspection, and keep the quotation linked to the drawing revision it was built on. A changed revision reopens the price.

Orders, flow-downs and delivery dates

Hold each customer order with its revision, quantity, required certificates, flow-down clauses and ship date, so planners and the quality team read identical requirements before release.

Routing, work orders and scheduling

Build a routing for each part number, release work orders by operation, and see which machine and operator carries each step. Late operations show to the planner as they slip.

Material, heat and lot traceability

Receive bar, plate and forgings against their mill certificates, issue them to jobs by heat or lot, and trace any finished serial number back to the bar it was sawn from.

Inspection, first article and nonconformance

Log first article results, in-process checks and the final inspection. Every nonconformance report gets a corrective action, a named owner and a due date, and it stays open until closed.

Outside processing and special processes

Send parts to approved vendors for heat treatment, plating or penetrant testing, then match the returning certificate to the lot before it moves on. A missing certificate holds the next operation.

Gauge calibration and shipping records

Track gauge and torque wrench calibration due dates. Then assemble the certificate of conformance, packing list and invoice for each shipment straight from the job file.

Customer flow-down clause register

Contract staff record the specification clauses a buyer passes down on a purchase order. Clauses link to the departments they touch. Planners see what the part must meet before release.

Calibration due list for gauges

Quality staff hold every gauge, micrometer and CMM probe with its calibration date and next due date. Overdue tools are blocked from use. Inspectors check the list before signing a report.

Counterfeit and supplier approval list

Purchasing keeps the approved supplier list with scope, audit date and certificates. A part from an unlisted source is held at goods receipt. Quality staff review the list at each audit.

Before you talk to a supplier

A requirements checklist for aerospace and aviation manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules aerospace and aviation manufacturers use most.

Each one is also available on its own, or inside a system built for you.

Estimate/Quotation Management

Estimators price a bracket from bar weight, spindle hours, special processes and inspection time. The drawing revision is recorded on the quotation. A revised drawing creates a revised price.

Learn more

Order Management

A buyer’s purchase order is held with drawing letter, quantity, delivery date and flow-down clauses. Partial shipments are tracked against it. Customer service sees what is late and why.

Learn more

Bill of Materials

A fitting’s bill lists bar stock, fasteners, seals and bought-out items against the drawing revision. Allowed scrap is entered per part. Planners read the right revision when releasing work.

Learn more

Work Order Management

A routing runs through sawing, milling, deburring, stress relief and anodising. Every step logs the operator, the machine and the time. Delayed jobs show where they are waiting.

Learn more

Batch and Serial Tracking

Heat numbers and mill certificate references follow bar and plate to the finished part. A serial number records the lot used. A shipped bracket traces to its melt.

Learn more

Quality Control

First article reports, in-process dimensions and final inspection are recorded against the drawing revision. Nonconformances are raised with a disposition such as rework or scrap. Concessions are tracked until the customer replies.

Learn more

Job Work Management

Anodising, chromate conversion, heat treatment and non-destructive testing go to approved outside processors. Each delivery is logged with the certificate expected. Parts do not ship before the paper returns.

Learn more

Asset AMC Tracking

Five-axis machines, CMMs, furnaces and test rigs are held with their service contract and warranty. Next service dates show on the maintenance calendar. Vendor reports are filed against the machine.

Learn more
AI by department

Where AI can help aerospace and aviation manufacturers.

Each one reads records you already keep, and a person approves every decision.

Worldwide

Where we work with aerospace and aviation manufacturers.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Routing, work orders and scheduling

Is the plan based on demand that is still open?

Review “Routing, work orders and scheduling” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

Quotation from drawing and specification

Which assumptions stop being valid when the quotation changes?

For “Quotation from drawing and specification”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Common questions

Questions aerospace and aviation manufacturers ask before they call.

Can a finished part be followed back to its bar?

Yes. Material is received against its mill certificate and issued to a job by heat or lot number. A finished serial number then links back to that bar, the operations performed and the inspections signed.

Does it replace our quality management system?

No. It holds the records your quality system already asks for, such as inspections, nonconformances and certificates. Which procedures apply, and how they are audited, is reviewed with your quality manager during implementation.

Can we run parts through outside vendors?

Yes. A lot sent for heat treatment, plating or penetrant testing is recorded when it leaves and again when it returns. The vendor’s certificate is attached to that lot before the next operation can start.

Do small aerospace shops need this?

Not always. A shop making a few brackets a month for one buyer may manage with a disciplined file system. Several customers, outside processes and serialised parts are where one shared record begins to earn its place.

How is an aerospace parts shop system quoted?

The drawing-and-revision register, bar and heat traceability, and outside special processes each add scope. So do sites, users, and any gauges or inspection machines to link. Older part files and routings that must come across add effort. Your own records are demonstrated on screen. Each part is priced in the quotation that follows.

What does an aerospace shop hand over before work starts?

Bring current purchase orders with their flow-downs, a few drawings with revision letters, routings, inspection reports and the gauge calibration list. Add the approved outside-process vendors. Someone in estimating, planning, quality and shipping needs time to field questions and review screens.

Who holds the part and inspection records if we leave?

Yes. The shop holds title to the software and all its records, and the files can be written out in open formats at any time. Care of the system stays with those who build it. GullySystem runs the hosting, or somewhere else if you prefer.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements