Engineering change control takes a change to a part, such as a stabiliser bar bracket, through design, quality and purchase sign-off. That change names the chassis number from which it applies. Until every sign-off is recorded, it stays blocked from the line. Then stores and stations switch at the same unit.

What an engineering change record keeps

A change is a record with an owner, a part and a start point. It does not move until it is signed. Four things sit on it, and together they tell stores and the line exactly what changes and when.

Part, revision and stores bin

This record names the part, the new revision and the stores bin it affects. One stabiliser bar bracket is one record. Stores knows which bin holds the old revision and which will hold the new.

The start chassis number

It carries the chassis number from which the change applies. Units before it keep the old part and the old bin. Units from it take the new one. The boundary is a single unit, never a calendar date.

Design, quality and purchase sign-offs

Design, quality and purchase each sign. Every signature is recorded with a name. It sits in approval until all three are in. A missing signature is visible to everyone. It cannot be assumed or waived by phone.

Reason and revised drawing

The reason for the change is written on the record. The revised drawing is attached. A link to your design and drawing revision system can supply it. A buyer reads why the part moved on.

A change from request to first unit

Several hands handle a change before the first unit carries it. A designer raises it, two functions sign, planning picks the start unit and the line switches. These four moments follow one bracket. It travels from request to the first car.

Design raises a bracket change

An engineer raises a change to a stabiliser bar bracket and gives the new revision. The record opens in approval. It stays off the line. Nothing on the shop floor moves because of it yet.

Quality and purchase sign

Quality reviews the revision and signs. Purchase confirms that the supplier can deliver it, then signs too. The names are kept on the record. The change leaves approval only when design, quality and purchase have all signed.

Planning picks the start unit

With the change approved, the planner looks at the build orders in the slot plan and picks the chassis number where the switch is cleanest. That number is attached. From then on it is the line between old and new.

Stores and stations switch together

Earlier units are kitted with the old bracket. From the start number, the kit, the bin and the station instructions carry the new revision. No fitter has to guess. The right bracket is on the record.

Who works from a change and what each sees

A change touches a handful of roles, and each needs a different part of it. Planners need the start unit. Stores needs the bin. The line needs the instruction. Quality needs the sign-off and the trace.

Planners choosing the start unit

Planners see approved changes waiting for a start number. They pick the unit from the slot plan. They attach it. They also see which variants carry the part, so the switch covers every bill that uses it.

Stores and buyers on both revisions

Stores see the old and the new bin, and the number at which they swap. Buyers see the supplier’s delivery of the new revision. The argument over the bins ends. The record says which bin is current.

Supervisors and operators at the switch

Supervisors see the unit at which a station’s instruction changes. Operators see the instruction that belongs to the unit in front of them. The choice is made upstream. A fitter does not have to decide which bracket is right.

Quality staff holding the sign-off

Quality staff review the revision, sign it and later trace it. They read which units carry which revision, by chassis number. A query about a driveshaft revision is answered from the record. No cabinet is opened.

Decisions to settle before change control starts

Change control is a rule about who may do what, so the plant must write the rule first. Agree these four with design, quality, purchase and planning before the first change is raised. Each takes a short meeting.

Who raises and who signs

Name who may raise a change, and who signs for design, for quality and for purchase. Decide whether a second signer covers absence. Because every signature carries a name, the people must be settled first.

Which changes need control

Not every drawing note needs three signatures. Decide which changes are controlled, such as form, fit, function and safety. Leave the rest to the drawing office. Write the rule down so that the shop floor can read it.

How open changes come across

Changes already in progress on paper need a decision. Finish them on paper, or enter them with their start chassis numbers. Stores and quality should review each one before it is loaded. Settle this early.

The report to read first for Engineering change control

Open the rework causes by station, hose, seal and supplier. A cause that repeats may be where the next change begins. Read it with design and quality. Do so before the first change is raised.

How change control connects to the plant

Each change reaches every place that uses the part. It starts in the parts master, passes through approval and then switches the kit and the instruction at one unit. These are the links a planner and a storekeeper rely on. Each is a record that follows the change.

  • The variant parts master takes the new revision
  • Station kitting changes the kit and bin at the start unit
  • Station checks show the new instruction from that chassis number
  • Supplier schedules and part approval carry the revised part’s sample
  • Warranty and recall traceability records which units got which revision

Where engineering change control stops

Change control routes a change, records its sign-offs and sets the start unit. It does not design the part or judge whether the change is right. It is not a drawing system. It can link to one. Type approval and any regulatory conclusion stay with your compliance staff and an adviser. A garage building one kit car a month can use a drawing register.

FAQ

Frequently asked questions

What stops old and new brackets mixing on the line?

The start chassis number. Earlier units are kitted with the old bracket, and later ones take the new bracket. Stores and stations switch together, so nobody on the shop floor has to guess which bin is current.

Can a change be approved but not yet applied?

Yes, once design, quality and purchase have signed, the change can wait for its start chassis number. Until a start unit is attached, the line carries on with the old revision. Stores keeps the old bin.

Who has to sign a change?

Three functions sign. Design, quality and purchase each add a name to the change record. Your plant may add a second signer for a safety part. Approval ends only when every required signature is present.

Does it connect to our drawing system?

Where your design and drawing revision system can be linked, it is connected during implementation. Otherwise the drawing is attached by hand. The link widens the scope. That link is quoted separately in the itemised quotation.

Can we see which cars carry which revision?

Yes, each unit’s chassis number sits against the start number of every change. A query about a revised driveshaft or bracket returns the units before the switch and the units after it. Both lists come from the record.

Where it fits

How this feature fits the system.

Auto Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Variant parts master and bills of materials

Each model, trim, engine and market has its own bill, from subframe to wiper arm. A build order reads only the parts that its variant needs.

Bill of Materials

Build orders and slot planning

Dealer orders become build orders in weekly slots. Short axles, seats or glazing for a slot show before the order is released to stores.

Production Planning

Station checks and torque records

Each unit carries a work order through body shop, paint and trim lines. An operator closes a station only after its nutrunner checks are recorded.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.