Automotive · Auto Manufacturer Management SoftwareVariant bills, torque records, brake tests, rework bays and dealer dispatch, kept per vehicle.
Every vehicle gets its own record. Planning releases orders against the variant bill, and stores deliver kits to each station by supplier lot, whether the unit takes a subframe, a driveshaft or a sunroof. Operators record nutrunner torque and scanned part labels as they work. At the end of line, testers log roller brake, headlamp aim, toe-in, opacity and water-leak readings, and each failure is tied to a defect code. Warranty queries return to the same record.
- Stations, checklists and test sheets entered to match your line
- Part masters and variant bills migrated
- Checklist changes made by GullySystem staff
Planners, stores, line supervisors, testers, quality staff and dispatch clerks work from one record per vehicle. It holds the build order, variant parts, supplier lots, nutrunner torque readings, roller brake results and the dealer allocation, all keyed to the chassis number. A warranty claim lands on the same record.
What goes wrong before the software.
How the work flows through it, step by step.
- 1
Order and plan
Dealer and fleet orders are grouped by variant and market, and planning assigns build orders to weekly slots after checking axles, seats, harnesses, glazing and basecoat paint against stock.
- 2
Kit and release
Stores issue a kit per station against the variant bill, from the cockpit module to the bumper fascia, with seats and wheels arriving in the order they are fitted. Release waits for shortages. The planner may accept one knowingly.
- 3
Body, paint and assembly
Body shop, electrocoat, paint and assembly each record start, finish and checks against the vehicle identification number, and part lot labels are scanned the moment a part is fitted.
- 4
End-of-line test
The tester records roller brake, headlamp aim, diesel smoke opacity, toe-in and water-leak readings against the limits on the test sheet for that model. A pass moves the unit to certification. A fail goes to rework.
- 5
Rework and release
Rework logs the defect code, the cause, the part replaced and the retest result in one entry, such as a pinched hose or a stripped thread. Released units are certified, then parked.
- 6
Dispatch and aftersales
Units are allocated to dealers and shipped. Claims and campaigns return to the unit record.
What is inside.
Every module can be switched on, left out or changed to match how your team already works.
The business modules it is built from.
Each one is also available on its own, or inside a system built for you.
- Bill of Materials
Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.
- Production Planning
Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.
- Work Order Management
Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.
- Batch and Serial Tracking
Part lots and chassis numbers are linked at fitment, so a faulty hose or airbag batch returns the vehicles that carry it without reading line sheets.
- Quality Control
Roller brake, headlamp aim, emission and shower leak readings are compared to limits. A failed reading sends the unit to rework, not to the yard.
- Goods Receipt (GRN)
Deliveries are matched to the order. Safety lots such as seatbelt pretensioners wait for inspection, and only released lots become available to stores.
- Vendor Management
Each supplier record holds parts, first-article sample reports, delivery history and rejection counts, so schedules go to suppliers who have earned them.
- Workflow and Approvals
A stabiliser bracket change moves through design, quality and purchase approval. It stays blocked from the line until each sign-off is recorded.
How we would put it in.
Setup, data migration, integrations and anything built on top.
Explore moreBrowse business and AI solutions
Looking for another part of your workflow? Browse the modules by business function.
- Applicant Tracking (5)
- CRM (8)
- Finance & Accounting (10)
- Helpdesk (4)
- Human Resources (13)
- Inventory Management (5)
- Project Management (7)
- Manufacturing (6)
- Procurement (4)
- Sales and Distribution (6)
- Field Service (5)
- Statutory and Compliance (4)
- Retail and POS (4)
- Bookings and Appointments (3)
- Subscriptions (2)
- Assets and Fleet (4)
- Platform (6)
- Analytics (2)
- Documents (1)
- All business solutions
One system, each person sees their part.
For production planners
Turn dealer orders into build orders and weekly slots on the line, and see shortages of tyres, seats, windscreens or alloy wheels before an order reaches the shop floor.
For stores and purchase staff
Receive deliveries by lot and issue kits to stations. Chase suppliers against the delivery schedule when a driveshaft or harness consignment runs late for the line-side bins, and hold a lot that fails first-article approval.
For line supervisors and operators
Read the unit’s instructions on the station screen. Record nutrunner torque, fitments and part labels as the work is done, and call the supervisor when a reading holds the unit at your station.
For quality and test staff
Run the end-of-line sheet and hold suspect lots. Manage rework bays, and answer a recall query about a brake hose or seatbelt batch by part lot, without opening a single filing cabinet.
For dispatch and sales administration
Allocate units to dealers, print the invoices and delivery notes, and see which cars have left the yard on which car carrier before the dealer phones to ask.
The numbers the owner asks for.
- Build orders by variant against slot plan
- Subframes, harnesses and glazing short for release, by variant
- Supplier delivery lateness and lot rejection history
- Station defects and nutrunner torque exceptions
- End-of-line first-pass results by unit and test lane
- Rework causes by station, hose, seal and supplier
- Units in transit by dealer and car carrier
Who this is built for.
- Assemblers of hatchbacks, estates, vans and light trucks
- Bus, coach and ambulance conversion builders
- Makers of electric vehicles in modest volumes
- Coachbuilders and bodybuilders fitting bodies to bought-in chassis
- Plants running diesel, petrol and hybrid variants
When it is not the right choice.
- A garage building a single kit car every month, with one team and one drawing set, can run on a drawing register and a stock sheet.
- A plant that needs machine-level control of welding robots, paint booth conveyors and nutrunner controllers will want programmable logic controller (PLC) and line control equipment, which this does not replace.
Adapted to your business before it goes live.
You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.
Works alongside
- Nutrunners, torque tools and roller brake benches
- Barcode scanners and lot label printers
- Design and drawing revision systems
- Supplier portals and delivery schedules
- Accounting software export
- Dealer ordering systems
Checks to bring to your product demo.
Review these scenarios against the product configuration and record anything that still needs to be agreed.
Supplier schedules and part approval
What needs fresh approval after a record is changed?
For “Supplier schedules and part approval”, change a material detail after approval in the demonstration. Agree the next responsible person and the evidence needed before the work can continue.
Background reading: ERPNext: approval transitions
Goods inward and lot inspection
Who decides whether a failed result blocks the next step?
For “Goods inward and lot inspection”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.
Background reading: ERPNext: inspection criteria
Questions owners ask before a demo.
Can it follow a recall to the exact vehicles?
Yes. Lot labels are scanned at the station against the identification number, so a faulty brake hose or airbag lot returns the exact list of vehicles that received it.
How are variants kept apart on one line?
Each build order carries its own variant bill. Kits, station instructions and torque checks follow the order, so a diesel estate and a petrol hatchback on adjacent slots are never mixed up.
Does it read torque tools and test benches?
Where a nutrunner controller, a roller brake bench or a headlamp tester can send or export its readings, it is linked during implementation. Otherwise the operator keys them on the station screen.
Can a unit be held on a bad reading?
Yes. A wheel nut torque or a toe-in result outside its limit holds the unit and raises a rework entry that names the station and the reading.
How does engineering change control work?
A change names the part, the revision, the stores bin and the chassis number from which it applies, and sits in approval until design, quality and purchase have signed. Stores and stations switch at that chassis number, not on a calendar date, so a driveshaft revision reaches the bin and the station together.
Can we manage supplier approval of new parts?
Yes. A new bracket, harness or trim clip carries first-article status, and goods inward blocks release of its lots until the sample approval is recorded against the supplier.
Can dealers see where their orders stand?
Yes, for their own units only. A dealer login shows allocation, dispatch and delivery documents for that dealer, so every other dealer’s units and allocations stay out of sight.
Can it handle bodies fitted to bought-in chassis?
Yes. The cab chassis arrives as a unit with its own number, and the body build order for the box, tipper or coach shell is then recorded against it.
How would our part data get in?
Send the part masters and variant bills you keep. Columns are mapped to the part and variant records, and your engineers review the load with us before any build order uses it.
What would it cost a vehicle plant?
Variants, stations and users drive the cost of a vehicle plant. Connected nutrunners, torque tools, brake benches, scanners and label printers widen the scope, and so do supplier portals and dealer ordering links. Your own variant bills are demonstrated first. An itemised quotation follows, with each assumption stated.
How long before a line is building on it?
Duration depends on how many variants and stations the line carries. The initial release holds the variant parts master with bills, build orders, goods inward and station checks with torque records. End-of-line tests, rework, change control, dealer dispatch and recall traceability join as the line settles. The proposal sets out that order with dates.
What should the plant gather ahead of the first session?
Gather the variant and option list, current bills of materials, supplier schedules, the end-of-line test sheet and station check lists. Sample build orders, defect logs and dealer dispatch papers are useful as well. Planning, stores, the line, quality and dispatch should each nominate one contact. That person fields our questions and reviews screens.
Wondering what it would cost? Share your requirements and an engineer will come back with a scope.
Every part, on its own page.
Each page covers one part of the system: what it records, who uses it and what it hands on.
- Variant parts master and bills for vehicle makers
- Build orders and weekly slot planning for car makers
- Supplier schedules and first-article approval for vehicle plants
- Goods inward and lot inspection for vehicle assembly
- Station kitting and line-side feed for vehicle makers
- Station checks and torque records for vehicle assembly
- Paint and body shop stages per vehicle unit
- End-of-line test and certification for vehicle plants
- Rework and defect tracking for vehicle plants
- Engineering change control for vehicle assembly
- Dealer allocation and dispatch for vehicle makers
- Warranty and recall traceability for vehicle makers
Built for.
The trades this product is set up for. Pick yours to see how the work runs there.
See Auto Manufacturer Management Software set up around your records.
Tell us how you run things today. An engineer reads it and writes back with what fits as it is, what would need changing, and what we would start with.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements