Skip to main content
GullySystem

Steel Yard Stock and Bundle Reservations

Finished goods are held by bay, grade and size, and a bundle can be reserved against an order. A reserved bundle is marked in the yard list. Nobody sells it twice. The crane driver reads the same list as the sales desk, so the right bundle goes onto the right trailer.

Crane cab, sales desk and plant head, one list

The crane cab, the sales desk and the plant head’s office all read the yard list. Counts once chalked on a board now appear on every screen. The board is retired.

For stores and dispatch teams placing bundles

The yard supervisor places each tagged bundle in a bay and records it. The weighbridge clerk and the supervisor read the same bay list. A count is a fact, not a guess.

For crane drivers lifting reserved bundles

The driver sees which bundles are reserved and for which order. Reserved 12 mm rebar no longer looks like any other bundle. The right one goes onto the trailer.

For the sales desk promising stock

Before confirming an order, the desk checks free stock by grade and size. Reserved steel shows as taken in the list. Two buyers are no longer promised the same steel.

For owners and mill heads watching bays

The head sees yard stock by bay, grade and size, and which bays are nearing full. Bay 4 holding rebar bundles is one case. The head can act on it.

Each bundle’s line in the yard list

A yard list is a map of finished steel. Each bundle appears once, with its place and its commitments. The list answers two questions at a glance: what is where, and what is already spoken for.

Bay, grade and size

Every bundle sits in a bay and is described by its grade and size. Search 16 mm rebar and see its bays. The supervisor keeps each entry current as bundles arrive and leave the yard.

Bundle number and weight

The bundle carries its tag number and weight, entered when it is placed in the bay. They are the same number and weight that print at dispatch. A bundle count turns into tonnes. They also print on the invoice.

Reservation against an order

A bundle reserved for an order is marked in the list with that order. Free bundles and reserved bundles are listed apart. The reservation holds until the bundle is dispatched or released by an authorised person.

Heat number behind the bundle

Each bundle keeps the heat it was rolled from, copied from the rolling run that made it. Each bay’s heat can be named. Offering a specific heat to a buyer who asks for it is simple.

A day of bundles moving through the yard

Bundles come in from the mill through the day. Trucks leave for the gate. In between, the yard must know what is free, what is promised and what stands in the wrong bay. Nobody should walk every row at shift end to find out.

Bundles arrive from the cooling bed

New bundles are tagged and weighed at the cooling bed. Each gets a bay from the supervisor. Grade, size and the heat each came from are added, so the bay count is current.

A salesperson reserves bundles for an order

A buyer confirms an order, and the desk reserves matching bundles from free stock. Those bundles turn reserved in the list. The sales desk and the yard see the same status.

The crane driver loads the trailer

At loading the driver reads the list for the reserved bundles and their bays. The bundles lifted are those marked for that order. The gate desk then matches the trailer.

A bay nears capacity

The plant head sees a bay close to full. A section may need to be dispatched sooner or moved to another bay. The stock-by-bay view shows the choices.

Bay and reservation rules to agree first

How a yard is divided shapes what the list is worth. So does the question of who may hold stock for a buyer. Decide both with stores and sales. Do it before bundles are entered.

How bays are named and sized

Decide the bay names, and whether a bay holds one grade or several. A clear scheme keeps the list readable. Supervisor and mill head agree it on site.

Who may reserve and release bundles

A reservation is a promise to a buyer. Decide whether only the sales desk reserves, or the yard supervisor too, and who may release a bundle back to free stock.

What becomes of a stale reservation

A buyer may delay collection. Decide how long a reservation stands before sales reviews it, and who decides to release the bundle. The rule prevents idle stock tied up behind a reservation nobody uses.

How the opening yard count is checked

Bundles lying in the yard today are copied in from your registers. Stores and sales review the count against the physical stock in each bay. Do this before the first reservation.

Limits of the yard stock list

The yard list shows what the mill records. It does not count bundles by itself, scan tags or move steel. A physical check against the list stays necessary. Stock valuation, write-offs and insurance stay with the owner and the accountant. A trader with a handful of bundles in one shed may find a notebook enough.

Bundles in from rolling, out through dispatch

Bundles enter the yard from rolling runs and testing, and they leave through dispatch. Between those two points the yard list is the single answer to what the mill can sell. Orders reserve from it. Invoices close it. A bundle’s whole stay in the yard reads as one line, from tag to trailer.

  • Rolling runs deliver tagged bundles to the bay list
  • Sales orders reserve bundles by grade and size
  • Dispatch removes bundles when the trailer leaves
  • Heat number on each bundle links back to tests
  • Delivery schedule reads reservations against order balances
FAQ

Frequently asked questions

Does a reserved bundle stay visible to the sales desk?

Yes. It shows as reserved against its order. It does not count as free stock. A second salesperson sees it is taken before promising it to another buyer, and the yard sees the same mark.

Can bundles be moved from one bay to another?

Yes. The supervisor records the move. The list shows the new bay. The count by bay then matches what the crane has done, and the heat number stays with the bundle wherever it lies in the yard.

Can a reservation be released?

Yes, by whoever your rules authorise. The bundle returns to free stock and appears as available to the sales desk at once, with its bay and size unchanged. The rule on who may release is set before go-live.

Does the list show which bays are nearly full?

Yes. Yard stock by bay, grade and size makes a crowded bay plain to everyone who reads it. Near full means different things in different bays. Your yard supervisor gives the figure for each bay at set-up.

How does the crane driver see the list?

Your crane driver reads the same yard list as the sales desk, on whatever screen or printout your yard arranges. Both the bay and the reserved order are in view. The cab device is your plant’s choice.

Where it fits

How this feature fits the system.

Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.

Estimate/Quotation Management

Sales orders and delivery schedule

A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.

Order Management

Weighbridge and material receipt

Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements