Material, heat and lot traceability for aerospace shops
Aerospace buyers want to know which melt a part was cut from. This feature receives bar, plate and forgings against mill certificates and issues them to jobs by heat or lot. Any serial number can then be followed back to its melt. Stores, quality and planners read the same trail.
What heat and lot records hold in aerospace
Traceability starts at the receiving bay, where bar arrives with its paperwork. Each bar becomes a record. Four groups of fields let a serial number be followed back to the melt it was cut from. Without that tie, a customer query turns into a search through folders.
Traceability through a week of bar and billet
Material moves through an aerospace shop in a few clear steps, and the record follows each one. These four moments show who touches a heat from the receiving bay to a customer’s question about a serial number. None needs a special tool.
Who sees heat and lot records, and how
Material records are read at the stores counter, at the machine and at the quality desk. Four roles use them, each for a different question. Here is each seat’s view.
Traceability decisions to settle before set-up
Traceability is only as good as the discipline at the stores counter. Agree four rules with stores and quality before the first bar is received. They are short to settle. They decide how clean the record stays.
How heat records connect to the shop
Material is the start of every part, so the heat record touches nearly everything that follows. It takes its rules from the part master and its paper from the supplier. It then hands the melt on to work orders, inspection and the shipping papers. These are the main links.
- Takes material specification from the part master
- Receives against purchase orders and goods receipt
- Issues heat or lot to routings and work orders
- Ties inspection results to the heat each part used
- Gives melt details to the certificate of conformance
Where heat and lot records stop
This feature keeps the trail from melt to serial number. It does not test material, and it does not judge whether a certificate meets a specification. That reading stays with the quality manager. Supplier approvals and audits stay with your auditors. A small shop with no serial records and a few parts a year can track bar on a sheet.
Frequently asked questions
What is held on the receipt when bar arrives?
The receipt holds the supplier, the heat or lot number, the quantity and the mill certificate. Receipts are raised against the purchase order. The certificate stays attached, so a later query finds the paper where the bar was received.
Can one job draw bar from two heats?
Issues are recorded by heat or lot, so a job that draws from two heats carries two issue lines. Each line keeps its own heat number. A serial number from that job leads to the heat it was cut from.
Where does a hardness report go?
It stays with the mill certificate on the heat record, so it travels with the material. A page missing at receipt can be noticed then. Chasing the supplier is easier at the dock. It gets harder months later.
Can stores see how much of a heat remains?
Stock is held by heat or lot with the quantity left. Before a job is released, stores and planning can see whether the heat will cover it. A short heat is a conversation today. It need not become a stoppage.
Does the product judge whether a certificate is acceptable?
No, the product does not judge it. It holds the supplier’s mill certificate and links it to the material and the jobs. Whether the chemistry or test results satisfy the specification is for your quality manager and the customer’s own requirements.
How this feature fits the system.
Aerospace Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and drawing-based quotations
Each quote is priced from bar, spindle hours, special processes and inspection, and every revision stays linked to the drawing revision it used.
Estimate/Quotation ManagementCustomer orders and requirement review
An order holds its revision, quantity, required certificates and ship date, so planning and quality review the same flow-down clauses before release.
Order ManagementPart masters and bills of materials
Each part number lists its components, fasteners and revision history, so an assembly order pulls the right parts at the right revision letter.
Bill of MaterialsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements