Manufacturing · Software for electrical equipment manufacturersFollow every panel and transformer order from drawing approval through testing, dispatch and final payment.

Electrical equipment manufacturers build low-voltage and high-voltage panels, switchgear, distribution transformers and busducts to order for utilities, engineering contractors and factories. Each order carries a drawing approval, bought-out components, stage and final testing, an inspection call and a long payment tail. The software follows one order through its bill of materials, production, test readings and dispatch, and keeps the records a buyer’s inspector asks to see.

At a glance

You make low-voltage panels, motor control centres, power factor correction panels, high-voltage switchgear, distribution transformers or busducts, mostly against a purchase order carrying its own specification. Very little is built for stock.

Each order passes through drawing approval, purchase of breakers, relays, copper and steel, fabrication, wiring or winding, testing and an inspection call. Payment arrives in stages. The last instalment waits on commissioning and the defect liability period, a stretch that can outlast the rest of the order.

How the work runs today

An enquiry or tender arrives with a single line diagram, a technical specification and a list of approved makes. Estimation prices the enclosure, busbar copper, bought-out switchgear and labour, and the quote goes back with deviations noted.

Once the order is placed, the general arrangement drawing and wiring diagram go to the customer for approval, sometimes over several rounds. Purchase books breakers and relays with long lead times, sheet metal is cut and powder coated, and the panel is assembled, wired and tested.

The buyer’s inspector or a third party witnesses routine tests before dispatch is cleared. Test reports and serial numbers travel with the invoice.

Where it breaks

What goes wrong for electrical equipment manufacturers without a proper system.

Drawing approval stalls unnoticed

A GA drawing sits with the consultant for comments, and purchase cannot book breakers until it returns. No one owns the follow-up.

Bought-out items arrive after the enclosure

Breakers, relays and meters are booked late against a bill of materials kept in Excel. The finished enclosure waits empty.

The wiring bay builds from an old print

Comments on the approved drawing reach the office, but the bay works from the earlier revision. Rework follows at inspection.

Test reports are typed again for each dispatch

Routine test results, serial numbers and component makes are copied into every report from scattered sheets. Mistakes reach the inspector.

The last instalment drifts out of sight

Money held until commissioning and the end of the defect liability period sits in an accountant’s sheet, order by order. Old balances get forgotten.

What changes

What electrical equipment manufacturers gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Drawing approval chased by name and date

Each GA drawing and wiring diagram shows who holds it, since when and on which round. Purchase sees the same status before booking breakers. The consultant’s comments attach to the revision they refer to. Follow-up has an owner. Reminders go out on the date a reply was due. The consultant is chased with the revision in hand.

Bought-out items booked against the build

Breakers, relays and meters are booked from the bill of materials for each panel, with lead times beside them. The planner sees when the enclosure will be ready and which component arrives after. An empty enclosure no longer waits in the bay. Delays in one item are visible well before dispatch. Purchase then expedites the right one.

Wiring bay builds from the approved revision

The wiring team opens the current approved diagram on the order, not a print from last month. A change after approval is marked on the order and the older print is retired. Buyers’ inspectors see the revision that was built. The wiring team signs the build against that revision. A later query finds who built what.

Test sheets ready for the inspector

Routine and type test readings are entered against the panel serial at the bench. When a buyer’s inspector or third party arrives to witness, the sheets are open and the dispatch clearance follows the record. Serial numbers print on the certificate. Dispatch then needs no second search through folders for the witness copy.

What the software does

What we would build for electrical equipment manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Order-wise bill of materials with revisions

Keep the material list for each panel or transformer against the drawing revision, with sub-assemblies such as busbar sets, cores or windings carrying their own lists. A unit built to an older revision stays identifiable.

Shortages turned into purchase orders

Set the bill of materials against stock, raise purchase orders from the shortage list, and receive breakers, relays and copper with an inspection entry.

Job cards through each shop stage

Move every order through sheet metal, busbar, assembly, wiring or winding and testing, with quantity, operator and shift on each card.

Test readings and inspection hold

Record routine test readings against the order and hold it until quality clears it for the buyer’s inspection call.

Powder coating and outside machining

Track enclosures sent for powder coating or parts sent for machining and galvanising, and reconcile what came back against each delivery note.

Dispatch, invoices and order outstanding

Raise the dispatch note and tax invoice from the closed work order, then read what each buyer still owes against that order.

Drawing approval register

General arrangement drawings go to the client or consultant and are logged with comments and the approved revision. Shop floor release waits for approval. Design staff see which orders are still stuck.

Busbar and copper cutting list

Copper bars for each panel are cut to a list of lengths, bends and drilled holes. The shop records offcuts returned to the rack. Costing sees the weight actually used.

Type test certificate file

Switchgear and transformer designs carry type test reports from the test laboratory. Sales staff attach the right report to a tender. The file shows the design revision covered.

Site defects and call-backs

After dispatch, the service engineer logs each fault found at commissioning against the panel serial. The works manager sees repeat defects by design. Fixes are tracked until the client signs off.

Before you talk to a supplier

A requirements checklist for electrical equipment manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules electrical equipment manufacturers use most.

Each one is also available on its own, or inside a system built for you.

Bill of Materials

A panel’s bill lists breakers, busbars, meters, relays, enclosures and terminals for one order. Revisions follow each drawing approval. Purchase and the shop see the same latest list.

Learn more

Work Order Management

Every panel or transformer gets a work order that moves through cutting, assembly and wiring. The foreman marks each bay finished. Delays show against the promised delivery date.

Learn more

Production Planning

Confirmed tenders for utilities and contractors are placed on shop bays by delivery date. Planners see which orders wait for bought-out components. A drawing delay shifts the whole slot.

Learn more

Quality Control

Routine tests on each panel record insulation, interlock and relay trip readings. Transformer winding resistance and ratio results sit on the same job. A failed reading blocks dispatch.

Learn more

Job Work Management

Powder coating, galvanising and heavy machining go to outside shops with the enclosure or busbar. The stores clerk sees what is out and when it is due. Returns are checked on receipt.

Learn more

Purchase Order Management

Circuit breakers, relays and cable lugs are ordered for a named panel order. The buyer sees promised dates from each maker. A late breaker flags the affected job at once.

Learn more

Order Management

A client order carries panel types, quantities, delivery stages and payment terms. Sales staff see what stage each panel has reached. Part shipments are tracked against the contract.

Learn more

Stock Tracking and Alerts

Standard lugs, busbar supports, indicators and copper stock carry reorder levels. The store clerk sees what is reserved for open panel orders. Common items never wait for a tender.

Learn more
AI by department

Where AI can help electrical equipment manufacturers.

Each one reads records you already keep, and a person approves every decision.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Order-wise bill of materials with revisions

Which version applies to work that has already started?

Use a revised example from “Order-wise bill of materials with revisions” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Shortages turned into purchase orders

Does receiving less than ordered leave the correct quantity open?

Bring a short delivery to the “Shortages turned into purchase orders” walkthrough. Separate what arrived, what was accepted and what remains due before checking the supplier’s bill.

Background reading: ERPNext: purchase receipts

Common questions

Questions electrical equipment manufacturers ask before they call.

Can it prepare our tender bids?

No. Estimates and quotations sit in the system with their revisions. Portal uploads, bid documents and eligibility papers stay with your tender team.

Does it track retention money and bank sureties?

Not on its own. Buyer outstanding by order is part of the standard product. Retention due dates and the expiry of each bank surety are added as a register during implementation.

Can it print our routine test certificates?

It stores the test readings for each order. The certificate layout your buyers accept is set up as a print format during implementation, so readings are entered once.

Can drawing approval be followed in the system?

Yes, as revisions. The revision is held on the order and the work order. A status for drawings sent to the customer and returned with comments is added where you need it.

How is a panel maker’s system quoted?

Order types, bill of materials depth, shop stages and test stations decide it. Users in estimation, purchase, stores and testing add more. Old order books to bring across count. A typical order is rebuilt on screen, and the parts get prices one at a time.

What must the factory have ready?

One full order file with its drawings, a bill of materials, a purchase booking sheet, a routine test certificate and a dispatch note. Pick an estimator, a stores head and a test engineer. They should see each screen.

Who owns drawing and test records long term?

The factory does. Bills of materials, test readings and dispatch files, plus the programme, are its property. Plain tables can be requested when needed. Later repairs come from the same hands. A plant server can host it.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements