Skip to main content
GullySystem

Heat, Coil and Bundle Traceability for Steel

Every heat, billet, coil and bundle gets its own number. A delivered bundle can be followed back to the melt and the scrap lots behind it, and forward to the invoice. Tracing a customer complaint becomes a search on one record, not an afternoon in three registers.

Whose job is it to trace a bundle?

A complaint about a bar reaches the sales desk, and the answer has to come from the laboratory, the melt shop and the yard. Traceability puts all three on one chain.

For the laboratory tracing a claim

The chemist starts at the bundle number and walks back to the heat, its chemistry and its test results. The certificate sits in the same chain. Checking it takes one search.

For the sales desk answering a buyer

A buyer rings about a bundle. The desk finds it by number, sees the heat and the invoice, and replies with facts. The call does not wait for someone to open three registers.

For owners and mill heads judging a supplier

If a heat fails, the chain leads to the scrap or alloy lots behind it. The head sees which supplier’s lots went in. A decision about that supplier rests on a record.

For stores and dispatch teams finding a bundle

The yard reads where a numbered bundle lies. The gate sees which trailer took it. A bundle sent in error can be followed to the buyer and called back.

Numbers that link melt, mill, yard and invoice

Traceability is a set of numbers that point at each other. A heat points to its raw material lots, a billet to its heat, a bundle to its billets, and an invoice to its bundles. Break one link and the chain fails.

Heat number and its charge lots

Each heat’s number is tied to the scrap, sponge iron and alloy lots charged into it. That trail starts at the weighbridge receipt. A doubtful lot can then be found by its number, and its supplier named.

Billet and coil numbers

Every billet cast from a heat takes its own number. So does every coil. Each number links to its heat and, later, to the rolling run that used it and the bars rolled from it.

Bundle numbers and tags

Every bundle is tagged at the cooling bed. The tag number is what the yard, the crane driver and the gate all read. The invoice cites it too, for each delivered bundle on the load.

The forward link to the invoice

The bundle number leads to the dispatch and the tax invoice that closed the sale. A buyer’s query about a delivered bundle is answered along that line, from the heat to the invoice. It is a single path.

Tracing one rebar bundle back to the melt

A claim lands on the sales desk about a bundle of rebar that a fabricator rejected. The answer once meant opening the melt shop, rolling and yard registers one after another, each in its own format. Here it follows one chain.

The fabricator quotes a tag number

The buyer reads the tag number off the bundle. The sales desk enters it and finds the order, the dispatch, the invoice and the heat. Nobody leaves the desk.

The laboratory pulls the heat

From the bundle the chemist reaches the heat and reads chemistry and test results beside it. If the heat passed its tests, the record says so. If not, the lot is flagged.

The melt shop finds the scrap lots

The supervisor follows the heat to the charge and the raw material lots, and from them to the supplier and the purchase order. A suspect lot is isolated by its number.

Other bundles from the same heat are found

Searching the heat number lists every bundle cut from it, in the bay or already delivered. The owner learns the scale of the problem. The gate shows which trailers carried them.

Numbering decisions that cannot be undone later

Numbers stamped on steel stay there for years. Choose the scheme with care. Agree it with the melt shop, the mill and the yard before the first heat is entered.

How heat, billet and bundle numbers are formed

Decide the format of each number, and whether it reads at a glance, for example by including a section code. Do not change the scheme after steel has been tagged. Fix it before the first tag.

What is stamped, tagged or painted

Decide how a number physically reaches the steel, and who attaches it. Tag and entry must match. The record is only as good as the match between the tag in the yard and the entry in the system.

How earlier heat numbers join the chain

A mill already holds old heat numbers on certificates and in registers. Decide which of them are brought in as references. Your quality head confirms the cut-off. Our staff load them.

How long a delivery must stay traceable

Customers and inspectors set their own rules on how long a mill must be able to trace a delivery. Your quality head states the period. The records are kept so they can be read.

What a trace can and cannot prove

The trace shows which numbers connect to which. It proves nothing about the steel itself. Whether a heat met a standard is for the laboratory and the customer’s inspector. If a tag is lost or a number mistyped at the yard, the chain has a gap that the software cannot fill. A small plant selling a few lots of one grade may keep a heat register by hand.

Where the trace picks up and hands over

Traceability is not a separate ledger. It is built from the other features. It takes numbers from receipt, heat and rolling, and it hands them to yard, dispatch and invoice. Whatever those features record is what a trace reads, so a gap in one shows as a gap in the chain.

  • Weighbridge receipts supply the raw material lot numbers
  • Heat records link charges to cast billets
  • Rolling runs tie billets to bars and bundles
  • Test results and certificates attach to the heat
  • Dispatch and invoice close the chain at the buyer
FAQ

Frequently asked questions

How far back can a bundle be followed?

To the heat, and from the heat to the raw material lots charged into it, lot by lot. Each lot connects to the supplier and the purchase order it came in on. The trail ends at the weighbridge.

Can every bundle from one heat be listed?

Yes. Search the heat number. It lists the billets cut from it and the bundles rolled from those billets, in the yard or already delivered, with the invoice for each. The list shows where each bundle lies today.

Do coils get their own numbers too?

Yes. Coils carry numbers like billets and bundles, and each links to its heat. Your plant may make coils, bars or both. The numbering is set up to match your own product range at implementation.

What if a tag is damaged in the yard?

The yard supervisor can look up the bay, grade and size to narrow the candidates, and the quality head decides how to re-tag. The software holds the record and not the steel. A physical check stays necessary.

Can a buyer’s inspector see the trace?

The mill test certificate carries the heat number. Your staff read the chain for any bundle the inspector names, and answer each question from the record on file. External access for inspectors is not part of this feature.

Where it fits

How this feature fits the system.

Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.

Estimate/Quotation Management

Sales orders and delivery schedule

A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.

Order Management

Weighbridge and material receipt

Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements