Skip to main content
GullySystem

Automotive · Software for auto manufacturersKeep every build order, torque record and end-of-line test on the vehicle identification number.

A vehicle assembler turns thousands of parts into a few thousand units, and each unit must stay traceable for years. The software holds build orders, variant bills of materials, station torque checks and roller brake results against one VIN per vehicle. Supplier lots and dealer dispatch hang off that same number.

At a glance

Engine, trim, paint code, market and options change from one chassis to the next, and the line sheet riding on each windscreen must change with them. When a recall notice names one supplier lot of wheel bearings, someone has to list every VIN that carried it before the dealers ring.

Software for vehicle assemblers begins at the build order and ends at the dispatch note. Between them the VIN gathers seat frame lots, wiring harness variants, fastener torques, rework tags and chassis dynamometer readings. Traceability is a by-product of the line running, not a separate audit project.

How the work runs today

Dealers and fleet buyers order by variant and market. Planning turns each order into a build order against a weekly slot, but only once every part for that variant is on hand. Stores then issue kits to the body shop, trim line and chassis line against the variant list. Goods inward matches each delivery to its purchase order and holds brake hoses and bearings for inspection before they reach the line-side racks.

At each station the operator scans the VIN and logs torque on the wheel nuts, the subframe bolts and the seat rails, plus the lot label of every critical part fitted. Paint and body shops log their own stages. At the end of the line a tester runs the roller brake, emission probe, headlamp aim and water leak booth. Failures go to the rework bay. Passed units are certified, parked in the yard and dispatched with their documents.

Where it breaks

What goes wrong for auto manufacturers without a proper system.

Variant parts are short at the station

A kit goes out for the wrong trim. A seat arrives in the wrong fabric. The variant bill of materials is a spreadsheet per model, edited by hand and copied from one planner to the next until nobody trusts any of the copies.

A supplier lot cannot be traced to units

A bearing batch is found faulty. Nobody can name the chassis numbers that received it without opening every line sheet from those weeks and reading each one.

Torque and test readings sit on paper

Station checklists are boxed in a records room. A warranty claim means turning over old handwriting until the right VIN appears. One unit can swallow an afternoon.

Rework has no owner

A failed unit waits in the rework bay because the cause is written on a paper tag. The tag falls off. The fault is never recorded and the same fitting error repeats.

Engineering changes reach the line late

A drawing revision for a bracket is approved in the design office. Stores still issue the old part, because nobody named the first chassis number to carry the new one.

What changes

What auto manufacturers gain from one system.

Not a feature list. These are the moments in the working day that go differently once the records sit together.

A recall list drawn from the VIN

When a supplier lot of wheel bearings is named in a notice, the system lists every VIN that carried it. Quality hands the list to dispatch before the dealers ring. Nobody checks line sheets from the weeks in question. Recalls are short, exact lists. Nobody recalls the wrong vehicles.

Variant parts staged before the station needs them

Each build order turns into a kit list for the body shop, trim line and chassis line. Stores see a missing seat frame variant before the slot is released. Planning does not release a build that cannot be completed. Line stops are avoided. Kits arrive complete.

Torque readings stored against the vehicle

The operator’s scan of the VIN logs the wheel nut, subframe bolt and seat rail torques, with the lot label of every critical part. A warranty claim finds the reading for one vehicle. No clipboard is searched. Evidence is ready for any audit. Torque history belongs to the vehicle.

End-of-line rework with an owner

A vehicle failing the roller brake or emission probe is logged with the fault and the person responsible. The line supervisor sees rework waiting at the end of the line. A unit does not leave until the recheck is signed. Nothing slips through. The record shows who owns the fix.

Engineering changes reaching the line on time

A change to a wiring harness variant is released with an effective VIN and the stations affected. The line sees it before the first affected vehicle arrives. Dealers allocate units knowing which variant they will receive. Late changes stop causing rework. Station and dealer see the same effective date.

What the software does

What we would build for auto manufacturers.

Named the way your team already talks about the work. We start with whichever part the audit shows is costing you most.

Build orders and variant bills of materials

Hold a bill of materials per variant and market. Release a build order against a weekly slot after showing part shortages station by station.

Supplier schedules and goods inward

Send delivery schedules to suppliers, receive against them, and hold critical lots such as brake hoses for incoming inspection before the line-side racks.

Station checks and torque records

Record fitments, nut runner torque values and part lot labels against the VIN of the unit in front of the operator. Nothing is filed later.

End-of-line testing and rework

Capture roller brake, emission, headlamp aim and water leak readings. Route failed units to the rework bay and log cause and fix under the same VIN.

Engineering change control

Approve a drawing or part change with an effective chassis number, so stores and the line switch brackets on the same unit.

Dealer allocation and dispatch

Allocate finished units to dealer orders, print delivery documents carrying the VIN, and follow each carrier truck in transit.

Warranty and recall traceability

List every unit carrying a given supplier lot, part number or build week, and follow each warranty claim back to its cause.

Paint shop colour and lot

Body colours and paint lots are recorded for every vehicle. The record shows booth, date and the paint batch used. Touch-up work is matched to the same lot.

Fixture and gauge register

Welding fixtures, jigs and gauges are listed with their location and calibration due date. Maintenance staff see which fixture sits on which line and station. Overdue gauges are tagged.

Chassis and engine number allocation

Every vehicle receives a chassis number and an engine number in sequence. The record ties both to the build order and the dealer. Registration paperwork draws from it.

Before you talk to a supplier

A requirements checklist for auto manufacturers.

What to cover, which reports to ask for and what to put to every vendor, ready to print or save as a PDF.

Open the checklist
Solutions inside

The business modules auto manufacturers use most.

Each one is also available on its own, or inside a system built for you.

Bill of Materials

A bill of materials for a sedan lists parts that change with engine, gearbox and trim. Every variant has its own bill. Planners read the bill that matches the build order.

Learn more

Production Planning

Body shop, paint, trim and final assembly are sequenced from the dealer order bank for the week. A short part holds back the line. Planners reshuffle the sequence around the missing part.

Learn more

Work Order Management

Each vehicle on the line carries a work order with its stations and checks. Operators see their next unit. Rework orders are raised from the end of line.

Learn more

Batch and Serial Tracking

Engines, gearboxes and axles are serialised and tied to the vehicle they were fitted to. Recalls follow the part number. A single suspect lot yields a list of affected chassis.

Learn more

Quality Control

A quality gate at each station asks the inspector to record torque, leak and fitment checks. Open defects are listed against the chassis. Passed units move to the next station.

Learn more

Goods Receipt (GRN)

Seats, wiring harnesses and tyres arrive in build sequence from suppliers. Receipts are matched to the call-off. Shortages are reported to the line before the truck is fully unloaded.

Learn more

Vendor Management

Tier-1 suppliers are rated on delivery and defect counts for each part family. Corrective action requests are logged. Purchasing sees which supplier is behind on harnesses or castings.

Learn more

Workflow and Approvals

A change to a bracket or a harness needs engineering, quality and purchasing sign-off before production uses it. Every approver is recorded. The line sees the effective chassis number.

Learn more
AI by department

Where AI can help auto manufacturers.

Each one reads records you already keep, and a person approves every decision.

Services

The services behind it.

How it works

How the work runs from Bengaluru for your city.

  1. 1

    The audit, by call

    A screen-share and a look at the sheets, accounting reports and WhatsApp groups your team uses. No travel needed.

  2. 2

    A written proposal

    Scope, what we build first and the cost, agreed in writing before anything starts.

  3. 3

    Build in short rounds

    Working screens shared every few weeks. Your team tests them from your own office.

  4. 4

    Go-live, in person when it helps

    For data migration and training we can come to your city. Travel is agreed in advance.

  5. 5

    Support online

    Fixes, changes and hosting handled remotely by the same team that built it.

Make an informed decision

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Warranty and recall traceability

What proves that a planned task was actually completed?

Select an overdue entry in “Warranty and recall traceability”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.

Background reading: ERPNext: maintenance plans

Dealer allocation and dispatch

Can a partial delivery be distinguished from a completed order?

For “Dealer allocation and dispatch”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

Common questions

Questions auto manufacturers ask before they call.

Is this for large car makers?

It suits assemblers of cars, trucks, buses and specialist vehicles built in modest volumes. A plant with group-wide product design and shop-floor systems would run this beside them. It does not replace them.

Can it follow a supplier lot to the vehicles that received it?

Yes. Lot labels are scanned at each station against the VIN, so a faulty bearing lot returns every affected unit in one query, with no paper line sheets opened.

Does it connect to torque tools and test benches?

Where a nut runner or brake roller can export or send readings, they are linked during implementation. Where it cannot, the operator keys them on a station screen.

Can it handle several variants on one line?

Yes. Each build order carries its own variant bill of materials, so kits and station instructions follow the unit rather than the line.

How is a vehicle assembler’s system priced?

Variants and bills of materials in scope, stations that log torque, and test benches to be read all weigh in, as do supplier schedules and dealer systems to link. A quotation comes once build records are shown back to you on sample screens. Each part carries a separate price.

What should an assembly plant bring to the start?

A variant bill of materials, a station check sheet, an end-of-line test report and a supplier delivery schedule. Sample dealer allocation lists help, and the plant should name an engineer, a stores head and an inspector to go through each screen as the build takes shape.

What happens to VIN records if we end the arrangement?

Build, torque and test history stays with the plant, along with the code. An export gives flat files keyed by VIN. Nothing is held back. The same builders look after support, and the plant may host on its own network.

What happens after I share my requirements?

We review your brief and clarify the work with you. We then look at the software, spreadsheets and WhatsApp groups your business runs on today and write down what works, what slows your team down and what is missing. A demo login, a screen-share or a few screenshots are enough. You get a short written summary ordered by priority, with no obligation to hire us afterwards.

How much will the software cost?

We don’t publish a price, because it depends on what the system has to do. That first review settles the scope, and the cost goes into a written proposal before any work starts.

Category

Part of a wider group.

Talk to us

Tell us how your business runs today.

A few lines on your spreadsheets, software and WhatsApp groups is enough. We reply the same working day.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements