Reports for Manufacturing Owners and Production Managers
Each report is built from work orders, job cards, store issues and dispatches that the floor and the office already enter. Nothing is keyed in twice.
What the owner reads
Material, vendors and money
How the reports behave
Every report runs on the records as they stand when it is opened. A date range, a part, a machine, a buyer or a vendor can be applied, and the result goes to a spreadsheet when somebody wants to work on it further. Figures are not rounded away. The owner screen keeps a handful of these as counters, so open work orders, items short and this week rejections can be read without opening a report at all.
What the reports will not tell you
- They do not cost a job, since rates and overheads are yours to set
- They do not forecast demand or suggest a batch size
- They do not replace the books your accountant keeps
- Any report built only for your unit is quoted after scoping
Which report answers which question
Reports are tools. Pick the one that fits the doubt in your head.
A short review that fits in an hour
- Open work orders behind their target week, with the cause for each
- Top three rejection reasons and the stage behind them
- Material short for released orders and what is on order
- Job work older than the vendor promise
- Dispatches made against dispatches planned
Why numbers get ignored
Some reports are read for a month and then dropped. The usual cause is that the figures do not match what the owner already knows. If the report says a machine produced nothing on a day it ran, trust is gone. So check the first few weeks of data against the floor. Walk the shed with the report in hand. Fix the stages where cards are not being marked, rather than blaming the report. A small set of reports that everyone believes beats a long list that nobody opens.
Reading reports across a month
Reports are read on a rhythm, and each rhythm has a different reader. This page follows a month at a small plant. It shows which report each person opens and what question is on their mind when they do. The hour spent is short.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
How the reports behave
What does one row mean before totals are combined?
Choose one period in “How the reports behave” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.
Background reading: Microsoft: reporting grain and relationships
Material consumed against the bill of materials
What changes when a component or quantity is substituted?
Take one entry from “Material consumed against the bill of materials” and change an input in a test copy. Review the resulting material requirement and cost with the person who approves production.
Background reading: ERPNext: bills of materials
Frequently asked questions
Can a report be sent out automatically?
It can. A daily or weekly mail or WhatsApp message with chosen figures can be set up for the owner.
Is a report available for one machine only?
It is. Production, rejection and load can be filtered to a single machine or work centre.
Do these reports show profit on a job?
No. Material issued and job work charges are shown, and what you treat as overhead or margin is yours to decide.
Can our accountant read them directly?
Yes, on an account made for them. What they may open is set when the unit is configured.
Will old batches stay in the reports?
They do. Closed work orders remain readable, so this year can be compared with the year before it.
Can the owner see reports on a phone?
The screens work on a phone browser. Layout of each report on a small screen is shown during scoping.
How are dashboard counters chosen?
You pick a handful that matter most to you, such as open work orders and items short. More can be added later.
Do reports include cost of production?
They show material issued and job work charges. Overheads and margin are decisions for you, so they are not worked out.
Can reports be filtered by buyer?
Yes. Narrow orders, dispatches and outstanding to a single buyer, part or period.
How this feature fits the system.
Manufacturing Production Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Multi-level bill of materials and routing
Each part carries a multi-level material list and routing with drawing revisions, scrap allowance and the machine per stage, while sub-assemblies hold their own lists.
Bill of MaterialsWork orders and batch planning
Planners release a work order for a batch with a target date and see the load already queued on each lathe, press and stage.
Work Order ManagementWork orders and batch planning
Batch work orders are scheduled against machine and stage loads, so the planner sees where capacity is already taken before setting the next date.
Production PlanningTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements