One system for customer releases, part revisions, lot traceability and dispatch labels.
Hold each customer part number with its drawing revision, release schedule, PPAP file and label format, and let every lot carry the press, die and coil heat behind it. Planners, the quality lab, press operators, stores and the dock all read one trace, so nobody argues over which revision ran on which shift. A complaint opens on the lot.
- Part numbers, revisions and customer label formats entered the way each plant receives your boxes, pallets and crates
- Open releases, stock and lot history imported
- Inspection plans, gauge lists and approval rules agreed with your own quality engineers before the first live release
GullySystem fits this to the way a component supplier ships to vehicle plants. It holds part numbers and drawing revisions, plans production against changing releases, traces each lot to press, die and coil heat, and prints labels and advance shipping notices. Complaints start from the same lot.
What goes wrong before the software.
How the work flows through it, step by step.
- 1
Part set-up
A customer part number is entered with drawing revision, material grade, die list, control plan and label format, and the PPAP documents attach to that same revision.
- 2
Release received
Load the schedule from the plant and the system compares it with the previous release, highlighting each part whose quantity or ship date moved. The planner then re-sequences the press line.
- 3
Plan and material
Machines, dies and material are planned against the release, so a shortfall in coil, bar stock, resin pellet or threaded inserts shows before the run is booked. No press starts short.
- 4
Production lots
Operators scan the press number, die or mould, shift and heat or resin lot at start-up, and first-off and patrol checks are logged against the lot as it runs.
- 5
Final check and dispatch
Final inspection against the control plan puts a failed lot on hold, then labels print in the VDA or AIAG layout the customer asks for and ship notice leaves. A held lot cannot ship.
- 6
Complaints and returns
A complaint opens against the lot. Containment, root cause and corrective action are written into an 8D reply, and returnable boxes are reconciled with the customer plant afterwards.
What is inside.
Every module can be switched on, left out or changed to match how your team already works.
The business modules it is built from.
Each one is also available on its own, or inside a system built for you.
- Product Management
Each customer part number is held with revision, material grade and label format, so planners and press operators read one specification.
- Workflow and Approvals
A new drawing revision is approved and released to operators and gauges together, and the earlier revision is blocked at the machine.
- Document Management
Ballooned drawings, dimensional reports and Cpk studies attach to the part and revision, so they are found again when a customer asks.
- Production Planning
Call-off quantities from each customer plant are compared with the last schedule, and press and die loads are re-planned against the change.
- Batch and Serial Tracking
Each lot stores press, die, shift and coil heat, so a box label leads back to the exact run behind it.
- Quality Control
Readings are logged by lot at the control plan’s intervals, and a failed lot stays on hold until the lab releases it.
- Job Work Management
Parts sent for zinc plating, carburising or powder coating are counted out and back, with short returns and rejects shown against the order.
- Barcodes and Labels
Labels print in each customer’s layout carrying lot, quantity and part revision, and the shipping notice is built from the same record.
How we would put it in.
Setup, data migration, integrations and anything built on top.
One system, each person sees their part.
For production planners
Compare each new release with the last, then plan presses, dies and coil for only the lines that changed, so Monday starts with a real sequence.
For press and machine operators
See the current revision beside the press, and enter heat, shift and first-off details at the machine without walking back to the quality office. No paper travels.
For the quality lab
Record CMM and gauge results against the control plan, place holds on suspect lots, and prepare the PPAP package for each new part before the customer asks.
For stores and dispatch
Pick lots against a release, print labels and shipping notices, and book crates in and out at the dock.
For account managers
Follow releases, open complaints and deliveries for each customer plant. One screen.
The numbers the owner asks for.
- Release changes by customer plant and part
- Lots by inspection result and die
- Parts shipped against each release
- Plating and heat treatment returns, short and rejected
- Crates and racks held by customer plant
- Complaints by part and root cause
Who this is built for.
- Suppliers of machined parts to vehicle makers
- Makers of stamped and formed brackets and housings
- Plants moulding interior and under-bonnet components
- Tier-two suppliers selling to tier-one assemblers
- Firms that ship on daily or weekly customer releases
When it is not the right choice.
- A small workshop making one-off repairs for local garages, with no scheduled call-offs to plan against, does not need release planning.
- Aftermarket retailers need stock and billing.
Adapted to your business before it goes live.
You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.
Works alongside
- Customer release files
- Label printer
- Barcode scanner
- Accounting export
Questions owners ask before a demo.
How does it stop an old drawing revision being used at the press?
Releasing a new revision locks out the earlier print at the press, so operators see only the current drawing, and the gauge list changes with it.
Can I see what changed in the customer’s latest release before sequencing the week?
Yes. The new schedule is compared line by line with the last, and every part whose quantity or ship date moved is highlighted for the planner, who then re-sequences the press line.
What does lot trace include?
Press, die, shift, operator, and coil heat or resin lot for each production lot, plus its first-off and final inspection results. A box label points back to that lot.
Which label formats can it print?
Layouts are built per account, such as VDA or AIAG formats, and barcode content, field order and lot or revision prefixes follow whatever each customer specifies in its supplier manual.
Can outside process orders be reconciled?
Yes. Parts sent for zinc plating or carburising are counted out and back, and short returns and rejects show against the order before the next assembly step is started.
How are returnable boxes counted?
Issues and returns are booked per customer plant. Each plant’s balance of crates is visible with its age.
How does a complaint get handled?
It is raised against the lot, and the trace appears at once. Containment and corrective action are recorded, and the 8D reply prints in the customer’s own layout.
Does it replace our quality system?
No. It holds the production and inspection records tied to lots, while IATF 16949 certification, your quality manual and customer audits stay with your own quality staff.
Can we load our existing part list?
Yes. Part numbers, revisions and open releases can be imported from spreadsheets, and planners and quality engineers go through the imported rows before the first live release.
What does a first meeting cover?
A short session using two of your parts and a recent release. Once seats and modules are fixed, the offer is sent in writing.
Wondering what it would cost? Share your requirements and an engineer will come back with a scope.
Businesses that use this.
See Auto Parts Manufacturer Management Software with your own data.
Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.
- No obligation
- A reply within one business day
- Your details stay private
Start with your requirements
Seven short steps that tell us what you need. An engineer reads them before getting in touch.
Share your requirements