Skip to main content
GullySystem

Station checks and torque records for vehicle assembly

Station checks record what was fitted, how tightly and with which part, at every station on the line. Nutrunner torque and angle values, fitment ticks and scanned part labels are kept against the unit. A reading outside its limit holds the unit, from wheel nuts to the steering rack mounting.

What a station check keeps for each unit

Every station has its own checklist. It is built from your line, not from a template. A station closes only when its checklist is complete. Four kinds of entry end up on the record of the unit. They are kept per unit, not per shift.

Fitment ticks by station

Each station lists what must be fitted and confirmed, from the first body station to the final audit. A tick records one fitment on that unit. With an open tick, the operator cannot close the station.

Torque and angle values

A nutrunner tightens a wheel nut or the steering rack mounting. The torque and the angle are recorded against the limits set for that joint, from your own station list. Out of limits is not a pass.

Scanned part lot labels

The operator scans the lot label of a part the moment it is fitted. That scan ties the lot to the chassis number. The scan is the record. Nobody copies a lot number from a sheet afterwards.

Readings that hold the unit

A reading outside its limit holds the unit and raises a rework entry. The entry names the station and the reading, such as a wheel nut torque that came in low. The unit does not move on.

A shift at the stations of a vehicle line

Checks run all shift. Four moments carry the weight. An operator fits, a reading arrives, a supervisor decides and quality reads the exceptions. Each leaves a record that a query can find later. Together they show how a held unit is handled.

An operator fits the wheel nuts

The unit arrives at the wheel station. Its instructions show on the screen. A nutrunner is run on each nut. Torque and angle are recorded for every one. The station closes once every nut is in range.

A low torque holds the unit

One wheel nut comes in under its limit. The reading is recorded and the unit is held at that station. The fitter calls the supervisor over. Nobody has to remember to flag it on paper.

A supervisor clears or sends on

The supervisor reads the held reading. A nut that can be re-tightened at the station is re-tightened and recorded again. Anything more serious goes to rework. That entry names the station and the reading, and the supervisor signs it.

Quality reads the torque exceptions

At the end of the shift, quality opens station defects and nutrunner torque exceptions. A repeat failure shows at once. The joint, the station, the shift and the part lot are all listed on the entry.

Who uses station checks and what each person sees

These records are used on the line but read in several offices. Operators and supervisors work from them live. Quality and stores read them afterwards. Each role sees the same record through a different question.

Operators at the station screen

Operators read the unit’s instructions on the screen. They record torque, fitments and part labels as the work is done. A held reading means a call to the supervisor. Nobody carries on regardless of the reading.

Supervisors with a unit on hold

Supervisors see every unit held at their stations, with the reading that held it and the limit it missed. They choose between re-tightening and rework. Each choice is recorded with a name and the reason.

Quality staff chasing a pattern

Quality staff see torque exceptions and station defects side by side. A repeat joint, station or part lot stands out. The pattern is plain. A loose wheel nut query is answered without opening a single filing cabinet.

Stores tracing a scanned lot

Stores see which units received a given lot, through the part labels scanned at the stations. A lot is later held. Stores know which kits and which units it touched. The list comes from the scans.

Decisions to settle before station checks go live

Station checklists copy your own line. Some choices are yours. Settle these four with the line supervisors and quality before any station screen is switched on. Each takes one short meeting.

Who may clear a hold

Name who may clear a held unit. A supervisor may re-tighten and record again, while quality must decide on a safety joint. Whatever you choose, the person and the reason are recorded beside the reading.

Which joints record values

Safety joints, such as wheel nuts and the steering rack mounting, record torque and angle values. Minor fixings may need only a tick. Decide the split station by station with quality, and write it down.

How checklists and limits are entered

Your station check lists and your torque and angle limits are entered to match the line. Your supervisors review them before use. Superseded sheets stay on file, so an old limit can still be read.

The station report to open first

Start with station defects and nutrunner torque exceptions. It shows which joint fails. It also shows which station fails. Review it at the end of every shift during the first period of live running. Then agree a rhythm.

How station checks connect to the vehicle record

A station record belongs to the unit. It takes parts from kitting and passes held units to rework. Later it feeds the end-of-line test and the recall query. These are the links a supervisor and a quality engineer use. Each is a record handed on, not a message sent.

  • Variant bills set the parts a station expects to fit
  • Station kitting supplies the parts whose labels get scanned
  • Rework and defect tracking receives every unit that is held
  • Warranty and recall traceability reads the scanned lot labels
  • The end-of-line test picks up after the last station

Where station checks stop

Readings are what this feature records. It does not tighten a bolt, and it does not replace the nutrunner controller, which stays with your line equipment. Control of welding robots and paint booth conveyors also stays with programmable logic controller (PLC) equipment. Torque limits come from your engineers. A garage building one kit car a month can keep a build sheet instead.

FAQ

Frequently asked questions

What if a nutrunner cannot send its readings?

The operator keys the torque and angle on the station screen. The same limits apply to a keyed value. Linking the controller later changes only how the reading arrives, not the check or the hold.

Who can release a unit that is on hold?

Whoever your plant has named. A supervisor may clear a minor joint, and quality may be required for a safety joint. The release is recorded with the person, the reading and the reason given for it.

Do the checks change with the variant on the unit?

Yes, they follow the build order. Station instructions and torque checks come from the variant on the order. A diesel estate and a petrol hatchback on neighbouring slots each show their own joints and limits at the same station.

Can paper sheets be dropped entirely?

The record on the unit replaces the sheet that travels with the vehicle. Operators record at the station. A query then does not wait for a cabinet. Your quality manager decides when the paper copy is retired.

Does it replace our nutrunner controller?

No, the controller still tightens the joint and decides its own cycle. This feature takes the result. It compares it with your limit and keeps it against the unit, where a query can find it.

Where it fits

How this feature fits the system.

Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Variant parts master and bills of materials

Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.

Bill of Materials

Build orders and slot planning

Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.

Production Planning

Station checks and torque records

Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements