Skip to main content
GullySystem

Thickness, adhesion and inspection records

A finished lot is only as good as its readings. This feature stores gauge readings and adhesion or salt spray checks against the lot, each beside the drawing requirement, with a pass or fail result. Technicians key or import the figures. Quality staff read one record. Dispatch sees the answer.

Samples from a finished lot at the bench

Racks come off the line and a sample from each lot goes to the laboratory bench. The technician has a hand-held gauge, a drawing and a queue of lots. Every reading must land against the right lot, with the right limit beside it. That is the day around the gauge. It is busy.

A gauge file from the morning

Readings from the hand-held gauge are imported by file, or keyed in where the gauge cannot export. Each lands on its lot. The drawing’s minimum and maximum appear beside the figure. No sheet of paper is needed.

A reading falls below the minimum

A bolt reads under the drawing’s minimum, and the lot is marked for review. The technician retests another piece. Both results stay on the record. A low reading never disappears behind a good one.

The salt spray check is booked

A salt spray check is raised against the lot with its requirement from the drawing. The lot shows as waiting for it. When the result comes back, pass or fail is entered. Then the lot moves on.

A failed lot waits for a decision

A lot that fails sits held. Inspector and planner choose between strip and replate, or a call to the customer. The decision is written against the lot. Nobody wonders later who agreed.

Inspection fields kept against every lot

Inspection produces a lot of small facts. Kept in a book, they are hard to match to a lot when a customer asks. Kept against the lot, they answer in seconds. Four kinds of fact carry the whole story, and each one is listed here.

Gauge readings with piece and date

Each thickness reading is stored with its lot, the piece sampled and the date. Several readings per lot are kept, not a single average. The lowest is easy to find. The technician’s name goes with them.

Drawing limits beside each reading

The minimum and maximum thickness come from the stored part entry and sit next to every figure. A reading is judged against the limit that applied to that lot. Nobody checks a drawing by hand.

Adhesion and salt spray results

Adhesion tests and salt spray checks are stored with the lot, the test required and the result. A check that has not finished shows as open. Later results join the same record. Nothing is filed apart.

Pass or fail and the decision

Each lot carries a pass or fail result. A failed lot also carries the decision taken, such as strip and replate. The inspector’s name is attached. The lot’s history then reads as one clear sequence.

For the bench, the desk and the dock

Inspection touches several desks. Technicians produce the readings. Others rely on the verdict. Each sees the same lot, with the part that matters to them in front. Nobody retypes a figure to pass it on.

For the technician at the gauge

Reads samples, imports or keys the figures and records each check. Sees the limit next to the reading, so a failure is obvious at once. Pass or fail is entered the moment the check ends. Entries are quick.

For the quality inspector clearing a lot

Reviews lots with a low reading or an open check. Decides what happens to a failed lot. Sees the full history in one place. No hunting through books. Sign-off follows from the record.

For dispatch waiting on a result

Sees which lots have passed and which still wait for a check. Only passed lots reach the packing bench. A lot with an open salt spray check stays put. Dispatch never guesses.

For the owner answering a complaint

Pulls up the lot, reads the thickness against the drawing and sees the checks that were run. A customer’s question about a finish gets a factual answer. It comes from the readings. Memory plays no part.

Where inspection results travel next

Readings and verdicts are used again and again. The certificate quotes them, the reject entry starts from them, and the office answers customers with them. Because they sit against the lot, each of those steps reads them without retyping a figure. Nothing drifts out of step.

  • Specification limits come from the stored part entry
  • Failed lots pass to rejects, stripping and replating
  • Passed lots feed the certificate of conformance
  • Rack loads show where a low reading came from
  • Bath trend sits beside thickness readings by lot

Inspection choices to make with your quality inspector

Inspection practice differs between shops and between customers. Agree the rules before the first reading is keyed in. They decide how much the record can be relied on. Leave nothing to the habits of one technician.

Who may retest a low reading

A retest is reasonable, but a string of them hides a problem. Decide who may order one, and whether the first result stays on the record. Keeping both protects the shop in a dispute.

Which pieces make a sample

Customers and drawings ask for different sample sizes. Decide what the shop reads for each part, and where that rule is written. The reading count then matches what the customer was told.

Whether gauge files are imported or keyed

Import saves typing but needs the gauge to export. Keying works with any gauge. Pick one method per gauge. Mixed habits make the record uneven from lot to lot.

Who rules on a failed lot

Strip, replate, scrap or ask the customer. Name the person who chooses. If the quality inspector and the owner disagree, the order of authority must already be agreed. Write the decision down.

What an inspection record cannot judge

The record keeps readings, limits and results. It cannot calibrate a gauge or interpret a test standard. Nor can it say whether a reading is believable. Those judgments stay with the technician, the quality inspector and the customer. A shop with one gauge and a few lots a week can log readings in a book.

FAQ

Frequently asked questions

Can several readings be kept for one lot?

Each reading is stored with its piece and date, so a lot holds the readings the sample plan needs. The lowest reading is easy to find. No average replaces the individual figures on the record.

Who decides what happens to a failed lot?

Whoever your shop names, such as the inspector with the planner. That is the rule. The system records the decision and holds the lot until then. It never chooses between strip, replate or a call to the customer. People do.

How are gauge readings brought in from a file?

The gauge’s file is imported and each reading is joined to its lot. Where a gauge cannot export, the technician keys the figures. Either way the limit appears beside the reading. It comes from the stored part entry.

Can a salt spray result arrive after the thickness?

A check that has not finished shows as open against the lot. When the result arrives it joins the same record. Dispatch sees the lot still waiting. Thickness alone does not clear it for packing.

Does it track the calibration of our gauges?

Gauge calibration is not part of this feature. Your laboratory keeps those records as it does today. The readings imported or keyed here come from whichever gauge the technician used, and the record shows the date.

Where it fits

How this feature fits the system.

Plating Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Customer lots and receiving

Every delivery is booked in as a numbered lot with count and weight, so the same parts can be traced from the gate to dispatch.

Batch and Serial Tracking

Work orders and line scheduling

A work order carries the finish, thickness and due date, and each tank sees which lots are queued next on its route.

Work Order Management

Racks, barrels and loading

Lots with a compatible finish are grouped onto racks or into barrels by count and surface area, before they enter the first bath.

Production Planning
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements