Rolling Runs and Work Orders for Steel Mills
A rolling mill turns billets into bars and sections, and every run loses some steel on the way. This feature plans each run by section and grade and records billets in and bars out. It also counts crop ends, cobbles, mill scale and rejected bundles, so loss can be read by shift.
The mill floor writes, the office reads
The mill floor writes the run. The office reads it. A work order for a section reaches the supervisor, the sales desk and the owner, and each looks for a different number.
Billets, bars and losses on a rolling run
Billets go in and bars come out of a rolling run. The difference is its whole story. The record keeps both sides and every named loss between them, so the supervisor can explain a gap to the mill head and to sales.
Following a run from billet bay to bundle
A run starts with billets drawn from the billet bay and ends with tied bundles on the cooling bed. Between them sit a shift crew, a rolling schedule and a stream of small losses. They mount up fast. Nobody counts them without a record.
Mill-floor choices before the first work order
How a rolling mill counts its losses decides what the run shows. Agree those definitions with the mill head before anything is typed. Every shift must count alike. Otherwise the comparison between shifts means nothing.
Where rolling records leave off
The feature plans and records rolling runs. It does not drive the mill, read drive speeds or schedule maintenance. A link to rolling mill automation is extra work once your PLC make and data formats are known. Roll changes, pass design and mill settings stay with the rolling head. A re-roller running a single section on one stand may find a shift diary enough.
Rolling sits between the melt shop and the yard
A rolling run sits mid-chain. It takes billets from a heat and a work order, and it hands bundles to testing and the yard. The numbers it carries are the heat numbers the melt shop recorded, so the trail never breaks from the first billet to the last bundle.
- Billets arrive from heats with their heat numbers
- Open sales orders set the sections and grades to roll
- Test samples are taken from bars of the run
- Good bundles pass to the yard bay list
- Loss by shift joins the yield figures for each heat
Frequently asked questions
Can losses be read by shift?
Yes. Crop ends, cobbles, mill scale and rejected bundles are counted against the run, and each run belongs to a shift. The owner reads loss shift by shift. Crews can then be compared on the same footing.
Does a run link back to its heat?
Yes. The billets fed to a run carry heat numbers. The bars rolled from them can be followed back to the melt, and from there to the scrap lots. The link is made at billet entry.
How does a re-roller bring in bought billets?
Billets bought from outside are received at the weighbridge and given their own lot numbers. A run then draws on those lots. The supplier’s heat number can be kept with them where the supplier’s certificate gives one.
What happens to a rejected bundle?
It is counted against the run and set apart from good bundles. Your quality team decides its fate. Whether it is scrapped, downgraded or rolled again, the record then shows the outcome of that decision.
Can a work order be changed mid-run?
A planner can amend what is still to be rolled, as your rules allow. Billets already used stay as recorded. Bars already rolled stay too. Who may make the change is set with your rolling head before go-live.
How this feature fits the system.
Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and quotations
Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.
Estimate/Quotation ManagementSales orders and delivery schedule
A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.
Order ManagementWeighbridge and material receipt
Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements