Routings and work orders for aerospace machine shops
A routing lists the operations a part goes through, from sawing to deburr to final wash. Work orders release those operations to machines. Billet is issued by heat or lot. Planners see which machining centre, lathe and operator carries each step. Booking spindle time and quantity happens as each step finishes.
What an aerospace routing and work order keep
The routing is the plan for a part. A work order is one run of that plan. Each is a record. Between them they hold the sequence, the machine, the program and the hours, and four groups of fields do that work.
Routings and work orders through a shift
Routings are written once and used on every order. Each work order is lived through one operation at a time, from the saw to the wash. These four moments show who opens the records in an aerospace working day, and for what. Each is short.
Who sees what on routings and work orders
Four roles meet these records, and each looks at a different edge. Planners write the plan. Others carry it out or check it. Below is what each seat sees on the same job.
Routing decisions to settle before set-up
Routings are the plan the floor lives by, so they deserve a clear owner. Agree the following with planning before the first work order is released. Each choice is quick. Leaving one vague is costly.
How routings link to the rest of the shop
Routings sit in the middle of the product. They read from part records and material, and they give work to inspection, outside vendors and shipping. A sound one keeps those teams in step. A loose one pushes confusion on to each of them, and the floor pays for it.
- Takes part number and revision from the part master
- Draws billet by heat or lot from traceability
- Sends finished operations to inspection and first article records
- Hands outside operations to vendor processes and returns
- Gives completed quantities to shipments, certificates and invoices
Where routings and work orders stop
This feature records the plan and what was booked against it. It does not write machine programs, and it does not drive the machines. It does not choose cycle times or decide how a part should be cut. Those calls stay with planners and machinists. A shop making a few parts a year can plan on drawings and a spreadsheet.
Frequently asked questions
Can a routing show steps done outside the shop?
Operations are listed in sequence, and a step such as anodising or peening can sit between machining operations. The lot leaves for the vendor and returns with a certificate. The order stays visible. Planners see where each lot stands.
How do operators book spindle time and quantity?
At the machine, the operator opens the work order queued there and books spindle time and quantity against the operation just finished. It takes a few keystrokes. The booking lands on the job record straight away.
Can planned hours be read beside booked hours?
Both sit on the operation, so a planner reads them side by side. A setup that ran long on the five-axis machine is visible. Estimators can then price the next order from what really happened. That is the point.
Can one routing support several work orders?
A routing belongs to a part. Each work order is a run of that part for a quantity and a revision. The two are linked. Several orders can use the same routing, and each keeps its own booked hours and billet.
Does it control the machining centres directly?
No. The record shows which machine carries each operation and which program number to load. Operators run the machine and book the result. Planning decisions and cutting choices remain with your people, as they do today.
How this feature fits the system.
Aerospace Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and drawing-based quotations
Each quote is priced from bar, spindle hours, special processes and inspection, and every revision stays linked to the drawing revision it used.
Estimate/Quotation ManagementCustomer orders and requirement review
An order holds its revision, quantity, required certificates and ship date, so planning and quality review the same flow-down clauses before release.
Order ManagementPart masters and bills of materials
Each part number lists its components, fasteners and revision history, so an assembly order pulls the right parts at the right revision letter.
Bill of MaterialsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements