What to ask for when choosing software for auto manufacturers.

A checklist built from how auto manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Build orders and variant bills of materials
  • Supplier schedules and goods inward
  • Station checks and torque records
  • End-of-line testing and rework
  • Engineering change control
  • Dealer allocation and dispatch
  • Warranty and recall traceability

Roles that need their own access

Who logs in, and what each person may see or change.

  • For production planners
  • For stores and purchase staff
  • For line supervisors and operators
  • For quality and test staff
  • For dispatch and sales administration

Reports to ask for

Ask to see each one with your own sample data.

  • Build orders by variant against slot plan
  • Parts short for release by variant
  • Supplier delivery and lot rejection history
  • Station defects and torque exceptions
  • End-of-line first-pass results by unit
  • Rework causes by station and supplier
  • Units allocated and in transit by dealer

Systems it may need to connect to

Note which ones you already run.

  • Torque tools and test benches
  • Barcode and label printers
  • Design and drawing systems
  • Supplier portals
  • Accounting software export
  • Dealer ordering systems

Questions for any vendor

Put these to every supplier you are comparing.

  • Can it follow a recall to the exact vehicles?
  • How are variants kept apart on one line?
  • Does it read torque tools and test benches?
  • Can a unit be held if a reading is out of range?
  • How does engineering change control work?
  • Can we manage supplier approval of new parts?
  • Can dealers see where their orders stand?
  • Can it handle bodies fitted to bought-in chassis?
  • How would our part and bill of materials data get in?
  • What would it cost a vehicle plant?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Variant parts are short at the station
  • A supplier lot cannot be traced to units
  • Torque and test readings sit on paper
  • Rework has no owner
  • Engineering changes reach the line late