Enquiries and drawing-based quotations for aerospace shops
An aerospace enquiry arrives as a drawing, a specification callout and a quantity break. This feature logs it with its revision letter. Bar, spindle hours, special processes and inspection are priced on the record, and every quote revision stays beside the drawing it came from. Estimators and planners work from it.
What an aerospace enquiry record keeps
One enquiry makes one record. Price lines, process notes and quote revisions hang from it, all built around the drawing that arrived. Four groups of fields carry the detail an estimator needs when a buyer rings back about a wing bracket.
A quotation week in a machine shop
Quoting is a run of small decisions squeezed between live jobs. These four moments show the enquiry record in use, from the first email to the buyer’s final answer. Each happens at a different desk. One record serves all of them.
Who reads the drawing-based quotation
Four roles touch a quotation, and each needs a different slice of it. Here is how the record looks from each seat in an aerospace shop. Nobody is shown more than the job requires.
Quotation decisions to settle before set-up
A few choices shape how the enquiry record behaves on its first day. Settle them with the estimator and the quality manager together. Each is quick to agree. Each is awkward to change once live quotes pile up behind it.
Where quotations meet the rest of the shop
A quotation is the first record of a part in this product. What the estimator enters here does not stay here. Order review, planning and quality all read it again. Nothing is keyed twice. A clean quote saves rework on every screen that follows it.
- Accepted quote revision is read at customer order review
- Drawing revision carries into the part master record
- Special process lines match the approved vendor list
- Spindle hours inform the routing and work orders
- Inspection lines point to first article records
Where quotation records stop
This feature records and prices what the buyer asked for. It does not decide what the shop should charge. It does not judge whether a drawing can be machined to its tolerance. Pricing stays a human call. It rests with the estimator and the owner. A shop making a few parts a year can price on a spreadsheet and keep drawings in a folder.
Frequently asked questions
Does each quote revision keep its own drawing revision?
Every quote revision is stored with the drawing revision it was priced from. Say a buyer moves from Rev B to Rev D. You can then see which price belongs to which drawing. Old prices stay readable.
Can I price special processes sent to outside vendors?
Anodising, peening, heat treatment and penetrant inspection are entered as lines on the quote, each with the specification it must meet. The cost of the outside step sits beside the machining cost. Estimators see both together.
How do I see which quotes were won or lost?
Mark each quotation open, won or lost. The list of quotations by outcome then groups them for the owner. Lost quotes stay on file. A repeat enquiry can start from the old price and its drawing.
Can one quote hold several quantity breaks?
A buyer may ask for several breaks on one drawing. Each break becomes a price line with its own spindle hours and bar. None is lost when the buyer settles on a single figure. That choice is recorded too.
Who in the shop can see quoted prices?
Access follows the roles agreed at set-up. Estimators and owners see prices. Machinists at a machine need only the work order. Settle this with your planner during implementation, so floor screens carry no cost lines.
How this feature fits the system.
Aerospace Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and drawing-based quotations
Each quote is priced from bar, spindle hours, special processes and inspection, and every revision stays linked to the drawing revision it used.
Estimate/Quotation ManagementCustomer orders and requirement review
An order holds its revision, quantity, required certificates and ship date, so planning and quality review the same flow-down clauses before release.
Order ManagementPart masters and bills of materials
Each part number lists its components, fasteners and revision history, so an assembly order pulls the right parts at the right revision letter.
Bill of MaterialsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements