Skip to main content
GullySystem

Manufacturing · Software for steel millsTrace every heat, coil and bundle from scrap yard to the customer’s gate.

Steel mills melt, cast and roll material that ends up in buildings, vehicles and machines, so a buyer eventually asks which heat a bar came from. The steel mill software links each heat and lot to its ladle chemistry, bend and tensile results, yard bay and dispatch. Certificates, orders and balances follow.

At a glance

A mill is a chain of departments. Every one keeps its own sheet. Purchase buys scrap, pelletised ore or billets. The melt shop taps a ladle. A caster or the rolling mill turns that steel into bars, coils or sections, while quality tests samples, dispatch loads trucks and accounts bill.

Steel mill management software puts one heat or lot number through all of them, from tap to truck, so nobody renames steel on the way. When a customer queries a certificate or a failed rebend test, the answer is already on the record, not rebuilt from six registers by three tired people.

How the work runs today

Sales staff take enquiries for grades, sizes and quantities, quote from the price list and confirm an order against a delivery window. Purchase teams buy scrap, ferro alloys such as silicomanganese and ferrochrome, graphite electrodes, coke and ladle refractories from suppliers, and each order names the grade expected at the weighbridge. Trucks are weighed in. Samples go to the lab. The lot is accepted or rejected on the lab result before it reaches the scrap bay or the furnace charge, and rejected steel waits in a marked bay.

The melt shop plans furnace heats against the charge mix and records the tap weight, the ladle treatment with argon stirring and the sequence cast through the tundish. Billets or blooms move on. In the rolling mill, each run is planned by size and grade, from the pusher furnace through the looper to the cooling bed. Quality staff cut samples at every stage to record chemistry, tensile strength, rebend results and ovality for the heat, and a failing bundle is held back. Finished goods are tagged and stacked. Dispatch matches trucks to orders. Accounts raise invoices with test certificates attached, and credit teams chase balances from distributors, fabricators and contractors who buy on terms.

Where it breaks

What goes wrong for steel mills without a proper system.

Heat numbers are lost between stages

The melt shop writes a heat number, the rolling mill adds a strand or stand reference, and the yard tags a bundle by its own count. Matching a bundle to its heat takes three registers.

Mill certificates are typed by hand

A mill test certificate takes carbon, manganese, sulphur and phosphorus from the spectrometer sheet and sizes from the mill log. Copying figures across invites mistakes. Customers reject mismatched paperwork at their gate.

Yield and scrap loss stay hidden

Charge weight goes in, saleable weight comes out, and the gap is explained at month end as slag, scale and cropped ends. Without per-heat figures, nobody sees which grade, furnace or shift loses most, and the same scrap mix is charged again on Monday.

Yard stock is a rough estimate

Rebar bundles, angles and flats are stacked by grade and size, but the count sits on a whiteboard that nobody updates after the second shift loads out. Stock is promised twice. Nobody finds out until the truck arrives at the gate and the second buyer asks where the notch-tested bars went.

Dispatch and billing run separately

A truck leaves on a gate release weighed at one scale while the invoice is raised later from the order weight, and disputes about tonnage follow. Nobody can say which figure was right.

What changes

What steel mills gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Heat, coil and lot traceable end to end

A bar or coil shows the heat it came from, its ladle chemistry and its test results. When a buyer asks which heat a bar belongs to, the answer is a lookup. Certificates carry the same figures. Buyer questions are quick. A bar is traced to its heat in one search.

Weighbridge ticket matched to purchase order

Scrap, ferro alloys and electrodes arriving at the weighbridge are checked against the purchase order. The grade and weight expected are known at the gate. Short or wrong loads are raised with the supplier the same day. Disputes at the gate drop. The expected grade is known before the truck reaches the scale.

Production plan built around heats

Heat and production planning shows grades, sizes and delivery windows together. Sales confirms an order against a real slot. The planner sees where the rolling mill would sit idle and where it is overbooked. Rolling time is used well. Gaps in the schedule show up days earlier.

Yard stock by bay and by grade

The yard view lists bundles and coils by bay, grade and size. Dispatch finds a lot without walking the yard. Trucks are loaded against the order, and the loaded weight is recorded. Dispatch is faster. Trucks are loaded from a list and not by memory.

Invoice and receivable from the dispatch

The invoice is drawn from the weighed dispatch, and receivables follow each buyer’s terms. Accounts sees which large invoices are due. Disputes about weight or grade are settled from the gate record. Collections improve. The finance head knows which buyers are slipping against agreed terms this month.

What the software does

What we would build for steel mills.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Enquiries, quotations and orders

Log each enquiry by grade, section and tonnage, quote from your own price list, and commit orders only to rolling slots and dispatch dates the mill can meet.

Raw material purchase and weighbridge

Order scrap, ferro alloys, electrodes and refractories from approved suppliers, weigh each truck in and out, and accept or reject material after the lab result.

Heat and production planning

Plan furnace heats, desulphurisation, ladle treatment and rolling runs against open orders, and record the charge mix, tap weight and output for each heat.

Heat, coil and lot traceability

Give every heat, bloom, billet, coil and bundle a number that follows it through the reheating furnace, the stands, the yard and the invoice.

Quality tests and certificates

Record chemistry with vanadium, niobium and boron additions, tensile, Charpy and rebend tests, and ovality checks against each heat, then print certificates in your customers’ formats.

Yard stock and dispatch

Hold finished goods by bay, grade and size, reserve stock for orders, and match each truck to its order, weight and gate release.

Invoicing and receivables

Invoice on the weight that left the gate, hold each buyer to a credit limit and terms, and read balances by customer starting with the oldest bill.

Furnace and refractory consumption

Record power, electrode and refractory use against each heat, and show consumption per tonne tapped. Lining heat counts show when relining is due.

Roll and stand records

Log each mill roll by stand, tonnage rolled and regrind, and show which pass is due a change. Roll changes are timed against the rolling plan.

Customer claims and rejections

Log each customer rejection against its heat, size and certificate. The test sample is retraced and the cause recorded. A repeat on one heat shows.

Before you talk to a supplier

A requirements checklist for steel mills.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules steel mills use most.

Each one is also available on its own, or inside a system built for you.

Estimate/Quotation Management

Quotes price a grade, section and quantity from the current price list, with extras for length cuts or testing. Validity dates are shown. Sales staff confirm a delivery window the mill can keep.

Learn more

Order Management

Orders name grade, size, quantity and delivery window, then link to the heat and lot that fills them. Part dispatches are tracked. Customers know whether a rebar order waits for rolling.

Learn more

Goods Receipt (GRN)

Trucks of scrap, ferro-alloys, electrodes and coke are weighed in, sampled and held until accepted. Weighbridge slips tie to the supplier’s order. Rejected loads never reach the furnace charge.

Learn more

Production Planning

Melting, casting and rolling are planned against orders, billet stock and mill maintenance. A furnace outage changes the sequence. Planners see which grade’s order is first to slip.

Learn more

Batch and Serial Tracking

Each heat, billet, coil and bundle carries a traceable number from the furnace to the yard bay. A buyer’s question about one bar returns its ladle analysis. Affected bundles are listed.

Learn more

Quality Control

Ladle chemistry, bend, tensile and rebend results are recorded against each heat and lot, with limits shown. Failing lots are held for re-test. The lab releases material for dispatch.

Learn more

Stock Tracking and Alerts

Yard bays, billet stock and finished bundles are counted against orders. Alerts flag low alloy stock and slow-moving sections. The yard supervisor knows where each grade sits at any time.

Learn more

Credit Limits and Control

Dealer accounts carry credit limits, open invoices and ageing. Orders from overdue accounts are held for approval. Sales staff see which customer owes money before accepting a new order.

Learn more
AI by department

Where AI can help steel mills.

Each one reads records you already keep, and a person approves every decision.

Worldwide

Where we work with steel mills.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Invoicing and receivables

Can you explain the balance from its original documents?

Select a partly settled example in “Invoicing and receivables”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Yard stock and dispatch

What happens to movements entered while a count is being checked?

For “Yard stock and dispatch”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.

Background reading: ERPNext: stock reconciliation

Common questions

Questions steel mills ask before they call.

Does it connect to furnace or rolling mill controls?

Not as standard. Operators enter heat data or load a spectrometer file. A link to plant systems or weighbridge indicators is scoped separately, and what is possible depends entirely on your equipment and its data formats.

Can it print mill test certificates in a customer’s format?

Yes. Each certificate layout is drawn from the fields your lab already reports, such as carbon, manganese, yield, elongation and Izod impact, and built with your quality staff. Which standards or customer formats apply is for your quality team to confirm.

Is it meant for integrated mills or small re-rollers?

Both can use it, though the set-up differs. A re-roller may skip the melt shop modules and start from billet receipt at the reheating furnace, while an integrated mill starts at the scrap bay. The first workshop decides the scope, after your plant layout and the departments that will use the system have been mapped out.

Can several plants or yards use one system?

Yes. Each plant or yard keeps its own stock and heats, and head office reads all of them together without merging any bay or heat number. Local currency and tax rules apply per plant.

What sets the price of a steel plant system?

Furnaces, rolling lines, yards, weighbridges and user groups set the base. Orders, purchasing, heat planning, traceability, quality certificates, yard dispatch and receivables are modules priced apart. Furnace or mill controls to connect add considerable scope. Old order lists count too.

What should a mill have prepared before the start?

Prepare an order sheet, a weighbridge slip, a heat card, a lab report, a mill test certificate and a dispatch invoice. A melt shop lead, a quality head and a yard supervisor should review screens.

Who holds heat and certificate records if we change tools?

The mill. Code and records both belong to you. Heats, lots, tests, dispatches and invoices leave in plain files. Those who built it stay on as support, and GullySystem hosts unless the mill wants to host.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Across India

Cities where steel mills are common.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements