Furnace Heat Planning and Charge Mix
A melt shop plans each furnace heat against open orders. It then records what went in and what came out: the charge mix, tap temperature, tap weight and ladle additions. The yield of every heat is read straight from those figures, with burning loss shown apart.
Melt shop, sales and lab around one heat record
From the plant head to the shift crew, everyone reads the same heat record. They want different things. One wants a plan, another a yield figure, a third a reason for a shortfall.
Figures a furnace heat leaves on record
A heat is short and costly. Its figures decide the margin. The record keeps what was planned, what was charged and what was tapped, in the order they happened. All of it sits under one heat number, so a poor result has a visible cause.
One shift at the induction furnace
An induction furnace shift runs heat after heat. Each begins with a plan and ends with a tap. The record is written at the furnace as the shift moves, so the next crew inherits facts and not a handover note.
Charge decisions the melt shop settles first
Planning against orders sounds simple until two orders want the same grade. Settle how the melt shop plans and what counts as a heat before the first tap is entered. These choices shape every yield figure.
Limits of the heat record
The feature records heats and works out yield from the figures typed or imported. It does not control the furnace, read the power supply or set the tap temperature. A link to furnace automation is extra work once the PLC make is known. Charge recipes stay with the melt shop head. A foundry pouring a few castings may find a log sheet enough.
How a heat feeds billets, tests and orders
The heat number is the thread. Accepted lots from receipt supply its charge, the laboratory adds its chemistry, and the rolling mill takes the billets cast from it. Open orders guide the plan. The invoice closes the line, and a test failure found later can be traced back through the same number.
- Accepted raw material lots supply the charge mix
- Open sales orders by grade guide each planned heat
- Spectro results attach to the same heat number
- Billets cast from the heat go to rolling runs
- Heat number carries forward through traceability to the invoice
Frequently asked questions
Does it calculate yield for each heat?
Yes. Yield is read from the charge weight and the tap weight, with burning loss shown apart. The figures come from the melt shop. A mistyped weight therefore shows in the yield of that heat.
Can one heat be linked to several orders?
Yes. One heat can serve several open orders of the same grade. The plan shows which. Whether orders are assigned in advance or after tapping is for sales and the melt shop to decide together.
Are ladle additions recorded separately from the charge?
Yes. Alloys added in the ladle are listed against the heat with their weights. They sit apart from the charge. The chemistry can then be read against what was added, heat by heat and shift by shift.
What if the tap weight is entered wrongly?
An authorised person corrects it, and the yield of that heat is read again from the new figure. Who may correct a tapped heat is set during implementation. The correction is visible on the heat.
How far ahead can heats be planned?
Heats are planned against open orders, so the plan can look as far ahead as the orders go. How far your melt shop plans is its own practice. The plan changes as orders and stock change.
How this feature fits the system.
Steel Mill Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and quotations
Each enquiry becomes a quotation priced from the mill’s rate list by grade and section, with every revision kept beside the original for later comparison.
Estimate/Quotation ManagementSales orders and delivery schedule
A confirmed order carries its delivery window and is split across dispatches, so planners see which orders are late or only part supplied at a glance.
Order ManagementWeighbridge and material receipt
Scrap and alloy trucks are weighed in, held in quarantine until the spectro reading arrives, and only then accepted into stock or sent back as rejected.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements