Quality Tests and Mill Test Certificates
The laboratory records chemistry, yield strength, tensile strength, elongation, rebend and bend tests and weight per metre against each heat. A mill test certificate then prints in the layout each customer or third party inspector expects, and nobody retypes a figure from a lab sheet.
Who tests the steel and who signs for it
The certificate reaches the buyer with the steel. Behind it stand the chemist, the quality head and the sales desk. Each touches different fields of the same test record on the heat.
Test record and certificate, field by field
A test record holds the laboratory’s evidence for one heat. The certificate shows it in the buyer’s format. The same values sit behind both, so the printed page and the lab result cannot disagree, whatever the layout or the customer.
A heat’s test results, bar to certificate
Testing begins at the furnace. A ladle sample is taken there for the spectro reading. It ends at the gate, where a certificate travels with the trailer. Between the two, the laboratory’s figures move through release and print, and nothing is retyped.
Test limits and layouts to confirm with quality
Test fields and layouts are what your customers see. Settle them with the quality head before go-live. The lab sheets in use today are the starting point for every grade.
What the laboratory record cannot decide
The feature stores test results and prints the certificate. It does not set limits, interpret a standard or certify the steel. Those judgements stay with the quality head, the buyer’s inspector and, where needed, an adviser. It reads no machine directly. Every figure is typed or imported. A trader reselling certified steel may only need to file the supplier’s certificates.
Test results travel with the heat number
Test results hang on the heat number. They arrive from the melt shop’s heat record and the rolling run’s samples, and they leave on the certificate that travels with the dispatch. The release decision gates what goes forward, so a held lot never reaches a certificate or an invoice.
- Heat number links results to charge and tap records
- Bar samples come from the rolling run’s output
- Release or hold decides which lots go forward
- Certificate prints at dispatch beside the gate pass
- Invoice carries the certificate for the delivered heat
Frequently asked questions
Can one heat have different certificate layouts?
Yes. The test fields come from the heat. The layout is chosen by the customer. Two buyers of the same heat can each receive their own format, built during implementation from the fields your laboratory records.
Are test fields fixed for every grade?
No. Grades, chemistry limits, bend radii and tensile fields are set up from your lab sheets. Our staff change them on request. That applies when a grade or a standard moves, or when a customer adds a test.
Who confirms the standard a certificate follows?
Your quality team does. We build the layout from the fields your laboratory records. The standard that applies to each grade is confirmed by your people, and by the buyer’s inspector where one is involved. We never decide it.
Can a held lot still have its results viewed?
Yes. The results stay on the heat. A held lot simply goes no further. The quality head can read them, and release or reject the lot after review. Nobody has to hunt for the lab sheet.
Does it print a certificate for every bundle?
Certificates are printed per heat or lot. Each customer decides what it needs. What it lists, from the heat number to each test, is set by the layout. Which bundles it covers is set with your quality and dispatch teams.
How this feature fits the system.
Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and quotations
Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.
Estimate/Quotation ManagementSales orders and delivery schedule
A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.
Order ManagementWeighbridge and material receipt
Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements