Rolling Runs and Work Orders for Steel Mills

A rolling mill turns billets into bars and sections, and every run loses some steel on the way. This feature plans each run by section and grade and records billets in and bars out. It also counts crop ends, cobbles, mill scale and rejected bundles, so loss can be read by shift.

The mill floor writes, the office reads

The mill floor writes the run. The office reads it. A work order for a section reaches the supervisor, the sales desk and the owner, and each looks for a different number.

For rolling mill supervisors running the shift

The supervisor opens the work order for a section and grade, records billets in and bars out, and counts the losses as they occur. The shift diary no longer carries the figures.

For the sales desk chasing a late order

When an order slips, the sales desk reads the run that serves it. A short run explains the shortfall. The buyer is told the real reason and a realistic date instead of a reassurance.

For owners and mill heads reading loss by shift

Loss counted by shift lets the plant head see which crew or section carries the heaviest crop ends or cobbles. The head asks why, with figures in hand.

For stores and dispatch teams awaiting bundles

The yard and the gate read which bundles a run produced and which were rejected. Good bundles move to a yard bay. Rejected ones are counted and set apart.

Billets, bars and losses on a rolling run

Billets go in and bars come out of a rolling run. The difference is its whole story. The record keeps both sides and every named loss between them, so the supervisor can explain a gap to the mill head and to sales.

Section, grade and work order

Each run is planned for a section and grade against a work order. The order shows the intended product, such as 12 mm bars or an angle, and the tonnage wanted. The run records how it was made.

Billets in, bars out

Billets fed to the mill and bars rolled are both recorded by weight. The pair gives the output of the run. The billets carry heat numbers, so the bars can later be traced to the melt.

Crop ends, cobbles and mill scale

The shift crew counts losses separately. Crop ends are cut from the bar. Cobbles are where a bar jams in the mill. Mill scale is shed from the hot surface. Each loss is its own line.

Rejected bundles counted per run

A bundle that fails inspection is counted against the run that made it. Its weight is visible with the run. The rejected tonnage then joins the loss, which can be read by shift, section and grade.

Following a run from billet bay to bundle

A run starts with billets drawn from the billet bay and ends with tied bundles on the cooling bed. Between them sit a shift crew, a rolling schedule and a stream of small losses. They mount up fast. Nobody counts them without a record.

The run is planned for a section

The planner chooses a section and grade from open work orders and sets the run. Billets to be used are named. At the start of the shift, the work order is opened.

Billets go into the mill

As billets are drawn, the supervisor records them against the run. Each billet’s heat number is known. If a billet is later found faulty, its heat is already identified.

A cobble stops the line

A bar jams and the crew clears it. The supervisor counts the cobble against the run with its weight. The loss is now on record by shift and not left to a diary remark.

Bundles are tied and checked

Finished bars are tied into bundles and checked. Good bundles go to the yard. A rejected bundle is counted against the run, and the work order shows what was actually delivered.

Mill-floor choices before the first work order

How a rolling mill counts its losses decides what the run shows. Agree those definitions with the mill head before anything is typed. Every shift must count alike. Otherwise the comparison between shifts means nothing.

How crop ends are weighed or estimated

Crop ends can be weighed in a bin or estimated by the number of cuts. Pick one method for the mill. A figure that mixes both cannot be compared between shifts.

Who closes a work order

Decide whether the supervisor closes a work order when the last bar is tied or a planner does so after checking counts. Until then, losses can still be added to the run. The choice fixes that moment.

How a rejected bundle is re-rolled

A rejected bundle may be scrapped, downgraded or sent back. Decide how each route is recorded, so the loss is not counted twice. Rolling and quality settle it together.

How runs are split across shifts

Any run that spans a shift change needs a rule. Decide whether it is one record or two, and how the loss is divided. Without that, a comparison between shifts misleads.

Where rolling records leave off

The feature plans and records rolling runs. It does not drive the mill, read drive speeds or schedule maintenance. A link to rolling mill automation is extra work once your PLC make and data formats are known. Roll changes, pass design and mill settings stay with the rolling head. A re-roller running a single section on one stand may find a shift diary enough.

Rolling sits between the melt shop and the yard

A rolling run sits mid-chain. It takes billets from a heat and a work order, and it hands bundles to testing and the yard. The numbers it carries are the heat numbers the melt shop recorded, so the trail never breaks from the first billet to the last bundle.

  • Billets arrive from heats with their heat numbers
  • Open sales orders set the sections and grades to roll
  • Test samples are taken from bars of the run
  • Good bundles pass to the yard bay list
  • Loss by shift joins the yield figures for each heat
FAQ

Frequently asked questions

Can losses be read by shift?

Yes. Crop ends, cobbles, mill scale and rejected bundles are counted against the run, and each run belongs to a shift. The owner reads loss shift by shift. Crews can then be compared on the same footing.

Does a run link back to its heat?

Yes. The billets fed to a run carry heat numbers. The bars rolled from them can be followed back to the melt, and from there to the scrap lots. The link is made at billet entry.

How does a re-roller bring in bought billets?

Billets bought from outside are received at the weighbridge and given their own lot numbers. A run then draws on those lots. The supplier’s heat number can be kept with them where the supplier’s certificate gives one.

What happens to a rejected bundle?

It is counted against the run and set apart from good bundles. Your quality team decides its fate. Whether it is scrapped, downgraded or rolled again, the record then shows the outcome of that decision.

Can a work order be changed mid-run?

A planner can amend what is still to be rolled, as your rules allow. Billets already used stay as recorded. Bars already rolled stay too. Who may make the change is set with your rolling head before go-live.

Where it fits

How this feature fits the system.

Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.

Estimate/Quotation Management

Sales orders and delivery schedule

A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.

Order Management

Weighbridge and material receipt

Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements