End-of-line test and certification for vehicle plants
The end-of-line test captures roller brake, headlamp aim, emission, camber, toe-in and shower leak readings against the limits on your test sheet, lane by lane. A test certificate is issued only when every reading passes. One failed reading means a unit cannot be released to the yard.
What the end-of-line test keeps for each unit
A unit reaches the end of the line complete but unproven. Your test sheet for its model turns that into a set of readings. Each one is kept against the unit, lane by lane. It belongs to your plant. Four kinds of record come out of it.
A shift in the end-of-line test bay
The bay is the last place a fault can be found before a dealer finds it. Testers move each unit through the lanes in turn. These four moments show the feature at work. Each one ends in a pass, a fail or a certificate.
Who sees the test results and what each sees
Testers write the readings. Others depend on them. The yard takes only certified units. Dispatch works from the certificates. Quality reads the results as a whole. Each role sees the same unit through its own need.
Decisions to settle before test sheets go live
Your sheet is the heart of this feature, so its rules need agreeing first. Settle these four with quality, the testers and dispatch before the first unit is certified. Each is a short conversation.
How the end-of-line test connects to the plant
This test is the last gate before the yard. It takes finished units from the assembly stations and hands failures to rework. Passed units go on to dealer allocation and dispatch. These are the links quality and dispatch use. Each is a record the next feature reads.
- Station checks complete the unit before it reaches the test
- Rework and defect tracking receives every unit that fails
- Variant and model decide which test sheet applies
- Dealer allocation takes only certified units into the yard
- Warranty queries return to the stored readings and certificate
Where end-of-line testing stops
This feature compares readings with your limits and issues the certificate on a full pass. It measures nothing itself. Calibrating the roller brake bench, the headlamp tester and the emission analyser stays with your quality staff. Type approval and any legal conclusion stay with your compliance staff and an adviser. A garage building one kit car a month can test on a paper sheet.
Frequently asked questions
Can a unit with one failed reading be released?
No, one failed reading blocks it. A certificate is issued only when every reading passes. Without one, a unit cannot be released to the yard. The unit goes to rework, with the failed reading on its entry.
What happens to a unit that fails the shower test?
It goes to the rework bay. The entry names the lane and the reading. Rework then adds the defect code, the cause and the fix, such as a reseated door seal, and the unit is retested.
Does the test sheet differ by model?
Yes, each model has its own limits and its own list of readings. A diesel estate asks for smoke opacity. A petrol hatchback does not. Each sheet follows the variant on the build order, so no unit is asked for a test it does not need.
How is the test certificate issued?
The system issues it when every reading on the sheet passes. It carries the vehicle identification number, the readings and the date. Its layout follows what your market asks for. That is agreed with you during set-up.
Is the first-pass result kept after a retest?
Rework records the retest result on the entry. The first-pass report counts units that passed on the first attempt apart from those that were retested. A lane that keeps failing cannot hide behind its retests.
How this feature fits the system.
Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Variant parts master and bills of materials
Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.
Bill of MaterialsBuild orders and slot planning
Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.
Production PlanningStation checks and torque records
Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.
Work Order ManagementTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements