Skip to main content
GullySystem

Goods inward and lot inspection for vehicle assembly

Goods inward receives parts against purchase orders and gives every delivery a lot. Safety lots, such as brake hoses, seatbelt pretensioners and airbag inflators, are held for inspection before stores can see them. Only released lots can be issued to the line, so a part nobody has checked never becomes part of a vehicle.

What goods inward records for each lot

A delivery arrives as a lot. That lot has its own record, tied to the order it came against. Four things are kept on it, and each one matters later when a query comes back from a vehicle. Here they are.

Receipt against the order for Goods inward and lot inspection

Each delivery is matched to the purchase order that asked for it. Quantity received is set beside quantity ordered. A short or over delivery is visible at the dock. Nobody reconciles it weeks later from a paper delivery note.

Lot number and supplier label

The supplier’s lot number is recorded, and a lot label is attached to the parts. That label follows them to the line-side bin. A scan at fitment later ties the lot to a chassis number.

Hold status and inspection result

Safety lots arrive on hold. The inspector records pass or fail, with the reason for any rejection. Until a pass is recorded, the lot stays out of sight of stores and cannot be issued to a station.

Release or rejection decision

A released lot becomes available to stores. A rejected lot stays blocked and is counted against its supplier. The decision carries the name of the person who made it, so a later query has an owner.

A working week at the receiving dock

The dock is where a vehicle plant meets its suppliers. A clerk, an inspector, a storekeeper and a buyer each touch a lot in turn. These four moments show how goods inward is used. Each leaves a record behind. Follow one lot through the week.

A delivery of brake hoses arrives

The receiving clerk matches the delivery to its order and records the lot. Brake hoses are a safety part, so the lot goes on hold at once. It is not yet stock. Stores cannot see it.

An inspector checks a pretensioner lot

Seatbelt pretensioners from one lot reach the inspection bench. The inspector checks it as your quality plan requires and records the result. A pass releases the lot to stores. The record shows who passed it.

A lot fails and goes back

A hose lot fails inspection. It is rejected and stays blocked, and the failure is counted against the supplier. The buyer sees it. The planner sees that the part will now be short for the next slot.

Stores looks for a part

A storekeeper searches for airbag inflators to kit a station. Only released lots appear. Anything still on inspection is not listed, and neither is a lot of a new part whose sample is not yet approved.

Who sees the receiving record and what they see

Four roles meet at goods inward, and each sees a different slice of the same lot record. Stores and purchase see the delivery. Quality sees the hold. The line and planning see the result in what they can use.

Storekeepers receiving against orders

Storekeepers receive deliveries by lot. They see only the released stock they may issue. A delivery that does not match its order is flagged at receipt. Held lots show a status, never a quantity to issue.

Buyers chasing late and rejected lots

Buyers see which lots have arrived, which are held and which are rejected. A late driveshaft or harness consignment is chased against the schedule. Approval gaps are visible too. New parts wait until the sample is signed off.

Quality staff holding suspect lots

Quality staff run the inspection. They hold any lot they distrust. A suspect lot is blocked before it reaches a station. The hold and the release both carry a name, a reason and the lot number.

Planners reading usable stock

Planners see stock that is released and usable, not stock that is merely in the building. A shortage for a slot counts only what can really be issued to a station. That keeps the release decision honest.

Decisions to settle before receiving starts

Receiving follows your quality plan, so some choices belong to you. Agree these four with stores, quality and purchase before the first delivery is booked in. They are short conversations.

Who may release a held lot for Goods inward and lot inspection

Name who may release a lot from hold. Release is a quality decision, not a stores decision. Decide whether a second person confirms a release for brake and restraint parts. Each release then has a named owner.

Which parts are safety lots

Brake hoses, seatbelt pretensioners and airbag inflators are the named examples. Quality decides what else goes on hold at receipt, and records the list. A short list is policed properly. A long one trains staff to ignore it.

How stock on the shelf starts

Part masters and supplier lists are lifted from the spreadsheets you keep now. Shelf stock needs a starting lot record. Decide that with stores and quality. Each such lot counts as released, or it is inspected first.

The receiving report to read first

Begin with supplier delivery lateness and lot rejection history. It shows what is late. It also shows what has failed. Review it with purchase after the first deliveries, while the lots are still fresh in mind.

How goods inward connects to the plant

This feature is the gate. It takes expectations from purchase and hands released lots to stores. Everything after it depends on the lot record created here. A gap here is found at a station, or in a recall. These are the hand-offs a storekeeper and an inspector rely on.

  • Supplier schedules and part approval set what should arrive
  • The variant parts master names each part and its supplier
  • Station kitting draws only from released lots
  • Build orders count released stock when checking shortages
  • Warranty and recall traceability starts from the lot record

Where lot inspection stops

Goods inward keeps the record. It does not carry out the inspection itself, so the gauges, the sampling method and the pass limits stay with your quality staff. The receipt, the hold and the decision are recorded here. Supplier invoices are not paid here, because they belong to your accounting software and its export. A garage building one kit car a month can count parts into a stock sheet instead.

FAQ

Frequently asked questions

Which parts are held as safety lots?

Your quality staff choose them. Brake hoses, seatbelt pretensioners and airbag inflators are the examples to start from. Parts with a new first-article status are held as well, until the sample sign-off is recorded against the supplier.

Can stores issue a lot still on hold?

No, a held lot is invisible to stores. It cannot be kitted. Only after quality records a release does the lot appear as stock, and from that point a storekeeper can issue it to a station.

What happens when a lot fails inspection?

It stays blocked, and the rejection is counted against the supplier’s history. The buyer sees it at once. The planner sees the shortage it causes. The failed parts never reach the line or a station.

Does it print lot labels at the dock?

Where a lot label printer or barcode scanner can be linked, it is connected during implementation. Otherwise labels are attached by hand. Either way, the lot number is recorded against the delivery at receipt, before anything is shelved.

How does a received lot reach the vehicle record?

The lot label travels with the parts to the line-side bin. At the station, a scan ties that lot to the chassis number. A recall query starts there. It returns the vehicles that carry the lot.

Where it fits

How this feature fits the system.

Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Variant parts master and bills of materials

Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.

Bill of Materials

Build orders and slot planning

Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.

Production Planning

Station checks and torque records

Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements