Skip to main content
GullySystem

Steel Mill Enquiries and Quotations

A buyer rings for 12 mm rebar or a run of angles, and the sales desk logs the grade, section and tonnage as an enquiry. The quotation is priced from the mill’s own rate list, with extras for length cutting and bundle tying. Revisions sit beside the original.

Three desks that touch every quotation

Three desks touch a quotation before the buyer hears back. The sales desk builds it, the credit team checks the account behind it, and the plant head watches the rates going out. The melt shop looks on from a distance.

For the sales desk logging enquiries

The desk opens an enquiry the moment the buyer calls and enters grade, section and tonnage. The rate list fills the price. A revised offer is added as a new line beside the first, never typed over it.

For credit teams reading the account

Before a quotation leaves, the credit team sees the buyer’s limit and payment terms beside the enquiry. A buyer at the ceiling is spotted early. A quoted tonnage then does not turn into a held dispatch later.

For owners and mill heads watching rates

The plant head reads open quotations by grade and section, with the rate on each. A low counter from a dealer sits next to the rate list figure.

For melt shop supervisors looking ahead

A supervisor can read the grade and tonnage asked for in open enquiries before a heat is planned. Supervisors do not edit a rate. They read what the sales desk has logged and plan with that in mind.

Fields on every steel enquiry and quotation

An enquiry begins as a few lines of buyer demand and ends as a priced offer. The record keeps both halves together, from the first call to the last agreed rate. Nothing is quoted from memory. History is read instead.

Grade, section and tonnage asked

Each enquiry carries the grade, the section such as angle, channel or round, and the tonnage wanted. The buyer’s name sits with it. A second line is added when the same buyer wants another section.

Rate list price and extras

The base rate comes from the mill’s own rate list. Extras for length cutting and bundle tying are added as separate lines. The total reads plainly. Each extra can be questioned alone by the buyer.

Revisions beside the original

Every revised offer is kept in one list next to the first. A lower counter leaves a trail. Anyone can read what was offered, on which date and at which rate, and which revision the buyer finally accepted.

The buyer’s reply and outcome

The reply, whether accepted, countered or declined, is logged on the enquiry. The accepted quotation is the one that becomes a sales order. Declined offers stay readable. The next time that buyer asks, the desk sees what was offered before.

A quotation day on the sales desk

A mill’s sales desk fields calls from fabricators, dealers and contractors all day, and each call asks for something slightly different. A rebar buyer wants bundles. A structural buyer wants cut lengths. The enquiry list holds both without a notebook beside the phone.

A fabricator asks for cut lengths

A fabricator wants angles cut to length and tied in small bundles. The clerk adds the cutting and tying extras to the base rate. The buyer hears one total. The breakdown stays on the quotation.

A dealer counters with a lower rate

A dealer wants 12 mm rebar at less than the quoted rate. A revision is added beside the original. Both figures are read by the plant head before agreeing to the counter.

The plant head checks rates before lunch

The plant head opens the list of quotations still open and reads the rate on each by grade and section. A glance compares a rate with the list. A drifting rate leads to a call to the desk, not to the buyer.

A returning buyer repeats an enquiry

A contractor who bought channels earlier rings again. The desk finds the old enquiry and its quotation, then prices the new tonnage from the current rate list. The old figure is a reference and not a price.

Settle these before quoting from the list

Quoting forces choices on how a mill prices and who may change a price. Settle them with the sales head and the plant head before the first enquiry is logged. These choices shape every offer that follows.

Who may revise a sent quotation

Decide whether the desk clerk or only the sales head can change a quotation once the buyer has seen it. Revisions are kept in the list in either case. The choice names who answers for a rate.

How cutting and tying extras are priced

Length cutting and bundle tying can be a flat line or a rate per tonne. Pick one for each extra and enter it in the rate list. Every buyer is then treated alike.

Which rate list a quotation follows

Rates move when the mill reprices, so agree when a new rate list takes over. A quotation keeps the list it was priced from, so an earlier figure can still be explained. Old offers stay put.

What an enquiry is logged against

Choose whether an enquiry is logged against a company, a site or a named buyer. A dealer with several yards needs the choice made. Limits and terms sit with the customer.

Where quotations end and orders begin

This feature prices and records offers. It does not confirm an order, set a delivery window or hold stock for the buyer. Those steps start once the buyer accepts, in the sales order. Contract wording, the tax treatment of an offer and any legal terms stay with the owner and an adviser. A trader who quotes a handful of lots a year may find a spreadsheet enough.

Enquiries hand over to orders, stock and invoices

An accepted quotation is where this feature hands over. The grade, section, tonnage and agreed rate pass to the sales order, and the buyer’s account details come from the credit record. Heat planning later reads those orders. The quoting desk and the melt shop therefore work from one chain.

  • Accepted quotation becomes a sales order with its rate
  • Credit limit and payment terms come from receivables
  • Grades and sections match those used by the laboratory
  • Open enquiries inform heat planning by grade and tonnage
  • Tax invoice later repeats the agreed rate and extras
FAQ

Frequently asked questions

Can one enquiry carry several grades and sections?

Yes. Each line holds its own grade, section and tonnage, so a buyer asking for rebar and channels gets one quotation with two priced lines. Each line is priced on its own. Extras for cutting or tying attach to the line they belong to.

What happens to the old quotation after a revision?

It stays on file. The revised offer is added to the same list, so the desk reads both and the buyer’s counter is on record. Nothing is overwritten. The two figures can be compared at any time.

Do rates change when the rate list is updated?

A quotation keeps its rate. The new list applies only to quotations raised after the update, so earlier offers are untouched. Your sales head decides when the change takes effect, and our staff load the new list on request.

Can a quotation be priced for a buyer over limit?

Yes, it can. The credit position shows beside the buyer, so the desk knows before promising delivery. Holding a trailer is a separate step, handled by credit limits and receivables, and the owner decides how firm to be.

How is a quotation shared with a buyer?

It prints in the layout your mill uses. Email or a messaging app can carry it to the buyer where those links are set up. The wording and terms that appear on it are your call, not ours.

Where it fits

How this feature fits the system.

Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.

Estimate/Quotation Management

Sales orders and delivery schedule

A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.

Order Management

Weighbridge and material receipt

Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements