Skip to main content
GullySystem

Weighbridge and Quarantine Receipt for Mills

Every scrap, sponge iron and alloy truck is weighed in at the weighbridge, and its gross and tare weights are recorded. The lot then waits in quarantine until the spectro reading arrives. Only an accepted lot is released to stock, and a rejected lot never reaches the furnace.

Who stands at the weighbridge and who decides

A truck at the scale is seen by the clerk first, the laboratory next and the melt shop last. All three need the lot’s status. Is it on hold, accepted or rejected?

For stores and dispatch teams weighing in

The weighbridge clerk records gross weight on arrival and tare weight after unloading. The net weight follows. Weights are typed in or loaded from the weighbridge file, as the plant arranges.

For the laboratory entering spectro readings

The chemist enters the spectro reading against the lot. From quarantine it then moves to accepted or rejected, and the choice is made on the same screen as the reading. Nothing waits on a paper sheet.

For melt shop supervisors charging the furnace

A supervisor sees which lots are accepted and so fit to charge. A rejected lot does not appear among the material the furnace may take.

For owners and mill heads reading rejections

The owner reads raw material received, accepted and rejected by supplier. A supplier with repeated rejects stands out. Whether to keep buying from that supplier is a business call.

One truck, one receipt: what stays on file

A truck leaves a short trail. Weights, the supplier, the material and the lot decision are all attached to one receipt. A later question about a load starts from that single entry and not from a hunt through gate diaries.

Gross, tare and net weight for weighbridge and material receipt

The weighbridge clerk records the gross weight on arrival and the tare after unloading. Net weight is the difference. The figures stay with the receipt for every lot, and rejected loads are weighed the same way.

Supplier, material and order link

Each receipt names the supplier and the material and points to the approved purchase order. Sponge iron arriving by truck is matched to that order, and any shortfall against the ordered quantity shows.

Spectro reading against the lot

The chemistry reading arrives after the weighing and is entered against the lot. For ferro silicon or sponge iron, the figure decides the outcome. The reading stays on file with the receipt. The supplier report reads it from there.

Quarantine, accepted or rejected status

Every lot carries a status. It starts in quarantine and moves to accepted or rejected once the reading is in. The status list is what the melt shop reads before charging, so quarantined material is not mistaken for stock.

A scrap truck from gate to furnace yard

One truck rolls in loaded with shredded scrap or sponge iron. The scale and the spectrometer decide what follows. Each person along the route needs the same lot number and the same weight, from the gate to the furnace bay.

The truck is weighed in

The driver stops on the weighbridge. The clerk records the gross weight against the supplier and the purchase order. Here a lot is created in quarantine, and the truck moves to the unloading bay.

The sample goes to the laboratory

A sample from the lot goes to the spectrometer. Meanwhile the lot sits in quarantine, and the chemist waits for the reading. Nothing is charged from it in the meantime.

Tare weight after unloading

The empty truck returns to the scale and the tare is recorded. The net weight is now settled. That is the figure the buyer checks against the supplier’s bill.

A ferro lot comes back rejected

The reading for an alloy lot falls outside the limits. The chemist marks the lot rejected. It is not offered to the melt shop, and it counts against that supplier in the receipt report.

Receipt rules to fix before the first truck

The scale and the quarantine rule shape the day for the yard, so settle them first, before the gate opens to the new system. They decide what a receipt means in practice.

How weights reach the receipt

Weights are typed in or loaded from the weighbridge file. Decide which method the clerk uses at each scale, and who checks a typed figure. A live link is scoped separately.

Who may accept a quarantined lot

Decide whether only the chemist can move a lot out of quarantine, or whether a laboratory head must confirm borderline readings. The system records who acted. The person with authority is named in advance.

What a rejected lot does next

Rejected material has to go somewhere: back to the supplier, to a separate yard or to another use. Decide the route and the document that goes with it. The system shows the status and the weight.

Which spectro fields must be present

Choose which elements must be entered before a lot is accepted, for each material. Sponge iron and ferro alloys need different fields. The laboratory agrees the list with the plant head.

Weighbridge matters left to people

The feature records weights and lot status. It does not read the scale by itself unless a file import is set up, and a live link to the indicator is extra work. It does not judge chemistry limits, which belong to the laboratory head. Claims against a supplier, freight charges and customs papers stay with the owner and an adviser. A small yard with very few trucks needs only a slip book.

From the scale to the furnace charge

The receipt takes the approved purchase order in. It hands accepted material to the melt shop. Quantities received close the purchase line, and quality results join the supplier’s history for the buyer’s next decision on which supplier to use. Heat planning reads only stock accepted at the gate.

  • Approved purchase order supplies expected material and quantity
  • Accepted lots become available for the charge mix
  • Rejected lots feed the supplier receipt report
  • Lot numbers start the trail used for heat tracing
  • Weighbridge file import loads weights without retyping
FAQ

Frequently asked questions

Can a truck be weighed twice for one lot?

Yes. Gross is taken on arrival and tare after unloading, both against the same lot. Both weights are kept with the receipt. Rejected loads are weighed in the same way.

What stops rejected scrap reaching the furnace?

A lot stays in quarantine until the spectro reading is entered, and a rejected lot is marked as such. Heat planning offers accepted material only. Physical discipline at the yard still matters. The status is visible to the melt shop and to stores.

Does it handle sponge iron and ferro alloys?

Yes. Shredded scrap, sponge iron and ferro alloys each get a receipt, a quarantine status and a spectro reading at the weighbridge. Required fields differ by material. They are set with your laboratory during implementation.

What if the spectro reading is delayed?

The lot simply remains in quarantine. To the melt shop it shows as unavailable, and its weight is already on record against the purchase line. When the reading arrives, the chemist enters it and the status changes.

Can the receipt be matched to the supplier’s bill?

The receipt shows net weight against the purchase order, which gives the buyer a figure to check a bill against. Accounting software export can carry the details onward. The bill itself is handled in your accounts.

Where it fits

How this feature fits the system.

Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.

Estimate/Quotation Management

Sales orders and delivery schedule

A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.

Order Management

Weighbridge and material receipt

Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements