Skip to main content
GullySystem

Variant parts master and bills for vehicle makers

The variant parts master holds every part a vehicle plant buys or makes, with its drawing revision, supplier and approved alternate. Bills of materials are built on that master by model, trim, engine and market. Planners, buyers and stores read the same bill, so a diesel estate is never kitted like a petrol hatchback.

What the parts master records for each part

Every part is one record. Engineers, buyers and stores all read it. A bill is a list of those records. It is grouped by the variant that takes them, so a drawing change is made once and reaches every bill that carries the part.

Drawing revision and part number

The record holds the part number and the drawing revision in force. That covers a wishbone bush, a rubber grommet, a wiring clip or a hinge pin. Each revision is kept against the part. Nobody guesses which drawing applies.

Supplier and approved alternate

Each part names its supplier and, where engineering has approved one, an alternate part. Purchase staff see the fallback when a delivery runs short. The alternate is approved in advance. Nobody agrees it over the phone on the day.

Variant bills by model and trim

A bill lists the parts one variant takes, from the subframe to the wiper arm. Model, trim, engine and market each change it. Each variant has its own. A diesel estate bill and a petrol hatchback bill never share a kit.

Engine and market options

Engine and market change the bill. A diesel, petrol or hybrid unit takes its own set, and a market option adds or swaps parts. Colour codes and wheel packs follow the names your sales desk uses.

A working week with the variant bills

The master is edited by a few people and read by everyone. Engineers change it. Buyers, planners, stores and the line read it every day. These four moments show where a bill is touched in a working week. Each one starts from the same record.

A product engineer adds a trim

A new trim arrives from the sales desk with a different seat, wheel pack and door trim. The engineer starts from the nearest bill. Only the parts that differ are swapped, and the rest stay shared.

A buyer reviews an alternate

A supplier warns that a wiring clip will arrive late. The buyer opens the part. The approved alternate is already on the record, so there is no search through drawing files, old emails and shared folders.

A planner opens a build order

A planner opens a build order for a diesel estate. The order reads only the parts on that variant’s bill. Shortages are counted against that bill. Parts for other variants are left out of the check.

Stores issues a kit

Stores issues the kit that the bill lists for the unit at that station. A fitter finds a wrong grommet. The part number on the label is checked against the bill. The answer is clear at once.

Who reads the parts master and what they see

Four roles read the master. Each looks for something different. Edits come from the people who own the drawings, and everyone else reads the record to make a decision of their own.

Planners reading the bill

Planners read the bill behind each build order. Shortages of tyres, seats, windscreens or alloy wheels show against the variant they belong to. They see which parts a slot needs before the order reaches the shop floor.

Stores and buyers on each part

Stores read the bill to build kits by supplier lot. Purchase staff read the supplier and approved alternate on each part. A late driveshaft or harness consignment is chased against that record. A lot that fails approval is held.

Supervisors checking a doubtful part

Operators work from the kit the bill produced. When a fitter doubts a part, the supervisor looks up the part number and its drawing revision. The answer takes one search. The line does not stop to find a paper drawing.

Quality staff tracing a defect

Quality staff use the bill to know what a unit should carry. When a defect points at a hose or seal, they read its supplier and revision from the part record. That is where a rework cause begins.

Decisions to settle before loading the parts master

A parts master is only as good as its first load. These four decisions are made with your engineers and buyers before any build order reads a bill. Settle them first.

Who may edit a part

Name who may edit a part, a revision or a bill. Perhaps engineers own revisions and bills while buyers own the supplier and alternate fields. Whatever you choose, each edit has an owner. Changes to a live bill are better routed through change control.

What stays out of the master for variant parts master and bills of materials

Decide which items are not kept as parts. Bulk workshop consumables may stay on a stores sheet, while every part that is fitted to a unit gets a record. Draw the line with quality before loading.

How existing bills come across for variant parts master and bills of materials

Send the part masters and variant bills you keep now. Columns are mapped one line at a time, and your engineers and buyers review the load first. Where two copies disagree, pick the true one. Do it before loading.

The bills report to open first

Choose the report to read first. The one on build orders by variant against the slot plan shows which variants are about to use each bill. Start with the busiest variant and check its bill line by line.

How the parts master feeds the vehicle plant

The master sits at the start. Other features read from it or hand a change back to it. These are the points where a bill meets the rest of the product. A wrong record would travel to all of them, so the first load is checked with care.

  • Build orders read the variant bill for shortages
  • Station kitting issues kits from the same bill
  • Engineering change control revises parts and sets the chassis number
  • Supplier schedules and part approval use each part’s supplier record
  • Warranty and recall traceability links part lots to vehicles

Where the vehicle parts master stops

The parts master records parts, revisions and bills. It is not a drawing system, so the drawing itself stays in your design and drawing revision system, which can be linked. It does not decide whether a design is right. Price and cost decisions stay with the buyer and your accountant. A garage building one kit car a month can run on a drawing register and a stock sheet.

FAQ

Frequently asked questions

Can one part sit on bills for several variants?

Yes. The part is held once. Each bill that needs it points to that record. When engineering revises the drawing, the change is made on the one record and every bill that carries the part shows it.

Where is the approved alternate shown to buyers?

On the part record. A buyer chasing a late hinge pin or grommet sees the supplier and the approved alternate together, without opening another file. An alternate that engineering has not approved is not shown there.

What if two copies of a bill disagree at load?

Engineers settle it before loading. Where two spreadsheet copies of a bill differ, they name the correct one, and the other copy is left out of the load. Each build order then reads a single bill per variant, not a choice of two.

Does the master replace our drawing register?

No, it holds the drawing revision beside each part. A fitter then knows which drawing applies. The drawings stay in your design and drawing revision system. A link to it can be scoped in implementation.

How does a coach or ambulance builder use the bills?

A coachbuilder’s bodies get their own bill. The chassis arrives as a unit with its own number. The body build order then lists the parts for the box, tipper or coach shell that goes on it.

Where it fits

How this feature fits the system.

Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Variant parts master and bills of materials

Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.

Bill of Materials

Build orders and slot planning

Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.

Production Planning

Station checks and torque records

Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements