Skip to main content
GullySystem

Rework and defect tracking for vehicle plants

Failed units go to a rework bay. Each one carries a defect code, a cause and the fix applied, such as a re-torqued driveshaft nut or a reseated door seal. The retest result sits in the same entry. Defects count against the station that raised them, so a repeated mistake shows plainly.

What a rework entry keeps for a failed unit

One rework entry follows a unit from failure to retest. It replaces the three places where a cause, a replaced hose and a retest used to land. Four parts make up the entry. Each is a field, not a note.

Defect code and where it arose

Each entry opens with a defect code and the station or test lane that raised it. A low wheel nut torque names the station. A failed shower names the lane. The code gives every fault one name.

The cause that was found

The cause is written once the fault is understood, such as a pinched hose or a stripped thread. It is a field. A margin note is not enough. Causes can later be counted by station and by supplier.

Fix and part replaced

The fix is recorded, such as a re-torqued driveshaft nut or a reseated door seal. When a part is replaced, the part and its lot go on the entry. A swapped hose or weatherstrip stays traceable.

The retest result

Its retest result sits on the same entry. Units that pass go on towards release and certification. One that fails again stays in the bay, and the entry shows both attempts side by side for the quality engineer.

A day in the rework bay

The rework bay takes whatever the line and the test lanes reject. A technician, a supervisor and a quality engineer each work from the same entry. These four moments show the feature in use. Each one adds a line to a record.

A failed unit enters the bay

A unit fails the roller brake test and arrives in the bay. Its entry is already open, with the lane and the reading that failed. Work starts from facts. Nobody has to ask what went wrong.

A technician replaces a hose

The fault is a pinched brake hose. The technician records the cause, fits a new hose and scans its label. The part and lot go on the entry. If the hose is not in stock, the unit waits for a part.

A retest closes the entry

The repaired unit goes back to the brake bench. On the retest it passes, and the result is added to the entry. The entry closes. The unit returns to the test sequence and can be certified.

A supervisor reads station defects

At the end of the week a supervisor opens defects by station. One wheel nut station has raised the same fault again. The count shows it. Week after week, the repeat is visible against that station.

Who works from rework entries and what they see

Rework touches the whole plant, but four roles work from the entries every day. Quality runs the bay. Supervisors act on the counts. Planning and purchase feel the effects.

Quality staff running the bay

Quality staff manage the rework bays. They see every unit in rework, its defect code, its cause and its status. They answer a query about a brake hose or seatbelt batch from the same entries.

Supervisors tracing a repeat

Supervisors see defects counted against their own stations. A joint that keeps coming back stands out. They use the count to retrain operators, to re-check a tool or to ask engineering about the design of the part.

Planners watching units in rework

Planners see the number of units in rework and which are waiting for a part. A unit in the bay cannot ship. That shapes what can be promised to a dealer this week, and what must wait.

Buyers reading supplier causes

Buyers see rework causes grouped by supplier, hose and seal. A weatherstrip that fails at several stations points to its supplier. The evidence sits on the entries. It is not in anyone’s recollection. Buyers can open that talk with facts.

Decisions to settle before rework tracking starts

Rework entries are only as clear as their codes. Settle these four with quality, the supervisors and purchase before the first failed unit is logged. They shape every report that follows.

Who may close an entry for Rework and defect tracking

Name who may close a rework entry. A technician may record the fix, but a quality engineer may need to confirm a safety repair. Each closure carries a name. That makes the bay accountable for what it releases.

Which defects get a code

Decide what earns an entry. Failed readings and failed tests always do. Minor cosmetic marks may be handled at the station instead. Draw the line with quality, and write the rule down before the first shift of live running.

How the code list is built

Gather your defect logs and sample entries before the first session. The code list is built from them. Quality reviews it. A short list that fits your faults works better than a long borrowed one.

The rework report to open first

Begin with rework causes by station, hose, seal and supplier. It shows where one fault keeps returning. Read it with quality and purchase together. Do so after the first batch of failures, while memories are fresh.

How rework connects to the rest of the plant

Rework is where failures from three directions meet. Stations hold units, the end-of-line test rejects them and the paint line reports surface faults. All of them open entries here. These are the links that matter to a quality engineer. Each is a record passed on.

  • Station checks hold a unit and open the entry
  • The end-of-line test sends failed units to the bay
  • Paint and body shop stages report surface defects here
  • Supplier history takes the supplier causes found here
  • Warranty and recall traceability compares claims with these causes

Where rework tracking stops

Rework tracking records the fault, the cause, the fix and the retest. It does not repair a unit. It does not decide who is to blame either. Claims against a supplier, credit notes and the cost of rework stay with purchase and your accountant. A garage building one kit car a month can note repairs on a job sheet.

FAQ

Frequently asked questions

What opens a rework entry?

A held reading at a station, or a failed lane at the end of the line. The entry opens at once. It names the station or lane and the reading. The cause, fix and retest are added later.

Can a unit wait in the bay for a part?

Yes, the unit stays in rework, marked as awaiting a part. Planning sees it in the count of units in rework and knows it cannot ship until the part arrives. Purchase sees which part is holding it.

How are defect codes set up?

From your own defect logs. The codes you already use are gathered, merged and reviewed with quality. Each code is then entered once, so a hose fault has the same name at every station and test lane.

Does a defect count against the station that raised it?

It does. Each entry names the station or lane that raised it, and the counts add up by station. That is how a repeat becomes visible. One mistake cannot continue week after week unseen, because the counts are plain to read.

Does it blame the supplier for a bad hose?

It records the cause that quality enters and lets you group causes by supplier. The conclusion is still drawn by your people. The count gives buyers evidence for a conversation with the supplier, not a verdict.

Where it fits

How this feature fits the system.

Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Variant parts master and bills of materials

Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.

Bill of Materials

Build orders and slot planning

Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.

Production Planning

Station checks and torque records

Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements