Steel Order Book and Delivery Schedule

Once a buyer accepts a quotation, the order is confirmed against a delivery window and split across the trailers that will carry it. Late and part supplied orders stand out on the schedule, so the sales desk calls the buyer before the buyer calls the mill.

Who works the delivery schedule each morning

Rebar ordered by one buyer may leave the yard on several trailers, and each person watching it asks a different question. The schedule answers the sales desk first. The yard and the plant head follow with questions of their own.

For the sales desk calling buyers

Late orders stand out on the schedule. The desk starts with those calls and does not wait for a buyer to complain. The balance still owed is shown on each part supplied order.

For owners and mill heads reading lateness

The plant head scans orders open, late and part supplied before the morning meeting. A cluster of late orders in one section points at the rolling mill. The head then asks the right supervisor.

For rolling mill supervisors planning runs

Supervisors see the sections and grades due soonest, with their delivery windows. A run can be sequenced to serve the earliest window first. They read it and edit nothing.

For dispatch teams lining up trailers

The dispatch team reads which orders are due out and how much of each remains to move. A split across dispatches shows the tonnage planned for each trailer. The gate desk matches trailers to orders.

A confirmed steel order, line by line

A confirmed order is a promise with a date on it. The record keeps that promise in parts: what was agreed, when it falls due, how it is divided and how much has moved. The split is written down, not remembered.

Order lines by grade and size

Each line holds the grade, the section or size and the tonnage ordered, with the rate carried over from the accepted quotation and the buyer’s name. Two sections mean two lines. Each is followed on its own.

Delivery window for each line

Every line carries the dates between which the buyer expects the steel. The window is set at confirmation. Lateness is measured against it, not against an impression left by a phone call or a remembered promise.

Dispatch splits and balances

An order can be split across several dispatches, each with its own tonnage and trailer registration. As trailers leave, the balance falls. A part supplied order always shows what is still owed to the buyer.

Buyer’s purchase order reference

The buyer’s own order number is kept on the sales order. Disputes start from that reference. It travels with the order through dispatch, so the buyer’s store recognises each delivery that arrives at its gate.

A delivery week at a rolling mill

Fabricators ring on Monday for steel they wanted last Friday, and dealers shift their windows without warning. It has to absorb both. One list serves the whole week, with windows and splits adjusted by the desk as the mill’s output changes.

Monday’s calls on late orders

The desk opens the schedule and finds the late orders marked. Each call starts with the order number, the original window and the balance. The buyer hears a date. Nobody offers to check and call back.

A buyer moves a window forward

A contractor asks for an order to come earlier. The window is changed, and the open rolling runs are checked to see whether they allow it. If not, the split is rearranged. A first trailer can go sooner.

Midweek, a rolling run falls short

A run produces fewer bundles than planned. Its order becomes part supplied, and the balance shows at once. A call to the buyer gives the exact tonnage still to come.

Friday’s count of what is owed

At the end of the week the plant head reads part supplied orders by customer. The balances show which buyers have waited longest. Next week’s runs are sequenced with that list in hand.

Order-splitting rules to agree with sales

Splitting an order across trailers is easy to do and hard to explain afterwards. Agree the rules with the sales head before the first order is confirmed. They fix what counts as late. Every order is then judged by that rule.

How wide a delivery window may be

Choose whether windows are set as single days or as a span of dates, and how far past the window counts as late. Sales and the yard should agree. Lateness is marked by that rule alone.

When a part supplied order is closed

Decide whether an order with a small shortfall is closed or held open for the balance. A closed order stops showing as part supplied. State the allowance in writing so the sales desk applies it evenly.

Who may move a confirmed delivery date

Buyers ask to shift dates. Decide whether the desk clerk can accept it or the sales head must. The decision sets who answers for a changed date when a buyer later disputes it.

Which orders get steel first

When two orders compete for the same grade, someone decides which window is served first. Choose the rule, whether earliest window or key buyer, and record it. Sales then follows it.

Where the order schedule hands over to the yard

The schedule shows what was promised and what has moved. It does not decide what the mill should roll, and it does not hold bundles in the yard, which is the work of yard stock. Prices and contract terms stay with the owner. A trader who confirms a few orders on a whiteboard may not need this much structure.

The order book feeds rolling and the yard

A confirmed order starts nearly everything on the shop floor. It arrives from the accepted quotation, feeds the heat and rolling plans, and later meets the yard list and the gate. Its balance reaches the invoice through dispatch. The sales desk reads one line from promise to payment.

  • Accepted quotation supplies grade, section, tonnage and rate
  • Open orders guide heat planning and rolling runs
  • Reserved bundles in the yard list attach to the order
  • Dispatch splits send tonnage out trailer by trailer
  • Credit limit decides whether the next trailer is held
FAQ

Frequently asked questions

Can one order be delivered on several trailers?

Yes. The order is split across dispatches, each with its own tonnage, and every trailer reduces the balance. Part supplied orders show what is still owed. The gate desk matches each trailer to its share.

How does the desk know an order is late?

Each line carries a delivery window, and the schedule compares it with what has been dispatched. An order past its window or short of its tonnage stands out. The rule for lateness is agreed at set-up.

Can a delivery window be changed after confirmation?

Yes, by whoever your sales head authorises. The new window replaces the old one on the schedule, and lateness is then measured against the new dates. Who may do this, and whether the buyer must agree first, is decided before set-up.

Does the schedule show buyers a status online?

It is meant for your own staff. The sales desk passes the status to the buyer by phone, email or a messaging app where those links are set up. Buyer log-ins are not part of this feature.

What happens when a rolling run falls short?

The order it served becomes part supplied. The balance shows beside it. A call from sales gives the buyer the exact tonnage still to come. Whether to roll again or split the shortfall is a decision for the mill.

Where it fits

How this feature fits the system.

Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.

Estimate/Quotation Management

Sales orders and delivery schedule

A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.

Order Management

Weighbridge and material receipt

Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements