Station kitting and line-side feed for vehicle makers

Station kitting issues a kit to each station for each unit, drawn from the variant bill and from released supplier lots. Line-side bins are refilled to a minimum level. Seats and wheels arrive in the order they are fitted. No station waits on a harness, a tailgate hinge or a box of M10 flange bolts.

What a kit and a line-side bin record

Kitting records two kinds of thing. A kit is a set of parts for one unit at one station. A bin holds loose parts for a run of units. Four records describe them, and stores keeps all four. Each has a clear owner.

A kit for one unit

A kit lists the parts that one station fits to one unit. They are taken from the variant bill. The cockpit module, the bumper fascia and a tailgate hinge pair each belong to the station that fits them.

Supplier lot on each kit part

Every part in a kit is drawn from a released lot. The kit remembers which lot it took. That memory is what later joins a lot to a chassis number when a recall or warranty query arrives.

Sequence for seats and wheels

Seats and wheels are issued in the order they are fitted. Sequence matters here. The sequence follows the build orders on the line. A seat meant for a diesel estate never meets a petrol hatchback.

Bin minimum levels and refills

Each line-side bin has a minimum level. When stock falls to it, a refill is due. Small items, such as a box of M10 flange bolts, live in bins and are not counted into each kit.

A shift on the line with kits and bins

Kitting is a daily rhythm between the stores and the stations. A storekeeper builds, a supervisor watches and an operator fits. These four moments show kitting at work. Each one keeps a station from waiting. Read them as one shift.

Stores builds the next kits

The storekeeper reads the released build orders and builds a kit for each station against the variant bill. A diesel estate and a petrol hatchback on adjacent slots get different kits. The bill settles it.

A seat arrives in sequence

The seat for the next unit reaches the station before the unit does. It is the seat that order asked for. The operator fits it and scans its label, and the lot joins the chassis number.

A bin runs to its minimum

The bin of M10 flange bolts at a rear station falls to its minimum level. The refill is due while bolts remain in the bin. Stores tops it up. The operator never stops the line to ask.

A kit part is found short

A harness lot is short. Its kit is already due. The shortage shows to stores and to the planner. A release accepted knowingly is marked as such. The supervisor can see it before the unit arrives.

Who works from kits and what each person sees

Four roles live in the kitting record. Stores builds and issues. The line fits. Planning and quality watch from the side. Each sees the same kit through a different need, and none needs to phone another to ask.

Storekeepers building kits

Storekeepers see the released orders, the kit list for each station and the bin levels. They issue kits from released lots only. A lot that fails first-article approval is held, so it never enters a kit.

Supervisors watching their stations

Supervisors see the kits due at their stations and any part that is short. A driveshaft or harness consignment runs late. They know before the unit arrives. They call stores, not each other, and the answer is on the record.

Operators fitting from the kit

Operators open the kit for the unit in front of them. They fit each part, scan its label and move on. The kit holds only what their station needs. Nothing from another variant is in the box.

Planners reading shortages

Planners see the parts that kitting cannot yet cover, by variant. A shortage shows before release. Subframes, harnesses and glazing are the ones to watch. They decide whether an order goes ahead short or waits.

Decisions to settle before kitting starts

Kitting copies the way your line already works, so a few choices come from you. Settle these four with stores and the line supervisors before the first live kit is issued. A short workshop is enough.

Who may change a bin level

Name who may change a bin’s minimum level. A storekeeper may propose it, but a supervisor may confirm it. Each change is recorded. Nobody should lower a minimum quietly just because a bin looks full today.

Which parts travel as kits

Decide which parts go in a unit kit and which sit in bins. Seats, wheels and modules suit kits. Small fixings suit bins. Draw the line station by station, with the people who fit the parts.

How starting levels are set

Variant bills and part masters are lifted from the spreadsheets you keep now. Opening counts for each bin must be set by hand. Settle who counts them. Do it on a day when the line is quiet.

The kitting report to open first

Begin with subframes, harnesses and glazing short for release, by variant. It shows where a kit will fail. That is before the kit is built. Open it each morning while the line settles into the new routine.

How kitting connects to the rest of the plant

Kitting sits between stores and the line, so it depends on both. It takes released lots from goods inward and gives parts to the stations that fit them. Here are the links a storekeeper uses. Each one is a record that kitting reads or writes.

  • Variant bills decide which parts go into each kit
  • Build orders release the unit that calls for a kit
  • Goods inward supplies the released lots to draw from
  • Station checks scan the part labels that kits carry
  • Warranty and recall traceability joins kit lots to chassis numbers

Where kitting and line feed stop

Kitting tells stores what to issue and when a bin needs a refill. It does not move a trolley or drive a conveyor. Buying decisions, such as how much to order, stay with purchase and the buyer. Counting stock physically stays with stores. A garage building one kit car a month, with one team, can run on a stock sheet and a parts shelf.

FAQ

Frequently asked questions

What triggers a refill of a line-side bin?

Stock in the bin falling to its minimum level triggers it. The refill is due from that point, before the bin runs out. Stores sees which bins are due. A box of M10 flange bolts is refilled in good time.

Which parts go in bins rather than kits?

You decide, station by station. Bulky or sequenced parts, such as seats and wheels, suit a kit. Small fixings, such as M10 flange bolts, suit a bin. The choice is recorded, so stores and the line follow one rule.

What if a part is short when a kit is due?

The shortage shows before release. The order waits, unless the planner accepts it knowingly. Stores and the station supervisor can then see which part is missing and for which unit. Nobody learns of it at the station.

Does a kit change when the engineering revision changes?

It follows the chassis number named in the change. Before that unit, the kit carries the old stabiliser bracket. From that unit, it carries the new one. The change names a unit, not a date. Stores and stations switch together.

Can the plant see which lot went into a kit?

Yes, each kit is drawn from released lots, and the lot is remembered. At the station, scanning the part label joins that lot to the chassis number. A recall query later starts from that lot.

Where it fits

How this feature fits the system.

Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Variant parts master and bills of materials

Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.

Bill of Materials

Build orders and slot planning

Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.

Production Planning

Station checks and torque records

Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements