Paint and body shop stages per vehicle unit

Paint and body shop stages follow each unit through the body shop and the paint line. Spot-weld counts, seam sealer, electrocoat, primer, basecoat, clearcoat and oven cure are logged per unit. Film thickness is read in microns, and orange peel or dirt is recorded. Each stage is kept against the vehicle identification number.

What the body and paint stages record

Paint hides its own history. A unit that leaves the booth shows only its finish. So each stage is recorded as it happens, against the vehicle identification number. Four kinds of entry are kept for every unit that passes through the shops.

Spot-weld counts and sealer

Body shop stations log the spot-weld count for the unit and whether seam sealer was applied. The count is compared with the number your procedure asks for. A short count is a defect. It is caught before paint, not after.

Coats from electrocoat to clearcoat

Electrocoat, primer, basecoat and clearcoat are each logged for the unit, with start and finish times. The colour code from the paint card sits on the record. A skipped coat shows as a gap. The order of coats is plain to read.

Oven cure and film thickness

Oven cure is logged per unit. Film thickness is read in microns and recorded against the limit for that coat. A reading outside its limit is flagged on the unit’s record, where quality will see it.

Orange peel and dirt defects

Orange peel and dirt are found at inspection. Each defect is recorded against the unit and the stage that caused it, with the coat involved. The entry goes to rework. The colour code is attached to it.

A shift through the body and paint shops

Each unit crosses the body shop, the electrocoat tank, the paint booths and the cure oven in one pass. Four people record it along the way. Each one adds a stage to the same record.

The body shop logs its welds

At the welding station the operator confirms the spot-weld count for the unit. Seam sealer is ticked as applied. The station then closes. Any shortfall is recorded now, while the body can still be repaired in the shop.

Electrocoat and primer go on

The unit enters electrocoat and then primer. Each coat is logged with its start and finish against the vehicle identification number. A coat that never got logged is easy to spot before the topcoat goes on.

An inspector measures the film

A paint inspector reads film thickness on the bonnet and the roof panel. The readings are in microns. Every reading is recorded on the unit. Anything outside the limit for that coat is flagged at once.

A dirt defect goes to rework

Dirt is found in the clearcoat. The inspector records the defect and the stage. The unit goes to rework with its colour code. Later, the entry shows which booth and shift produced the fault, so a pattern becomes visible.

Who uses the paint record and what each sees

The paint record is written by a few people and read by several more. Operators log and inspectors measure. Planning and quality read the result from different sides. Each role looks for something different.

Body shop operators logging welds

Operators read the unit’s instructions on the station screen. They record the spot-weld count and the sealer check. The station closes once its entries are complete. A short count goes to the supervisor to deal with.

Paint line supervisors watching stages

Supervisors see which units are in electrocoat, primer, basecoat, clearcoat and cure, and which have an open check. They call quality when a reading is out. Any unit without its coat logged is easy to find.

Quality staff reading film and defects

Quality staff see film thickness readings and defect entries by unit and stage. They hold suspect units. They manage the rework bay. A run of orange peel on one shift shows against that shift and its booth.

Planners checking basecoat against stock

Planners count basecoat paint against stock for each build order, by colour code. A shortage of one colour shows before release. The planner can hold the order back or move it to a later slot.

Decisions to settle before paint stages go live

The paint record copies your own procedures, so you decide how closely it watches. Agree these four with the paint supervisor and quality before the first unit is logged. They are short to settle.

Who may change a film limit

Name who may change a film limit or a weld count. These numbers come from your engineers and paint supplier. The system does not invent them. Each change is recorded, so a unit is judged against its limit.

Which stages record a reading

Decide which stages need a measured reading and which need only a tick. A coat’s thickness suits a reading. Sealer may suit a tick. Make the split with quality, stage by stage, and write it down.

How stages and colours are entered

Your body and paint stage lists, the limits for each coat and the colour codes on your paint card are entered to match your plant. Supervisors review them before use. The load follows your current sheets.

The paint report to open first

Start with rework causes by station. It shows which stage keeps producing the same fault, such as dirt or orange peel. Read it with the paint supervisor after the first shifts, then agree how to act on it.

How paint stages connect to the plant

Paint sits between the body shop and final assembly. Colour comes from the order. It hands defects to rework. After assembly the same unit record carries on to the end-of-line test. These are the links an inspector and a planner use. Every link is a record handed on, not a message sent.

  • Build orders carry the colour code into the paint stages
  • Planning checks basecoat paint against stock before release
  • Rework and defect tracking receives every paint defect
  • Station checks continue the record after the paint line
  • Warranty queries return to the same unit record

Where paint stage records stop

This feature logs what happened to each unit. It does not run the paint booth, the conveyor or the welding robots, which need programmable logic controller (PLC) and line control equipment. It does not match a colour or choose a film limit. Chemical handling and environmental duties stay with the owner and an adviser. A garage painting one kit car a month can use a job sheet.

FAQ

Frequently asked questions

Can film thickness be recorded in microns?

Yes, in microns. Each reading is kept against the limit for its coat. A value outside the limit is flagged on the unit. Quality can then see which unit, which coat and which inspector took the reading.

Does it log every coat for every unit?

It logs the stages you list for your line, from electrocoat through to clearcoat and cure. Each carries a start, a finish and the unit it belongs to. A skipped coat appears as a gap.

How is a paint defect tied to a stage?

The defect entry names the unit, the stage and the type, such as dirt or orange peel. Rework then adds the cause and the fix. Over time, the rework report shows which stage repeats the same fault.

Does it control the paint booth conveyor?

No, conveyors, booths and welding robots stay with PLC and line control equipment. This feature records what happened to each unit as it passed. It never moves the line. It never changes a machine setting.

Can the colour code follow the order into paint?

Yes, the colour code from the paint card travels on the build order and sits on the paint record. The painter sees it. The inspector sees it too, for the unit in front of them.

Where it fits

How this feature fits the system.

Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Variant parts master and bills of materials

Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.

Bill of Materials

Build orders and slot planning

Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.

Production Planning

Station checks and torque records

Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements