Manufacturing · Aerospace Manufacturer Management SoftwareOne record for each part, from drawing revision letter to certificate of conformance.
Quotations, customer orders, routings, work orders, mill certificates, AS9102 first article reports, outside processing and shipments sit in one system. Each part carries its drawing revision, the heat of Ti-6Al-4V or 7075-T651 bar it was cut from, the operations performed and the checks signed. Planners, machinists, inspectors and the quality manager read one job.
- Part numbers, routings and special processes entered the way you run them
- Customers, open orders and material stock migrated
- Edits to routings and inspection plans handled by GullySystem staff when asked
Shops that cut aircraft brackets, fittings, manifolds and ground equipment use this software for quotations, routings, material traceability and inspection. Each job holds its drawing revision, mill certificates, operations, nonconformance reports and shipping papers. Any serial number leads back to its billet or forging, and the certificate of conformance is assembled from that record.
What goes wrong before the software.
How the work flows through it, step by step.
- 1
Enquiry and quotation
A request arrives with a drawing, a specification callout and a quantity break. The estimator prices bar or forging, spindle hours, special processes and inspection, and the customer accepts or revises.
- 2
Order review
The accepted purchase order is read for drawing revision, quantity, required certificates and flow-down clauses such as counterfeit-part prevention. Planning and quality both sign before release.
- 3
Routing and work orders
A routing lists each operation in sequence, from sawing to deburr to final wash. Work orders are released to machines, and billet is issued by heat or lot.
- 4
Production and inspection
Operators book spindle time and quantities against each operation. Inspectors record first article and in-process results on the CMM or surface plate, and they raise a nonconformance report when a feature falls outside its tolerance band.
- 5
Special processes
Lots go to approved vendors with a transfer note. On return, the process certificate, whether for anodise film or peening intensity, is matched to the lot. The next step opens.
- 6
Release and shipment
Before anything ships, the quality manager opens the job file, checks the inspection results, signs the certificate of conformance and clears the release. The invoice, packing list and export documents come from that same job.
What is inside.
Every module can be switched on, left out or changed to match how your team already works.
The business modules it is built from.
Each one is also available on its own, or inside a system built for you.
- Estimate/Quotation Management
Each quote is priced from bar, spindle hours, special processes and inspection, and every revision stays linked to the drawing revision it used.
- Order Management
An order holds its revision, quantity, required certificates and ship date, so planning and quality review the same flow-down clauses before release.
- Bill of Materials
Each part number lists its components, fasteners and revision history, so an assembly order pulls the right parts at the right revision letter.
- Work Order Management
Work orders are released by operation to a machine, with operator, booked spindle time and quantity recorded as each step finishes.
- Batch and Serial Tracking
Bar and plate are issued by heat or lot, and a finished serial number can be followed back to its mill certificate and jobs.
- Quality Control
Measured values are recorded against drawing balloons, with inspector, instrument and the pass or fail result kept on the part.
- Job Work Management
Lots sent to approved vendors are tracked out and back, and the returning process certificate is matched to the lot before work continues.
- Asset AMC Tracking
Gauges and fixtures carry a calibration calendar, and a warning appears when a job calls for an instrument past its due date.
How we would put it in.
Setup, data migration, integrations and anything built on top.
Explore moreBrowse business and AI solutions
Looking for another part of your workflow? Browse the modules by business function.
- Applicant Tracking (5)
- CRM (8)
- Finance & Accounting (10)
- Helpdesk (4)
- Human Resources (13)
- Inventory Management (5)
- Project Management (7)
- Manufacturing (6)
- Procurement (4)
- Sales and Distribution (6)
- Field Service (5)
- Statutory and Compliance (4)
- Retail and POS (4)
- Bookings and Appointments (3)
- Subscriptions (2)
- Assets and Fleet (4)
- Platform (6)
- Analytics (2)
- Documents (1)
- All business solutions
One system, each person sees their part.
For owners and plant heads
See open orders, late jobs, vendor lots due back, open nonconformances and amounts owed by each airframe or engine customer on one screen.
For planners and estimators
Price parts and release routings. Schedule machining centres and watch billet, extrusion and forging stock against every open order.
For machinists and operators
See the work orders queued at a machine, load the program number and book spindle time and quantity against each operation.
For inspectors and the quality manager
Record readings from the CMM, height gauge and surface plate, raise and close nonconformance reports, review the job file and sign the release.
For stores and purchasing
Receive bar with its mill certificate, issue it by heat or lot and place orders with material suppliers and plating or heat-treat vendors.
The numbers the owner asks for.
- Quotations by outcome: open, won, lost
- Work orders by machining centre and status
- Billet, plate and forgings issued to each job
- Lots out with vendors and their promised return
- Nonconformance reports by cause and state
- Gauges and probes coming due for calibration
- Shipments and billing by customer
Who this is built for.
- Machine shops cutting precision parts for airframes and turbine engines
- Producers of wing brackets, hydraulic fittings, bushings and fasteners
- Cabin interior, seating and galley trolley manufacturers
- Builders of tow bars, jacks and tooling for airports and hangars
- Suppliers who build to customer drawings and ship a certificate with every lot
When it is not the right choice.
- A small shop making a few parts a year with no serial records can run on drawings and a spreadsheet.
- Repair and overhaul of aircraft already flying is better served by a maintenance system, and general component makers may prefer Manufacturing Production Management Software.
Adapted to your business before it goes live.
You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.
Works alongside
- SMS
- WhatsApp or other messaging
- Accounting software export
- Barcode scanners
- Document storage
Checks to bring to your product demo.
Review these scenarios against the product configuration and record anything that still needs to be agreed.
Enquiries and drawing-based quotations
Which version applies to work that has already started?
Use a revised example from “Enquiries and drawing-based quotations” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Routings and work orders
Is the plan based on demand that is still open?
Review “Routings and work orders” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Questions owners ask before a demo.
Is it for machining, assembly or both?
Both. A machined part runs through a routing of operations. An assembly is built from a bill of materials of parts, rivets and purchased items. Each carries its own inspection record.
Can we trace a serial number to its material?
Yes. Material is received against its certificate and issued by heat or lot. A finished part links back to that melt, the operations it passed through and the inspections signed.
How are drawing revisions controlled?
Each part master holds its revision history, and an order records the revision it was accepted at. Work orders print that revision letter, so the floor does not guess.
Can it handle first article inspection?
Yes. Characteristics are ballooned from the drawing, measured values are recorded against them and the result is kept with the part and its revision. The report layout is set with your quality manager.
Does it follow aerospace quality standards?
It holds the records that AS9100 style systems ask for, but it does not certify your shop. Judging whether your procedures satisfy a standard or a customer clause is work for your quality team and auditors, and we review it with them while configuring.
Can parts go out to vendors for special processes?
Yes. A lot is recorded when it leaves and when it returns, with the vendor’s process certificate attached. The next operation stays blocked until that certificate is on file.
Can our open orders and heat-numbered stock be loaded?
Yes. Part masters, open customer orders and bar or plate stock with heat numbers are taken from your sheets. Your planner then spot-checks a few against the paperwork before the first release.
Who owns the data?
You do. The quotation also states how part, lot and certificate records can be handed back to you.
What does it cost?
Cost follows the seats, the routings and special-process vendors, the inspection plan each customer demands, and whether heat-numbered stock and open orders move over from sheets. No price is published first. The quotation comes after the scope is read and screens are shown on your own part records, with a price against each part so one can be removed.
How long before the machining cells run on it?
That depends on which pain is worst. For an aerospace shop it is part masters with routings, or heat and lot traceability. That part goes onto the floor while inspection and vendor records are still being built. The proposal lists each stage with its dates.
What should the quality manager and planner have ready?
Bring the part number list with drawing revisions, current routings, the heat-numbered stock sheet, the approved vendor list and the gauge register. Sample documents help most: a mill certificate, a first article form and a certificate of conformance. Planning, quality, stores and purchasing each need someone who settles questions as screens appear.
Wondering what it would cost? Share your requirements and an engineer will come back with a scope.
Every part, on its own page.
Each page covers one part of the system: what it records, who uses it and what it hands on.
- Enquiries and drawing-based quotations for aerospace shops
- Customer orders and requirement review for aerospace shops
- Part masters and bills of materials for aerospace makers
- Routings and work orders for aerospace machine shops
- Material, heat and lot traceability for aerospace shops
- Inspection and first article records for aerospace parts
- Nonconformance and corrective action for aerospace shops
- Vendor processes and returns for aerospace shops
- Purchasing and goods receipt for aerospace shops
- Gauge and tooling calibration for aerospace shops
- Shipments, certificates and invoices for aerospace shops
Built for.
The trades this product is set up for. Pick yours to see how the work runs there.
See Aerospace Manufacturer Management Software set up around your records.
Tell us how you run things today. An engineer reads it and writes back with what fits as it is, what would need changing, and what we would start with.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements