Rework and defect tracking for vehicle plants
Failed units go to a rework bay. Each one carries a defect code, a cause and the fix applied, such as a re-torqued driveshaft nut or a reseated door seal. The retest result sits in the same entry. Defects count against the station that raised them, so a repeated mistake shows plainly.
What a rework entry keeps for a failed unit
One rework entry follows a unit from failure to retest. It replaces the three places where a cause, a replaced hose and a retest used to land. Four parts make up the entry. Each is a field, not a note.
A day in the rework bay
The rework bay takes whatever the line and the test lanes reject. A technician, a supervisor and a quality engineer each work from the same entry. These four moments show the feature in use. Each one adds a line to a record.
Who works from rework entries and what they see
Rework touches the whole plant, but four roles work from the entries every day. Quality runs the bay. Supervisors act on the counts. Planning and purchase feel the effects.
Decisions to settle before rework tracking starts
Rework entries are only as clear as their codes. Settle these four with quality, the supervisors and purchase before the first failed unit is logged. They shape every report that follows.
How rework connects to the rest of the plant
Rework is where failures from three directions meet. Stations hold units, the end-of-line test rejects them and the paint line reports surface faults. All of them open entries here. These are the links that matter to a quality engineer. Each is a record passed on.
- Station checks hold a unit and open the entry
- The end-of-line test sends failed units to the bay
- Paint and body shop stages report surface defects here
- Supplier history takes the supplier causes found here
- Warranty and recall traceability compares claims with these causes
Where rework tracking stops
Rework tracking records the fault, the cause, the fix and the retest. It does not repair a unit. It does not decide who is to blame either. Claims against a supplier, credit notes and the cost of rework stay with purchase and your accountant. A garage building one kit car a month can note repairs on a job sheet.
Frequently asked questions
What opens a rework entry?
A held reading at a station, or a failed lane at the end of the line. The entry opens at once. It names the station or lane and the reading. The cause, fix and retest are added later.
Can a unit wait in the bay for a part?
Yes, the unit stays in rework, marked as awaiting a part. Planning sees it in the count of units in rework and knows it cannot ship until the part arrives. Purchase sees which part is holding it.
How are defect codes set up?
From your own defect logs. The codes you already use are gathered, merged and reviewed with quality. Each code is then entered once, so a hose fault has the same name at every station and test lane.
Does a defect count against the station that raised it?
It does. Each entry names the station or lane that raised it, and the counts add up by station. That is how a repeat becomes visible. One mistake cannot continue week after week unseen, because the counts are plain to read.
Does it blame the supplier for a bad hose?
It records the cause that quality enters and lets you group causes by supplier. The conclusion is still drawn by your people. The count gives buyers evidence for a conversation with the supplier, not a verdict.
How this feature fits the system.
Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Variant parts master and bills of materials
Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.
Bill of MaterialsBuild orders and slot planning
Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.
Production PlanningStation checks and torque records
Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.
Work Order ManagementTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements