Skip to main content
GullySystem
Manufacturing · Automotive Fastener Manufacturer Management Software

One system for wire coils, heading, rolling, heat treatment, coating and lot certificates.

Customer releases, wire coil receipt, cold heading, thread rolling, hardening, zinc flake or plating at outside vendors, lot inspection and dispatch for flange bolts, studs, nuts and screws share one record. Each lot carries its coil heat number, furnace load and test results from blank to delivery note. A customer query is answered from the lot.

  • Part numbers, drawing revisions and each customer’s label rules keyed as your plant uses them
  • Open orders, wire stock and coating vendors migrated
  • Lot rules and test plans adjusted by GullySystem staff on request

One GullySystem build holds the orders, wire coils, headers, thread rollers, mesh-belt furnaces and coating vendors of an automotive fastener plant. Each lot keeps its coil heat number, die set, hardening load and coating report. Quality staff hold a failed lot, and a certificate of conformance prints with the delivery note.

Where it breaks today

What goes wrong before the software.

Coil heat numbers stay in stores

The mill certificate is filed at goods receipt while the header runs from a coil tag. Linking a finished pallet of M10 flange bolts to its steel means walking between three desks.

Furnace recipes are written beside the furnace

Furnace recipes live on a clipboard hung beside the furnace. Belt speed, zone temperatures and quench oil settings are noted by hand, and a lot with hardness drift or shallow case depth has no cycle record to explain it.

Coating vendors hold lots without a deadline

Lots leave for zinc flake or electroplating on an undated delivery note, and the salt spray and thickness report trails in later. Short quantities are noticed at the dock, after the coater has moved on.

Drawing revisions reach the line unevenly

A new head height or thread tolerance is agreed by email, yet the header is still set up from the previous drawing. The first-off passes against the wrong print, and a whole run follows.

Die and punch wear is judged by the operator

Nobody counts wear on heading dies, punches and roll dies, so they are changed only when parts look wrong, burrs appear or threads go undersize. Tooling cost per thousand pieces stays unknown.

Complaints take days to answer

A returned bolt is matched to a lot, then a coil, then a furnace load, all by hand across paper files and spreadsheets. The customer’s quality engineer waits for a first reply.

How it runs

How the work flows through it, step by step.

  1. 1

    Order and schedule

    The customer’s order or weekly release is entered against the part and drawing revision. Planning then sets quantities and picks the header, the thread roller and the die set that suit the size and grade.

  2. 2

    Wire issue

    A coil is chosen for steel grade and wire diameter and issued to the header by weight. The heat number follows the lot and stays on it until the last carton ships.

  3. 3

    Heading and rolling

    Operators log pieces, scrap and stoppages by machine, and the first-off check is signed before the run continues. Thread rolling follows on its own work order with the roll die set noted beside it.

  4. 4

    Hardening and tempering

    Furnace load, belt speed, temperature and tempering are written against the lot and hardness samples are entered. A lot outside range stays on hold until quality decides its fate.

  5. 5

    Coating and testing

    Lots go to the coating vendor and return against the same record. Quality enters thickness, torque and tensile results next, and only a passed lot is released to packing.

  6. 6

    Packing and dispatch

    Packing follows the customer’s label and box rules, such as a barcode label per carton. The conformance certificate goes out with the dispatch paper, and the invoice starts from that same dispatch.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Wire coil receipt and heat numbers

Book each coil in against its mill certificate with heat number, diameter and weight, then issue it to a header by weight so that every blank ties back to its steel.

Fastener part master and drawing revision

Hold each part with its drawing, revision, property class such as 8.8 or 10.9, thread, coating and packing rule, and let a new revision go live only after quality approves it.

Customer orders and releases

Take blanket orders and weekly releases and check them against header and roller capacity. Shortfalls show on the screen long before the truck is due at the dock.

Heading and rolling planning

Plan lots across headers and thread rollers by die set and shift, so that similar diameters run together and the changeovers between them are grouped into one stop for tooling.

Work orders by machine and die set

Record pieces, scrap, first-off sign-off and stoppage reasons for every run, each tied to the die set, punch and roll die that made the pieces.

Heat treatment batch log

Enter furnace load, belt speed, zone temperatures, quench and tempering for each batch, so that surface hardness and case depth readings sit beside the cycle that produced them.

Coating and outside processes

A delivery note carries each lot out to the plating or zinc flake vendor, and the return is booked against it. The vendor’s coating thickness and salt spray report then sits on that lot’s record.

Lot inspection and certificates

Log torque, tensile, hardness and dimensional samples against a plan set per customer, and hold failed lots. The certificate of conformance prints only from lots that passed.

Tooling and die life

Count pieces per die set, punch and roll die, and flag sets near their usual life. Tooling cost per thousand parts is read from the record.

Dispatch, invoices and returns

Pack to the customer’s label and raise the tax invoice from the delivery. A returned lot is then recorded with the complaint and the cause found, and linked back to its coil.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Goods Receipt (GRN)

    Each coil is booked in against its mill certificate, so the heat number and weight are fixed before the header draws a single metre of wire.

  • Bill of Materials

    A part carries its steel grade, property class, coating and packing items with a revision, so a changed drawing does not reach the header unchecked.

  • Order Management

    Blanket orders and weekly releases are held per part, and shortfalls against the delivery schedule show before the truck is due at the dock.

  • Production Planning

    Lots are spread across headers and thread rollers by die set, so similar diameters run together and changeovers between them are fewer.

  • Work Order Management

    Every run records pieces, scrap, first-off approval and stoppage reasons against the machine, the punch and the die set used.

  • Batch and Serial Tracking

    A furnace batch names the lots inside it and its settings, so a hardness fault or shallow case depth points straight to one load.

  • Job Work Management

    Lots sent to plating or zinc flake vendors are tracked out and back, with short returns and thickness reports kept on the lot.

  • Quality Control

    Sampling plans per customer drive the torque, tensile and hardness entries, and a failed reading holds the lot from dispatch.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For plant managers

Read lots in process, lots on hold, machine output and late customer releases from the office, without walking the shop floor at every shift change.

For header and roller operators

See the work order, die set and drawing, then log pieces, scrap and stoppages on a screen at the machine. The paper shift sheet goes away.

For heat treatment staff

Enter each furnace load with its settings and hardness results, and see which lots wait at the furnace for the next batch of the same grade.

For quality engineers

Run sampling plans, hold or release lots, answer complaints from the lot record and issue certificates. Every complaint reply starts from the heat number on the lot.

For stores and the dock

Book each coil in against its mill certificate, follow lots out to the coater and back, and pack to the customer’s label rule at the dock.

Reports

The numbers the owner asks for.

  • Open lots at each header, roller and furnace step
  • Wire coil stock by grade, diameter and heat number
  • Hardness and torque results by lot and customer
  • Lots out at coating vendors, with days away
  • Scrap by part, machine and die set
  • Tooling cost per thousand parts
  • Customer releases against deliveries made
Good fit

Who this is built for.

  • Cold forging plants that head bolts, studs and screws for vehicle makers
  • Nut and washer makers that supply tier one assemblers
  • Fastener plants with their own heat treatment line
  • Makers that send lots to outside platers and coaters
  • Plants that supply warranty and aftermarket packs as well as line orders
Honest answer

When it is not the right choice.

  • A trader that buys in bolts and nuts and sells them on, with no heading or rolling of its own, is better served by the auto parts shop product.
  • A machine shop turning one-off pins and bushes is better served by a job shop product than a lot-based fastener plant.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Your part list and drawings

Part numbers, property classes, thread specifications and revisions are loaded as you hold them today.

Test plans per customer

Each vehicle maker gets its own sample sizes, test types and certificate layout, checked by your quality engineers before the first lot runs.

Furnace and coating fields

Furnace parameters and the coating vendor’s report fields follow what your plant records and what your customer asks.

Units and currency

Metric or imperial sizes, weights and currency are set per customer, with tax rules reviewed during implementation.

Hosted by GullySystem

GullySystem hosts the system so that planning, quality and stores read one record, and any change to test plans comes from GullySystem staff on request.

Works alongside

  • Email
  • Barcode and label printers
  • Weighing scales
  • Accounting export
  • Customer data exchange
Common questions

Questions owners ask before a demo.

Does it follow a lot from coil to customer?

Yes, from coil to carton. The lot names its coil, heat number, work orders, furnace batch, coating return and delivery note, and the trail opens from a pallet label or from a heat number.

Can furnace settings be saved with the lot?

Yes, the operator enters belt speed, zone temperatures, quench and tempering for each load, while a direct feed from a furnace controller is scoped separately as extra work.

How are coating vendors handled?

A lot leaves on an outward delivery note and returns against it. The vendor’s thickness report is attached, and any short quantity shows as open until the coater explains it.

Can one part have different test plans for two customers?

Yes, and it is set per customer. Sampling, tests and certificate layout attach to the customer and part together, so the same flange bolt can be tested two ways for two vehicle makers.

Does it count tooling life?

Yes. Pieces made are summed by die set, punch and roll die from the work orders, and a set is flagged when it nears the life you have set for it.

Does the software certify our quality system?

No, it does not certify anything. It holds the records and rules you define, while certification to IATF 16949 and its audits remain with your own quality team and the assessing body.

Can customer releases arrive electronically?

Not by direct link yet. A release is typed in or brought in from a file, and a data link with a customer’s portal is scoped as extra work.

How would existing lots and orders move over?

Part masters, open orders, coil stock and coating vendors come in from your existing sheets. Your stores and quality people confirm the figures before the first live lot.

How can we see a price?

A demo built on a fastener part and a sample lot comes first. The quotation then lists users, plants and connections.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Automotive Fastener Manufacturer Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements