Skip to main content
GullySystem

Manufacturing · Software for plating companiesTrack customer lots, bath chemistry, thickness checks and billing through every plating job.

Plating company software follows each customer lot from goods receipt through the process route to dispatch. Racks, barrels, bath analysis, chemical additions and thickness readings are logged against the lot. Rejects and rework are recorded with their cause. From that one job come the certificate, the packing list and an invoice priced by area, weight or piece, as you quote.

At a glance

A plating shop works on parts that belong to someone else. Customers send fasteners, brackets, housings and fittings. The shop cleans, plates, bakes and returns them, with the thickness and the finish that the drawing asks for, and the count and weight must match what arrived. Nothing may be swapped.

The risks sit in the details. A lot loses its identity between receiving and the line. A bath drifts without a record. A certificate is typed from memory. The software holds each lot and each bath together.

How the work runs today

A customer delivers parts with a delivery note and a drawing or specification. Stores check the count, tag the lot and book it in. The planner decides the process route, such as degreasing, pickling, nickel or zinc plating, passivation and baking, and groups lots onto racks or into barrels according to size and finish. The line supervisor loads the tanks and the operators follow the route.

The chemist or lab technician tests each bath on a schedule, adds chemicals when readings drift, and measures coating thickness on samples from the finished lot. Rejects are stripped and replated. Effluent and sludge are logged for disposal. Packing, labelling and a certificate of conformance go out with the lot. Billing follows the price list agreed with each customer.

Where it breaks

What goes wrong for plating companies without a proper system.

Lots lose their identity

Parts from three customers can look alike on a rack. A lot tag lost at the unloading bench leads to a mix-up. Nobody notices until the parts reach the customer’s goods-in bay.

Bath records sit on a clipboard

Analysis results, chemical additions and bath life are written beside the tank. Looking back to explain a patchy finish means reading old sheets.

Thickness results are not tied to the lot

Readings from a hand-held gauge are noted in a book. A customer asks for evidence. Matching each reading to its lot, its drawing and its operator then takes an afternoon of patient searching.

Pricing changes by customer and part

Some customers pay by area, some by weight and some by piece, each with a minimum charge per lot. Every price list differs in small ways that the invoice clerk must remember. Mistakes are easy.

Rework and rejects are not costed

Stripping and replating consumes chemicals, labour and bath time, and the cost is absorbed into the shop’s overhead because nobody records it by lot, by cause or by customer. Which jobs lose money stays unknown.

What changes

What plating companies gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

Lots keep their identity on the rack

Each customer lot is tagged at goods receipt and followed to rack or barrel loading. Parts from three customers can sit on one rack without being confused. A lost tag at the unloading bench is recovered from the record, before the parts reach the customer. Mix-ups stop at the bench.

Bath records that explain a patchy finish

Analysis results, chemical additions and bath life are logged against each tank. When a finish looks patchy, the chemist reads back through the readings and additions that preceded the run. Old clipboard sheets are not needed. Bath maintenance dates are visible to the line supervisor.

Thickness evidence tied to the lot

Readings from the hand-held gauge are entered against the lot, the rack and the part. A customer who asks for evidence receives the readings for their own parts. The certificate is built from the same entries, so it matches what was measured. The certificate matches the gauge.

Invoices priced by area, weight or piece

The quote states area, weight or piece as the basis, and the invoice follows it from the receiving note. Rack surface area and loaded quantity are on record. Nobody reworks the price at month end. The packing list and invoice match the lot that went out.

Rejects and rework recorded with their cause

A reject records the stage, the cause and whether the lot goes for stripping and replating. The owner sees which lines and tanks create rework. Rework is billed or absorbed on purpose, not by accident, and the customer’s complaint is answered with the lot’s own history. Repeat causes get noticed.

What the software does

What we would build for plating companies.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Customer lots and receiving

Book in each delivery with customer, part, quantity, weight and condition, and tag every lot so it can be found at any stage.

Process routes and work orders

Define the sequence of steps for each part and finish. Planners issue a work order, and the line sees what is due at each tank.

Racks, barrels and loading

Record which lots went on which rack or barrel, with quantity, surface area and the bath they entered.

Bath analysis and chemical additions

Key in each tank’s analysis and chemical additions against its testing schedule, stamped with date and operator, so a bath’s history can be read back.

Thickness, adhesion and inspection results

Record sample readings and checks against the lot, with the drawing requirement and a pass or fail result.

Rejects, rework and stripping

Log rejected pieces with the cause, route them to strip and replate, and see what rework costs by customer and part.

Certificates, packing and dispatch

Raise a certificate of conformance and a packing list from the lot’s results, then record the delivery.

Rack and barrel maintenance

Racks, barrels and contact tips are tracked by count, repair date and coating wear. The shop supervisor sees which rack needs stripping. Worn contacts that cause burnt parts are caught early.

Effluent and waste treatment log

Rinse water readings, sludge removed and treatment chemicals used are recorded each shift. The compliance officer prepares the figures for the pollution board. Tank discharges are logged with the signatory.

Customer specification and plating standard

Each customer’s thickness, finish, salt spray hours and passivation requirement is saved against its part. Planners route the lot from it. The inspection sheet draws its limits from the same record.

Before you talk to a supplier

A requirements checklist for plating companies.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules plating companies use most.

Each one is also available on its own, or inside a system built for you.

Batch and Serial Tracking

Every customer lot gets a tag at goods receipt and keeps it through degreasing, plating and baking. A returned bracket is traced to its rack and bath. Split lots stay linked to the parent.

Learn more

Work Order Management

A work order names the route, such as degreasing, pickling, zinc plating and passivation, with the rack or barrel to use. Supervisors see which lot waits at the nickel line. Hold points are signed off.

Learn more

Production Planning

The planner groups lots by plating type and thickness onto racks and barrels so tanks run full. Bath loading is visible for the shift. Urgent lots show what they push back.

Learn more

Quality Control

Thickness readings, adhesion tests and visual checks are logged for each lot against the customer’s specification. Failed parts are held for stripping and replating. The certificate pulls only passed lots.

Learn more

Stock Tracking and Alerts

Nickel salts, zinc anodes, brighteners and passivation chemicals have reorder levels. The stores keeper sees a shortage before the bath is topped up. Chemicals near expiry are flagged.

Learn more

Job Work Management

Parts received for plating are booked in on the customer’s delivery note and booked out with the returned count. Differences in quantity are visible before billing. Rework and rejects are shown separately.

Learn more

Price Lists and Schemes

Rates per piece, per kilogram or per square decimetre are kept for each customer and plating type. Volume discounts apply automatically. Dated changes leave earlier invoices as they were.

Learn more

Invoice Management

A tax invoice is raised from the returned lot, using the agreed rate and the counted quantity. Rejected pieces are excluded. Accounts staff see which customer’s lots are ready to bill.

Learn more
AI by department

Where AI can help plating companies.

Each one reads records you already keep, and a person approves every decision.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Process routes and work orders

Is the plan based on demand that is still open?

Review “Process routes and work orders” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

Thickness, adhesion and inspection results

Who decides whether a failed result blocks the next step?

For “Thickness, adhesion and inspection results”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Common questions

Questions plating companies ask before they call.

Does it cover anodising, galvanising or powder coating?

Yes. Process routes, lots and inspections are set up for your own finishes. Anodising or galvanising simply uses different steps, tanks and checks.

Can it print certificates for customers?

Yes. A certificate is built from the lot’s own results. Its wording and layout follow each customer’s requirement and are agreed during implementation.

Can it price by area, weight or piece?

Yes. A price list carries the basis for each customer and part, along with minimum charges, so the invoice is calculated from what was plated.

Does it manage environmental records?

Yes, as logs of effluent, sludge and waste movements, with dates and quantities. What your regulator requires is reviewed during implementation. The software does not make compliance claims.

What makes a plating shop’s quotation vary?

The number of lines, tanks and barrels, the process routes in use, and how many people work in stores, lab and dispatch. Bath analysis, certificates and rework costing are separate parts. Customer price lists are loaded. The quotation puts a price on each part.

What does a plating company need to bring?

A work order, the process route sheets, a bath analysis log, a thickness result slip and a dispatch certificate. Name the line supervisor, the chemist and the stores person. Screens are then checked against the shop floor.

Who owns bath and lot history once the shop leaves?

Lots, routes, bath logs and certificates belong to the shop, as does the code. All can be downloaded as readable files. Builders keep supporting it. GullySystem hosts the system, or another host if you decide so.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Related

Related industries.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements