Skip to main content
GullySystem
Manufacturing · Solutions

Record the checks your people already do, with a reading, a reason and a photograph.

Quality control records the checks your people already do: material at the gate, one in-process check at the stage that matters, and a final look before despatch. Each is a parameter with a reading, a pass or a fail, a reason and a photograph. Rejections then count against the job, the operator and the supplier who sent the material.

What it is

Checking happens. Writing it down is what does not, and the notebook that does hold it sits under the weighing scale. When a consignment is returned, the argument is about memory: the fitter says he checked, the supervisor says he saw him, and neither has a paper with a reading on it.

A check becomes a short screen at the station, on the tablet that lives there. It takes a pass or fail, the measurement and a photograph if it helps. Failures ask for a reason from your own list, so after a month of failures the same three reasons are impossible to miss.

What it replaces

What your team uses today.

The module takes over these, one at a time, so nothing has to stop while it is set up.

  • A paper check sheet filed at the station
  • Photos kept on personal phones
  • A verbal word from the checker to purchase
Where it goes wrong today

The problems this is meant to ease.

Checks on memory

A checker looks at material and says it is fine. Nothing is written. A complaint cannot be traced.

Rejections without reasons

A batch is rejected and the reason is given by word of mouth. Trends stay invisible.

Supplier blamed by feel

Purchase suspects a supplier but holds no record. The argument is opinion against opinion.

Rework and scrap mixed

Rejected pieces are reworked, scrapped or sent back. Nobody noted which.

Photos in phones

Pictures of faults sit in personal phones. They are lost when the checker leaves.

Inside the module

What quality control does.

Incoming material check

The gate check on a supplier’s lot, with what was accepted, what was returned, and the weight or reading taken. Nothing is assumed.

In-process check where it matters

One or two stages carry a check and not every stage. The job cannot be marked done until the check is recorded.

Final check before despatch

A short list against the order: finish, size, count and packing. Signed by whoever looked. It takes a minute.

Reasons from your own list

Porosity, shade variation, under-size, loose stitching. Your words, chosen once and used by everyone after that.

Rework, scrap or return

A failed piece is sent back to the floor, scrapped or returned to the supplier, and stock moves with that decision.

Photographs on the record

A picture of the weld or the print defect, taken at the station and kept against the job. It settles the call with the customer.

Where it gets used

What this looks like in a working week.

Illustrative scenarios, written to show the shape of the work. They are not accounts of client systems.

Material arrives

The checker records readings for a received lot. A failed reading holds the lot and tells purchase.

In-process check

At the stage that matters, the work is checked. Fail results count against the job. They count against the operator too.

Final check

Before despatch the checker passes the lot or notes a deviation. A photograph is attached.

Supplier review

Purchase opens rejections by supplier. The record goes with them to the supplier’s next meeting.

Who touches it

The people who open this every day.

Quality checker

Fills the check at the station and holds what fails. Simple.

Production in-charge

Sees rejection by stage and by operator, and knows which machine is drifting before the customer says so.

Purchase

Takes the gate rejections to the supplier with dates and readings attached.

How it is set up

From first conversation to daily use.

  1. Walk the shop floor

    Show us where checks happen now. A note names the checkpoints and the parameters to record.

  2. Set parameters and limits

    Provide limits and your list of rejection reasons. A test lot can then be checked on the trial screen.

  3. Trial at a chosen station

    Checkers use it at a station for a trial run. Their remarks return as changes.

  4. Train checkers and supervisors

    Checkers, production and purchase each practise their part. Each group gets a printed card.

  5. Extend to every station

    Other stations join as the trial station settles. The team reviews rejection reasons together.

Measuring it

How you would know it is working.

Record where you stand before it goes live, so the change is measured against your own figures.

  • Lots rejected, by supplier
  • Rejections by reason, by stage
  • Rework, scrap and return, by job
  • Deviations accepted, with the person who accepted
  • Checks completed against checks due
How it fits

It is one part of a system, not an island.

A module earns its place by what it passes to the next one. These are the connections we set up most often.

  • Work orders
  • Goods receipt
  • Purchase returns
  • Batch and serial tracking
  • Sales returns
Common questions

Questions owners ask about quality control.

Will this make us ISO or food-safety compliant?

No. The software keeps the record and produces it on demand. Whether your process meets a standard is for your auditor and your consultant to decide, and nobody here certifies anything.

Is it a problem that our checker writes in a notebook?

Not while he is there. It becomes one when he is on leave, when a customer wants last April’s reading, or when the same defect returns and nothing counts how often. Send us even a notebook page of last year’s rejections and the first job is to count it; that tally makes the case on its own.

Will it run on a tablet at the station?

Yes. The check screen is built short enough to fill with oily hands, usually four or five fields. A tablet fixed at the station works better than a phone in a pocket. Short is the rule.

Does it connect to what we already run?

It hangs off the work order or the goods receipt, whichever you keep. Where stock sits in your accounting software, the scrap and return entries go across so the two agree at month end.

Which choices raise the cost of quality control?

Checkpoints, parameters per item and links to goods receipt and work orders. More parameters mean more screens. Each link is priced alone, and you can start without goods receipt or work orders.

What decides how long quality checks take to start?

How clearly your limits and parameters are stated. Incoming, in-process and final checks, with reasons and photographs, come first. Batch links follow. A date goes against each stage in the proposal.

Talk to us

Tell us how you handle quality control today.

A spreadsheet, a register or another system: say which, and we will tell you plainly what is worth changing.

What happens after you share your requirements

  1. A senior engineer reads your answers. Nobody phones first.
  2. Within one business day you get a written note: what we understood, what we would start with, and the questions we still have.
  3. If it fits, a proposal follows with the order of work, what we need from you and what you receive at each step.
  4. No call is booked and nothing is paid until you have read the note. Your details stay with us.

Start with your requirements

Seven short steps that tell us what you need. A senior engineer reads them before anyone gets in touch.

Share your requirements