A melt shop plans each furnace heat against open orders. It then records what went in and what came out: the charge mix, tap temperature, tap weight and ladle additions. The yield of every heat is read straight from those figures, with burning loss shown apart.

Melt shop, sales and lab around one heat record

From the plant head to the shift crew, everyone reads the same heat record. They want different things. One wants a plan, another a yield figure, a third a reason for a shortfall.

For melt shop supervisors recording the charge

The supervisor records what went into the furnace, the tap temperature and the tap weight. The entry is made at the furnace. The shift diary stops being the only trace of what happened.

For the sales desk watching heat plans

The sales desk sees which heat serves which open order. A buyer asks when steel will be ready. The heat plan answers, and no guess is needed at the desk.

For owners and mill heads reading yield

The plant head reads yield by grade and heat. With burning loss kept separate, a drop in yield is traced to the right cause. The morning meeting starts from figures.

For the laboratory matching results to heats

The chemist enters the spectro result against the heat number. The ladle additions recorded by the melt shop sit on the same heat. Both read from one record.

Figures a furnace heat leaves on record

A heat is short and costly. Its figures decide the margin. The record keeps what was planned, what was charged and what was tapped, in the order they happened. All of it sits under one heat number, so a poor result has a visible cause.

Charge mix by material

Each heat lists the shredded scrap, sponge iron and alloys charged, with the weight of each and the lot it came from. The mix is what the melt shop loaded. It sits beside the plan.

Tap temperature and tap weight

The furnace crew records the temperature at tap and the weight of steel tapped into the ladle. Yield is read from these two. They are entered once, at the furnace, by the crew that tapped the heat.

Ladle additions after tapping

Alloys added in the ladle, such as ferro manganese, are recorded against the heat with their weights. Additions are listed apart. The chemistry that follows can then be read against what was added, and a surprising result has a visible explanation.

Yield and burning loss apart

Charge weight and tap weight give the yield. Burning loss is shown separately. A poor heat is then not blamed on the wrong cause. The figures belong to the heat, the grade and the shift.

One shift at the induction furnace

An induction furnace shift runs heat after heat. Each begins with a plan and ends with a tap. The record is written at the furnace as the shift moves, so the next crew inherits facts and not a handover note.

The plan is set against open orders

Open orders are picked by grade, and a heat is planned to serve them. The planned heat shows which orders it covers. The sales desk and the rolling mill read the same plan.

The charge goes in

Scrap, sponge iron and alloys are loaded and weighed. The supervisor records each against the heat. Only accepted lots are offered, and lots still in quarantine are left out.

The heat is tapped

At tap, the crew records temperature and weight. Ladle additions follow. Now the heat has a number that will follow the billets cast from it, all the way to the invoice.

The shift’s yield is read

At the end of the shift the supervisor reads yield by heat. A weak heat is explained by a figure, such as burning loss or a light tap. The next shift plans with that in mind.

Charge decisions the melt shop settles first

Planning against orders sounds simple until two orders want the same grade. Settle how the melt shop plans and what counts as a heat before the first tap is entered. These choices shape every yield figure.

How heats are matched to orders

A heat may serve one order or several of the same grade. Decide whether the plan names the orders in advance or assigns them after the tap. Sales and the melt shop agree the method.

What burning loss includes

Burning loss needs one meaning on every heat. Decide which losses count under it and which are shown elsewhere. Otherwise yield cannot be compared between furnaces or shifts.

Who may amend a tapped heat

Mistakes surface after tapping, such as a mistyped weight. Decide who may correct a tapped heat and how the correction is shown. Every yield figure rests on that choice.

Which heats count towards yield figures

Test heats and trial charges should not distort yield by grade. Decide how they are marked so reports can set them apart. The melt shop head owns that decision.

Limits of the heat record

The feature records heats and works out yield from the figures typed or imported. It does not control the furnace, read the power supply or set the tap temperature. A link to furnace automation is extra work once the PLC make is known. Charge recipes stay with the melt shop head. A foundry pouring a few castings may find a log sheet enough.

How a heat feeds billets, tests and orders

The heat number is the thread. Accepted lots from receipt supply its charge, the laboratory adds its chemistry, and the rolling mill takes the billets cast from it. Open orders guide the plan. The invoice closes the line, and a test failure found later can be traced back through the same number.

  • Accepted raw material lots supply the charge mix
  • Open sales orders by grade guide each planned heat
  • Spectro results attach to the same heat number
  • Billets cast from the heat go to rolling runs
  • Heat number carries forward through traceability to the invoice
FAQ

Frequently asked questions

Does it calculate yield for each heat?

Yes. Yield is read from the charge weight and the tap weight, with burning loss shown apart. The figures come from the melt shop. A mistyped weight therefore shows in the yield of that heat.

Can one heat be linked to several orders?

Yes. One heat can serve several open orders of the same grade. The plan shows which. Whether orders are assigned in advance or after tapping is for sales and the melt shop to decide together.

Are ladle additions recorded separately from the charge?

Yes. Alloys added in the ladle are listed against the heat with their weights. They sit apart from the charge. The chemistry can then be read against what was added, heat by heat and shift by shift.

What if the tap weight is entered wrongly?

An authorised person corrects it, and the yield of that heat is read again from the new figure. Who may correct a tapped heat is set during implementation. The correction is visible on the heat.

How far ahead can heats be planned?

Heats are planned against open orders, so the plan can look as far ahead as the orders go. How far your melt shop plans is its own practice. The plan changes as orders and stock change.

Where it fits

How this feature fits the system.

Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and quotations

Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.

Estimate/Quotation Management

Sales orders and delivery schedule

A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.

Order Management

Weighbridge and material receipt

Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements