Skip to main content
GullySystem

Manufacturing · Software for automotive component manufacturersMatch each buyer’s schedule, rejections and dispatch to the exact lots your press, machine and moulding lines made.

Automotive component makers supply pressed, machined, cast, moulded and assembled parts to vehicle makers and Tier-1 buyers against monthly schedules, with a quality file kept in folders. Schedules arrive on a portal and rejections return as debit notes. The software ties each schedule line to work orders, job cards, inspection, bin labels and dispatch, so returned parts lead to their lot.

At a glance

You make brackets, progressive-die pressings, turned shafts, aluminium castings, EPDM rubber seals and plastic clips, or sub-assemblies of them, for vehicle makers and their Tier-1 suppliers. Every part number has an approved process and a packing standard. Each buyer counts defects per million parts.

Volumes follow the buyer’s production plan, which moves every month, and prices are fixed tightly, so scrap, premium freight and unchecked debits come straight out of what the plant earns. Margins are thin.

How the work runs today

The month starts with a schedule from each buyer, read off a supplier portal or a mailed file and revised mid-month. Planning splits it into weekly quantities, checks coil, bar and tooling, and releases work orders to the press shop, machine shop or moulding line.

Parts pass through blanking, forming, machining or moulding with first-off approval and in-process checks on a CMM or go/no-go gauge, then final inspection and packing in the buyer’s bins. Every bin needs a label. Dispatch raises the invoice and posts the advance shipping notice.

The buyer’s receipt note, line rejections and debit notes follow later, and accounts matches them against invoices by hand while quality answers each complaint with an eight-discipline corrective action report. Paper everywhere.

Where it breaks

What goes wrong for automotive component manufacturers without a proper system.

Schedules change faster than the plan

A revised schedule lands mid-month while the whiteboard still shows last week’s quantities, so one bracket runs short and another piles up beside the press. Premium freight pays for the gap. Planners firefight.

Debit notes are accepted without checking

Line rejections, shortages and rate differences come back as debits against invoices, and nobody sets them against the bins that were shipped, so the amount is simply written off, month after month. Quiet leakage.

A complaint cannot be traced to its lot

The buyer reports a burr or porosity on a part number, and the plant cannot say which shift, press, die set or coil heat made it. Containment becomes guesswork while stock at the buyer’s line waits.

Internal rejection is not counted by part

Scrap, rework and sorting are noted on paper at each stage, then totalled at month end without the reason. Flash, short shot and out-of-size repeat because nobody sees the pattern by part.

Bins leave with the wrong label

A handwritten label carries the wrong part number or quantity, and the buyer’s stores hold the whole consignment at the gate while their line waits. Sorting on their dock happens at your cost.

What changes

What automotive component manufacturers gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Schedule changes reaching the work orders

A revised schedule from the buyer’s portal changes the weekly quantities and the work orders behind them. Planning sees coil, bar and tooling against the new figures. The press shop does not run last week’s plan. Planning keeps pace. Press and machine shop receive current quantities.

Debit notes checked before they are accepted

A buyer’s debit note is matched to the line rejection, the lot and the inspection record. Deductions without evidence are challenged with the lot history attached, which makes the buyer’s quality desk check its own count. Disputes close faster.

Rejections counted by part, stage and reason

Operators log scrap and rework at each stage, with the shift and the reason. The plant head sees which part number is bleeding at the press and which one at final inspection. Corrective action starts with the real cause. Quality fixes the right part first. Scrap becomes a number with a cause.

Bins labelled correctly the first time

Each bin label prints from the part and lot record in the buyer’s format. Dispatch scans it with the advance shipping notice. A wrong label is stopped at the dock and not found by the buyer. The buyer receives the right parts. Receiving staff stop sorting mixed bins.

Outside process vendors followed to return

Plating, heat treatment and painting vendors receive lots on a challan and return them with a result. Stores see which lots are outside. A vendor’s delay appears before the buyer’s deadline does. Plating delays are chased before the schedule slips. Lots are not lost outside.

What the software does

What we would build for automotive component manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Buyer schedules and work orders

Enter each buyer’s schedule by part number, keep every revision, and release work orders against it. Planners see the load queued on each press and machine before agreeing to a pull-in. Promises are kept.

Stage job cards with shift and operator

Record quantity passed, rejected and sent for rework at blanking, pressing, machining, welding or moulding. Each card carries the operator, machine, die set and shift, so a complaint finds its source in minutes.

Rejection by part, stage and reason

Count rejection, rework and scrap per part number, by stage and by a reason list your quality team agrees, such as burr, porosity, flash or oversize. A doubtful lot is held. Nothing ships until it is cleared.

Coils, sheets, bars and granules

Count raw material by grade and size and issue every coil, bar or bag of granules against a work order number, so shortages against open schedules go to purchase as a requirement. Stores stay honest.

Plating, heat treatment and painting vendors

Track parts sent for zinc-nickel plating, induction hardening or powder coating on a dispatch note, and see which vendor still holds how many pieces of which part number. Nothing floats.

Bin labels, dispatch notes and invoices

Pack accepted parts, print bin labels on a barcode or label printer, and raise the delivery note and tax invoice with the fields your country’s e-invoice or transport filing asks for. No relabelling.

Debit note and complaint register

Built on top of the production record during implementation, each debit note or complaint is logged against its invoice and lot. The corrective action report and PPAP papers sit beside it.

Gauge calibration register

Calipers, bore gauges and go or no-go gauges are listed with calibration dates. Inspectors see which are due. Out-of-date gauges are tagged and kept off the line until recalibrated.

Operator skill matrix

Each operator’s approval for a machine, process or inspection step is recorded. The supervisor checks it before assigning a job to the shift. Training and refresher dates are kept.

Scrap and turnings sales

Scrap, offcuts and turnings are weighed out and sold by lot, sorted by metal and grade. The record holds buyer, weight and rate. Sales feed back into the cost sheet.

Before you talk to a supplier

A requirements checklist for automotive component manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules automotive component manufacturers use most.

Each one is also available on its own, or inside a system built for you.

Bill of Materials

A part’s bill lists the bar, the cut sheet and the bought-out insert it needs. Weights are recorded so yield can be checked. Cost is read from the bill.

Learn more

Work Order Management

A work order for a pressed bracket lists blanking, forming and trimming. Every stage names its machine.

Learn more

Production Planning

The buyer’s monthly schedule is spread across machines and shifts, with firm and forecast quantities kept in separate columns. Shortfalls show by part number. Planners see which press falls behind first.

Learn more

Quality Control

Inspection of a machined housing records bore diameter, flatness and surface finish against the drawing. Sampling follows the control plan. Rejects are counted by reason and by machine.

Learn more

Job Work Management

Parts leave for plating or heat treatment on a delivery challan with the quantity sent. The balance still lying at the vendor is listed. Returns are matched to the original count.

Learn more

Purchase Order Management

Bars, coils and bought-out items are ordered against the buyer’s monthly schedule and the stock on hand. Late deliveries are flagged. Buyers see which supplier order puts a press at risk.

Learn more

Order Management

Buyer purchase orders and schedule revisions are entered by part number, delivery date and ship-to plant. Revision history is kept. A changed quantity updates the plan for the next month.

Learn more

Stock Tracking and Alerts

Raw material, work in progress and finished parts are counted by location in the plant. Bins show the part number. Low coil or bar stock raises a reorder alert for purchasing.

Learn more
AI by department

Where AI can help automotive component manufacturers.

Each one reads records you already keep, and a person approves every decision.

Worldwide

Where we work with automotive component manufacturers.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Bin labels, dispatch notes and invoices

Can you explain the balance from its original documents?

Select a partly settled example in “Bin labels, dispatch notes and invoices”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Buyer schedules and work orders

Is the plan based on demand that is still open?

Review “Buyer schedules and work orders” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

Common questions

Questions automotive component manufacturers ask before they call.

Can it read schedules straight from a vehicle maker’s supplier portal?

Not on its own. In the standard set-up, schedules are typed in or loaded from the export file the portal gives you, and a direct link depends on what each portal allows. Scoping is done buyer by buyer.

Does it hold our PPAP files and control plans?

Not in the ready production product. A register for each part’s quality documents, complaints and corrective actions is added during implementation. The software keeps your records but does not certify any process or audit.

Can a complaint be traced to the shift and machine?

Yes, through the work order. Job cards hold operator, machine and shift for every stage, and each lot traces to its work order and the material issued against it. The chain is complete.

Will it show defects per million for each buyer?

Internal rejection by part and stage is counted as standard. A buyer-wise view built from supplied and returned quantities, shown as defects per million, is a report set up during implementation.

How is a plant system for a component supplier quoted?

Plant and line count, the buyers whose schedules and labels it must follow, and how many people will use it matter first. Gauge or CMM links and plating or heat treatment vendor tracking add scope. So do records moved from Excel or Tally. The quotation then shows a figure per part.

What should a parts supplier collect before the build begins?

Collect a recent buyer schedule, a job card, a bin label, a debit note and a rejection sheet. Add the current vendor and coil stock registers. Name one person each in planning, quality, dispatch and accounts who can clarify the process and approve the screens.

What happens to our job and rejection data if we end the arrangement?

Nothing is locked in. The code and the job and rejection data are yours, and all of it can be exported in plain files. Those who wrote the modules keep supporting them. GullySystem hosts unless you choose otherwise.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Across India

Cities where automotive component manufacturers are common.

Related

Related industries.

Category

Part of these wider groups.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements